Miscellaneous commercial condo
Glassworks Apartments
336 HIMROD STREET · BIN 3326367
💬 Discuss this project
1988Year Built
5Stories
R5Building Class
R6Zoning
74,982 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized13 Open Violations 12 unresolved · 1 paperwork only ▸FDNY Report ↗
Miscellaneous commercial condo · Owner of record: HIMROD DEVELOPMENT LLC · 24,000 sf lot · 3.12 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 1 filing · 20 docs
Floor 4Under Construction7p · 1 filing · 7 docs
Floor 3Under Construction7p · 1 filing · 7 docs
Floor 2Under Construction7p · 1 filing · 7 docs
Floor 1Under Construction21p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JAJAR1807/08/2026
OWNERS REP407/08/2026
TITAN REALTY CONSTRUCTI703/22/2026
HIMROD DEVELOPMENT2103/21/2026
PARSONS CONSTRUCTION403/21/2026
J G GNRL CONTRACT303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AKM ARCHITECTS LLP205/18/2026
IAQ SYSTEMS INC409/19/2025
AMA ARCHITECTS PC104/19/2024
BAILEYS ENGINEERING PC102/09/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASO ASSOCIATES1003/21/2026
T C ENTERPRISES203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor407/08/2026
DDS MECHANICAL FPS CORPFire Protection106/28/2026
CH CO INCGeneral Contractor104/09/2026
DAVID CONSTRUCTING NY, INGeneral Contractor107/08/2026
THREE W ENTERPRISES INCGeneral Contractor107/08/2026
GENESIS PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746605/18/2026
KEU ARCH. STUDIO PC5385104/19/2024
Building Lifecycle
All (145)Filed (8)Permit Issued (7)Signed Off (2)Violation (44)Inspection (10)Objection (48)Special Inspection (26)
09/04/2026
Signed off — Alteration
COMPLETE MECHANICAL BUILD OUT OF THE FIRST FLOOR MEDICAL OFFICE SPACE
B01164512-S1
06/29/2026
Violation issued (HPD, open)
A
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, open)
A
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
B
06/09/2026
Permit issued — Mechanical Systems
B01164512-S2-MS
05/27/2026
Special inspection requirement — Final
Stephen Shishko
05/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
05/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Stephen Shishko
05/18/2026
Filed — Alteration
COMPLETE MECHANICAL BUILD OUT OF THE FIRST FLOOR MEDICAL OFFICE SPACE
B01164512-P2
04/27/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/21/2026
Permit issued — General Construction
B01034041-I1-GC
11/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/29/2025
Special inspection requirement — Post-installed Anchors
Stephen Shishko
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
10/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
10/20/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
10/15/2025
Objection resolved — Addressed
10/14/2025
Objection raised — Admin
10/10/2025
Objection raised — Cost
10/10/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Cost
09/25/2025
Objection resolved — Addressed
09/22/2025
Objection raised — Cost
09/19/2025
Filed — Alteration
COMPLETE MECHANICAL BUILD OUT OF THE FIRST FLOOR MEDICAL OFFICE SPACE
B01164512-P1
08/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/18/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
08/11/2025
Violation issued (HPD, open)
C
08/11/2025
Violation issued (HPD, open)
B
07/21/2025
Permit issued — Sprinklers
B01164512-S3-EW-SP
07/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2025
Objection resolved — Addressed
06/20/2025
Objection raised — Fire_Protection
06/18/2025
Objection resolved — Addressed
05/26/2025
Objection resolved — Addressed
05/17/2025
Violation issued (HPD, closed)
C
05/17/2025
Violation issued (HPD, closed)
A
05/14/2025
Objection raised — Fire_Protection
05/14/2025
