← Back
BuildNYC
Church, synagogue, chapel
337 74TH STREET
BROOKLYN · Bay Ridge · BIN 3339304
💬 Discuss this project
1931Year Built
1Stories
M1Building Class
R5BZoning
141,389 sfGross Floor Area
5Units
5 Active Violations 0 unresolved · 5 paperwork only 2 old, status unconfirmed ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: The Roman Catholic Church of Our Lady of the · 45,287 sf lot · 3.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHoly Angels Catholic Academy22p · 2 filings · 20 docs
Floor 3Holy Angels Catholic Academy45p · 1 filing · 20 docs
Floor 2Holy Angels Catholic Academy41p · 1 filing · 20 docs
Floor 1Holy Angels Catholic Academy52p · 3 filings · 20 docs
CellarRocklyn Asset CORP2p · 2 filings · 12 docs
BasementHoly Angels Catholic Academy12p · 1 filing · 20 docs
Sub-BasementHoly Angels Catholic Academy33p · 1 filing · 20 docs
Site & exteriorHoly Angels Catholic Academy14p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset3707/08/2026
R C Church of Our Lady of A1103/21/2026
Nycsca103/22/2026
Our Lady of Angels Church103/22/2026
Heartshare Human Services103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph Botta, PE302/19/2023
STV708/19/2022
Enthink Engineers306/27/2022
Siri + Marsik Architects205/12/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants403/21/2026
STV1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Above & Beyond P & HPlumbing707/08/2026
Reliable EnterprisesScaffold603/21/2026
Ashnu InternationalGeneral Contractor403/21/2026
Rain Guard ConstructionGeneral Contractor303/21/2026
Caputek Electrical ServicesElectrical103/21/2026
Eagle 1 MechanicalPlumbing107/08/2026
Spieler & Ricca Electrical CoElectrical103/21/2026
Stanco System Electrical ContElectrical103/22/2026
Tuxedo Electrical ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joseph Botta, PE1139302/19/2023
Future Tech Consultants O589708/19/2022
Building Lifecycle
All (122)Filed (15)Permit Issued (9)Signed Off (3)Violation (60)Inspection (5)Special Inspection (30)
05/11/2026
Violation issued (ECB, open)
Construction
03/13/2026
Violation issued (FDNY_ORDER, closed)
08/07/2025
Violation issued (FDNY_ORDER, closed)
08/07/2025
Violation issued (FDNY_ORDER, closed)
12/03/2024
Violation issued (FDNY_NOV, closed)
08/19/2024
Violation issued (ECB, closed)
Elevators
08/19/2024
Violation issued (ECB, closed)
Elevators
05/24/2024
Signed off — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-I1
05/24/2024
Signed off — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-S1
08/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/04/2023
Signed off — Alteration
Facade and roof restoration as indicated on drawings.
B00704478-I1
08/04/2023
Permit issued — Plumbing
B00781894-I1-PL
08/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/02/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
02/19/2023
Filed — Alteration
Removal of existing gas piping and domestic hot water heater in cellar. No change in use, occupancy or egress.
B00750225-P1
08/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
08/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michael Marchese
08/22/2022
Special inspection requirement — Lighting controls
Michael Marchese
08/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Marchese
08/22/2022
Special inspection requirement — Electrical motors and elevators
Michael Marchese
08/22/2022
Special inspection requirement — Post-installed Anchors
Michael Marchese
08/22/2022
Special inspection requirement — Structural Steel - Details
Michael Marchese
08/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
08/22/2022
Special inspection requirement — Structural Steel - Welding
Michael Marchese
08/22/2022
Special inspection requirement — Shutoff dampers
Michael Marchese
08/22/2022
Special inspection requirement — Masonry
Michael Marchese
08/22/2022
Special inspection requirement — Concrete - Cast-In-Place
Michael Marchese
08/22/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Michael Marchese
08/22/2022
Special inspection requirement — Mechanical Systems
Michael Marchese
08/22/2022
Special inspection requirement — Maintenance information
Michael Marchese
08/22/2022
Special inspection requirement — Sprayed fire-resistant materials
Michael Marchese
08/22/2022
Special inspection requirement — Final
Michael Marchese
08/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
08/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
Michael Marchese
08/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
08/22/2022
Special inspection requirement — Interior lighting power
Michael Marchese
08/22/2022
Special inspection requirement — Exterior lighting power
Michael Marchese
08/19/2022
Filed — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-P5
08/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
08/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
08/18/2022
Special inspection requirement — Maintenance information
Michael Marchese
08/18/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
08/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Marchese
08/16/2022
Filed — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-P3
08/16/2022
Filed — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-P4
08/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
08/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
08/03/2022
Permit issued — Plumbing
B00781894-I1-PL
07/31/2022
Filed — Alteration
Installation of new Electric Domestic Hot Water Heater. No change in use, occupancy or egress
B00781894-I1
06/27/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00681498-P1
06/09/2022
Permit issued — Plumbing
B00750225-I1-PL
06/03/2022
Filed — Alteration
Removal of existing gas piping and domestic hot water heater in cellar. No change in use, occupancy or egress.
