ECB08/25/2026ATOI OBSERVED CONTINUOUS WORK WHILE ON A SWO. HORIZONTAL/VERTICAL ENLARGEMENT ON ROOF. WORK IS APPROX 90% COMPLETE. COMP # 3A07835 .VIO 39143367Z, 39143354Z,39143368J., COMPLY WITH STOP WORK ORDER$10K due
DOB10/03/2001ECB
DOB07/10/2001WORK W/O PERMIT. NOTED: A ROOF LEVEL AN 18" HIGH PLATFORM WITH TAR PAP ER AND FLASHING WAS CONSTRUCTED ON TOP OF EXISTING ROOF CREATING A PLENUM BET. THE 2 ROOF ADN HOUSING A LIBERTY SUMP PUMP 115V 60HZ TO PUMP WATER THROUGH A 1.5" HOSE TO GUTTER AT REAR OF BLDG. REMEDY: REMOVE ILLEGAL ROOF STRUCTURE AND SUMP PUMP
DOB02/16/2001WORK WITHOUT PERMIT. WORK NOTED: AT ROOF LEVEL A 18" HIGH PLATFORM WITH TAR PAPER & FLASHING WAS CONSTRUCTED ON TOP OF EXISITNG ROOF CREATING A PLENUM (SPACE) BETWEEN THE 2 ROOFS & HOUSING A LIBERTY SUMP PUMP 115V 60HZ TO PUMP WATER THRU A 1 1/2" HOSE TO GUTTER AT REAR OF BLDG. REMEDY: REMOVE ILLEGAL ROOF STRUCTURE & SUMP PUMP
DOB02/16/2001WORK WITHOUT A PERMIT. WORK NOTED: AT ROOF LEVEL A 18" PLATFORM EXIST WITH TARPAPER & FLASHING CEMENT CONSTRUCTED ABOVE ORIGINAL ROOF CREAT- ING A PLENUM (SPACE) BETWEEN THE 2 ROOFS. NOTE: RESTING INSIDE A 16"X 16" SQ HOLE AS A LIBERTY SUMP PUMP 115V 60HZ CONNECTED TO AN EXTENSION REMEDY: REMOVE THE ILLEGAL STRUCTURE - SUMP PUMP & PROTECT
ECB03/31/2025NOTED: WORK WITHOUT PERMIT PSWO ISSUED FOR ALL GENERAL CONSTRUCTION CARPENTRY DEMOLITION IRON WORK ECT ON ALL FLOORS INTERIOR AND EXTERIOR APPROX 50 % WORK IS COMPLETED ONLY WORK ALLOWED IS CLEAN UPS AND SAFETYNothing owed — awaiting certificate of correction
ECB03/31/2025NOTED: WORK WITHOUT PERMIT PSWO ISSUED FOR ALL PLUMBING WORK BEING DONE ON THE RESIDENT, OBTAIN PERMITNothing owed — awaiting certificate of correction
ECB10/03/2001FAILURE TO MAINTIAN BUILDING : DEFECT IS : DEFECTIVE LEEDER'S & GUTTER'S DRAINAGE FROM REAR OF ROOF WATER IS LEAKING BY THE 2ND FLOOR STAIRWAY BY BUILDING FIRE WALL INTO 335 22 ST AREA 2ND FLOOR STAIR'S DEBRISNothing owed — awaiting certificate of correction
ECB07/10/2001WORK WITHOUT A PERMIT:WORK NOTED:AT ROOF LEVEL A 18" HIGH PLATFORM WITH TAR PAPER & FLASHING WAS CONSTRUCTED ON TOP OF EXISTING ROOF CREATING A PLENUM(SPACE)BETWEEN THE TWO ROOF & HOUSING A LIBERTY SUM PUMB 113Nothing owed — awaiting certificate of correction
ECB05/16/2001WORK W/O PERMIT.WORK NOTED:AT ROOF LEVEL A 18"HIGH PLATFORM EXIST W/TAR PAPER & FLASHING CEMENT CONSTRUCTED ABOVE ORIGINAL ROOF CREATING A PLENIUM(SPACE)BETWEEN 2 ROOFS.NOTE:RESTING INSIDE A 16"X16" SQ.HOLE ISNothing owed — awaiting certificate of correction
ECB02/16/2001WORK WITHOUT A PERMIT,WORK NOTED AT ROOF LEVEL A 18"HIGH PLLATFORM WITH TARPAPER AND FLASHING WAS CONSTRUCTED ON TOP OF EXISTING ROOF.CREATING A PLENUM(SPACE)BETWEEN THE TWO ROOFS AND HOUSING A LIBERTY SUMP PUMNothing owed — awaiting certificate of correction