Objection raised — Fire_Protection
05/12/2025
Permit issued — Plumbing
B01164512-S1-PL
04/25/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
04/11/2025
Objection resolved — Addressed
02/21/2025
Permit issued — General Construction
B01164512-I1-GC
01/31/2025
Objection resolved — Addressed
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDAVID CONSTRUCTING NY, IN06/09/2026
DOB NOWGeneral ConstructionPermit IssuedCH CO INC01/21/2026
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP07/21/2025
DOB NOWPlumbingSigned-offGENESIS PLBG AND HTG CORP05/12/2025
DOB NOWGeneral ConstructionSigned-offTHREE W ENTERPRISES02/21/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/09/2018
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC02/09/2018
BIS—ISSUEDTITAN REALTY & CONSTRUCTI04/12/2018
BISCCISSUEDTITAN REALTY & CONSTRUCTI10/04/2017
BISPLISSUEDBROOK PLUMBING & HTG CORP07/28/2017
BISEQISSUEDTITAN REALTY & CONSTRUCTI05/22/2017
BIS—ISSUEDTITAN REALTY & CONSTRUCTI05/22/2017
BISEQISSUEDPARSONS CONSTRUCTION INC10/21/2016
BISEQISSUEDPARSONS CONSTRUCTION INC09/29/2016
BISPLISSUEDBROOK PLUMBING & HTG CORP06/30/2016
BISEQISSUEDTITAN REALTY & CONSTRUCTI05/18/2016
BIS—ISSUEDTITAN REALTY & CONSTRUCTI05/18/2016
BISEQISSUEDJ& G GNRL CONTRACT INC02/12/2016
BIS—ISSUEDTITAN REALTY & CONSTRUCTI05/15/2015
BIS—ISSUEDTITAN REALTY & CONSTRUCTI05/15/2015
BISEQISSUEDTITAN REALTY & CONSTRUCTI05/15/2015
1 project · most recent 05/18/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
05/18/2026Permit IssuedDAVID CONSTRUCTING NY, INHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 05/18/2026
Sprinkler System
FiledStatusContractorScope
05/18/2026Signed-offDDS MECHANICAL FPS CORPSprinkler System
1 project · most recent 05/18/2026
Water/Sanitary
FiledStatusContractorScope
05/18/2026Signed-offGENESIS PLBG AND HTG CORPWater/Sanitary
2 projects · most recent 03/10/2025
General Wiring
FiledStatusContractorScope
03/10/2025Permit IssuedUNITED ELEC'L CONT'G CORPGeneral Wiring
11/13/2018CompleteCOUNTY ELECL CONTRACTOR I—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/27/2026Pass-Final PL - UndergroundPassView ↗
11/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/20/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/18/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/27/2026FinalStephen Shishkoprogress
05/27/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
05/27/2026Tenant Protection Plan Compliance—special
05/27/2026Fire-Resistance Rated ConstructionStephen Shishkoprogress
10/29/2025Post-installed AnchorsStephen Shishkospecial
10/29/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
10/29/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
10/29/2025Tenant Protection Plan ComplianceStephen Shishkospecial
01/13/2025Tenant Protection Plan ComplianceStephen Shishkospecial
01/08/2025Shutoff dampersStephen Shishkoenergy_progress
01/08/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
01/08/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/08/2025Interior lighting powerStephen Shishkoenergy_progress
01/08/2025Lighting controlsStephen Shishkoenergy_progress
01/08/2025Maintenance informationStephen Shishkoenergy_progress
01/08/2025Post-installed AnchorsStephen Shishkospecial
01/08/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
01/08/2025Heating SystemsStephen Shishkospecial
01/08/2025Mechanical SystemsStephen Shishkospecial
01/08/2025FinalStephen Shishkoprogress
01/08/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
04/11/2024Fenestration air leakageAmath Baenergy_progress
04/11/2024Fenestration areasAmath Baenergy_progress
04/11/2024Tenant Protection Plan ComplianceKoko Uyospecial
04/10/2024FinalAmath Baprogress
Latest 25 of 26.
