Two stories - detached, small or mid-size
336 BETHEL AVENUE
STATEN ISLAND · BIN 5175336
💬 Discuss this project
2022Year Built
2Stories
A1Building Class
R3AZoning
2,022 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,688 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 220p · 3 filings · 20 docs
Floor 126p · 3 filings · 20 docs
Basement20p · 3 filings · 20 docs
Sub-Basement1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect410/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patricia L Gass803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Steadfast ConstructionGeneral Contractor707/08/2026
Flow-Right Plumbing & HeatingPlumbing207/08/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677510/05/2023
Building Lifecycle
10/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
10/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
10/16/2023
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
10/16/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
10/16/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSteadfast Construction06/01/2023
DOB NOWGeneral ConstructionPermit IssuedSteadfast Construction10/11/2022
DOB NOWPlumbingSigned-offQuality Plumbing08/31/2022
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating08/10/2022
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating08/08/2022
DOB NOWStructuralPermit IssuedSteadfast Construction06/22/2022
1 project · most recent 10/05/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/05/2023Signed-offFlow-Right Plumbing & HeatingGas, Storm, Water/Sanitary
1 project · most recent 09/08/2022
General Wiring
FiledStatusContractorScope
09/08/2022CompleteJ.P.E. Electrical ContractorsGeneral Wiring
1 project · most recent 10/05/2023
Concrete Wood
FiledStatusContractorScope
10/05/2023Signed-offSteadfast ConstructionConcrete, Wood
1 project · most recent 10/05/2023
Earthwork
FiledStatusContractorScope
10/05/2023Signed-offSteadfast ConstructionEarthwork
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/13/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/15/2022Pass-Final PL - UndergroundPassView ↗
09/14/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/13/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
10/16/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
10/16/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
10/16/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
10/16/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
10/16/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
10/16/2023Mechanical SystemsWILLIAM MONTAGUEspecial
10/16/2023Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
10/16/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
10/16/2023Wood – Prefabricated I-JoistsWILLIAM MONTAGUEspecial
10/16/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
10/16/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
10/16/2023FinalWILLIAM MONTAGUEprogress
10/16/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
10/16/2023Structural Wood FrameWILLIAM MONTAGUEprogress
10/16/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
10/16/2023Footing and FoundationWILLIAM MONTAGUEprogress
10/16/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
10/16/2023Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
10/16/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
10/16/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
10/16/2023Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
10/16/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
10/16/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
10/16/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
10/16/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
Latest 25 of 59.