▾Documents — 242 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026B00017772-I1Request digital key ↗
08/25/2026B01034041-I1Request digital key ↗
08/23/2026B01164512-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION28
12/11/2018340349947Open ↗
08/23/2018340171003Open ↗
08/14/2018340171003Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION14
10/05/2017320936822Open ↗
06/15/2017320594317Open ↗
05/24/2017320594317Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
10/16/2018340554723Open ↗
01/03/2018340554723Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/25/2017320594317Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/15/2014320594317Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT I: CERTIFICATION1
02/28/2018320594317Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/27/2014320594317Open ↗
▸BISZONING RESOLUTION DETERMINATION1
01/28/2015320594317Open ↗
▸BISZONING DIAGRAM1
01/28/2015320594317Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/28/2018320594317Open ↗
▸Seals & Professional Certifications57
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
10/24/2018320594317Open ↗
10/01/2018320936822Open ↗
10/01/2018320936822Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/10/2026B01034041-I1Open ↗
09/10/2026B01034041-I1Open ↗
09/10/2026B01034041-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026B00017772-I1Open ↗
08/23/2026B01164512-S3Open ↗
08/23/2026B01164512-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/10/2026B01034041-I1Open ↗
09/01/2026B01164512-S1Open ↗
09/01/2026B01164512-S1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/27/2016340427602Open ↗
09/27/2016340427611Open ↗
02/09/2016340349947Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/27/2016340427602Open ↗
09/27/2016340427611Open ↗
02/09/2016340349947Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/27/2016340427602Open ↗
09/27/2016340427611Open ↗
02/09/2016340349947Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/27/2014320936822Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/03/2018340554723Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING3
01/18/2018320594317Open ↗
11/03/2017320594317Open ↗
06/11/2014320594317Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/04/2018320594317Open ↗
▸BISEQUIPMENT USE PERMITS1
08/17/2018320594317Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/17/2018320594317Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
12/11/2014320594317Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/19/2018320936831Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
11/16/2017320594317Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN4
12/28/2018320594317Open ↗
12/14/2018320594317Open ↗
10/22/2018340554723Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
12/14/2018320594317Open ↗
01/03/2018340554723Open ↗
10/27/2014320594317Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
12/14/2018320594317Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/03/2018340554723Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/15/2015320594317Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/15/2015320594317Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/28/2018320594317Open ↗
03/28/2018320594317Open ↗
11/09/2017320594317Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
05/16/2018320594317Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/11/2014320594317Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/27/2016340427602Open ↗
09/27/2016340427611Open ↗
02/09/2016340349947Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/16/2016320594317Open ↗
05/15/2015320594317Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
10/16/2018340554723Open ↗
10/01/2018320936822Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/16/2016320594317Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/11/2014320594317Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/27/2014320594317Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
12/11/2014320594317Open ↗
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
02/19/2019320594317Open ↗
01/16/2019320594317Open ↗
01/14/2019320594317Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
03/19/2018320594317Open ↗
01/28/2015320594317Open ↗
12/16/2014320594317Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
09/15/2014320594317Open ↗
09/15/2014320594317Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/16/2018340554723Open ↗
04/19/2018320594317Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/27/2014320936822Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/03/2018340554723Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE3
06/15/2017320594317Open ↗
05/23/2017320594317Open ↗
05/15/2015320594317Open ↗
▸BISCOST AFFIDAVIT3
05/16/2018320594317Open ↗
05/08/2018320936831Open ↗
12/11/2014320594317Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
10/16/2018340554723Open ↗
▸Filing & Intake Forms47
▸BISBOROUGH INTAKE FORM19
01/16/2019320594317Open ↗
01/14/2019320594317Open ↗
01/11/2019320594317Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION17
01/16/2019320594317Open ↗
01/11/2019320594317Open ↗
12/21/2018320594317Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
01/03/2018340554723Open ↗
09/27/2016340427602Open ↗
09/27/2016340427611Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET3
02/28/2018321797061Open ↗
08/27/2014320936822Open ↗
08/12/2014320936831Open ↗
▸Other Documents5
▸BISBPP - SUPPORTING DOCUMENTATION2
01/03/2018340554723Open ↗
01/03/2018340554723Open ↗
▸BISPLOT DIAGRAM2
11/16/2017320594317Open ↗
10/27/2014320594317Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/16/2017320594317Open ↗