B00750225-I1
05/17/2022
Permit issued — General Construction
B00704478-I1-GC
05/12/2022
Filed — Alteration
Facade and roof restoration as indicated on drawings.
B00704478-P1
04/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/06/2022
Violation issued (ECB, open)
Construction
04/06/2022
Violation issued (ECB, closed)
Construction
04/06/2022
Violation issued (ECB, closed)
Construction
04/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAbove & Beyond P & H08/04/2023
DOB NOWPlumbingSigned-offAbove & Beyond P & H08/03/2022
DOB NOWPlumbingSigned-offAbove & Beyond P & H06/09/2022
DOB NOWGeneral ConstructionSigned-offRain Guard Construction05/17/2022
DOB NOWMechanical SystemsSigned-offErnest Kuriqi03/11/2022
DOB NOWSupported ScaffoldPermit IssuedReliable Enterprises02/22/2022
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises02/17/2022
DOB NOWStructuralSigned-offErnest Kuriqi02/09/2022
DOB NOWPlumbingSigned-offEagle 1 Mechanical02/07/2022
BISBLISSUEDAbove & Beyond P & H06/20/2019
BISOTISSUEDGuaranteed Home Improveme08/15/2018
BISPLISSUEDAbove & Beyond P & H08/15/2018
BISBLISSUEDGeorge Bassolino07/16/2002
BISOTISSUEDNativo General Contracting04/02/2001
BISPLISSUEDMainland Plumbing & Heating01/17/2001
BISOTISSUEDNativo General Contracting01/02/2001
BISOTISSUEDNativo General Contracting12/27/2000
BISFBISSUEDGeorge Bassolino08/07/2000
BISOTISSUEDNativo General Contracting07/21/2000
2 projects · most recent 02/19/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/19/2023Signed-offAbove & Beyond P & HGas
07/31/2022Signed-offAbove & Beyond P & HWater/Sanitary
5 projects · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026Permit IssuedA & S ElectricGeneral Wiring
09/19/2025Permit IssuedCaputek Electrical Services—
02/22/2022CompleteStanco System Electrical ContGeneral Wiring
02/18/2022Permit IssuedRichard Neu—
10/07/2019Permit IssuedTuxedo Electrical Contracting—
2 projects · most recent 06/27/2022
Sidewalk Shed Scaffold
FiledStatusContractorScope
06/27/2022Permit IssuedReliable EnterprisesSidewalk Shed
02/21/2022Permit IssuedReliable EnterprisesScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
02/21/2023Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
08/25/2022Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
08/22/2022Structural Steel - WeldingMichael Marchesespecial
08/22/2022Structural Stability – Alterations of existing buildingsMichael Marchesespecial
08/22/2022MasonryMichael Marchesespecial
08/22/2022Concrete - Cast-In-PlaceMichael Marchesespecial
08/22/2022Structural Steel - High Strength BoltingMichael Marchesespecial
08/22/2022Mechanical SystemsMichael Marchesespecial
08/22/2022Structural Steel - DetailsMichael Marchesespecial
08/22/2022Sprayed fire-resistant materialsMichael Marchesespecial
08/22/2022FinalMichael Marcheseprogress
08/22/2022Energy Code Compliance InspectionsMichael Marcheseprogress
08/22/2022Fire-Resistance Rated ConstructionMichael Marcheseprogress
08/22/2022HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
08/22/2022Interior lighting powerMichael Marcheseenergy_progress
08/22/2022Shutoff dampersMichael Marcheseenergy_progress
08/22/2022HVAC-R and service water heating system controlsMichael Marcheseenergy_progress
08/22/2022Electrical motors and elevatorsMichael Marcheseenergy_progress
08/22/2022Exterior lighting powerMichael Marcheseenergy_progress
08/22/2022Post-installed AnchorsMichael Marchesespecial
08/22/2022Fire-Resistant Penetrations and JointsMichael Marchesespecial
08/22/2022Lighting controlsMichael Marcheseenergy_progress
08/22/2022Maintenance informationMichael Marcheseenergy_progress
08/18/2022HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
08/18/2022HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
Latest 25 of 63.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Holy Angels Catholic AcademyEducationSub-basement, Floors 1–3, Roof
Project B00704478 Alteration · LOC Issued · 03/30/2022
Project B00584296 Alteration · LOC Issued · 09/22/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/01/2026B00584296-I1Request digital key ↗
09/01/2026B00584296-S1Request digital key ↗
09/01/2026B00584296-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
08/13/2018340618754Open ↗
08/13/2018340618754Open ↗
08/13/2018340618754Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/13/2018340618754Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature37
09/16/2026B00584296-S1Open ↗
09/16/2026B00584296-S1Open ↗
09/16/2026B00584296-S1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/16/2026B00584296-S1Open ↗
09/01/2026B00584296-P2Open ↗
09/01/2026B00781894-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
09/01/2026B00584296-P1Open ↗
Showing 3 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/13/2018340618754Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/13/2018340618754Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/13/2018340618754Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/24/2019340618754Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
08/13/2018340618754Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/13/2018340618754Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
08/30/2026B00704478-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00750225-I1Open ↗
08/29/2026B00750225-P1Open ↗
08/13/2026B00781894-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/13/2018340618754Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/13/2018340618754Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/24/2019340618754Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/13/2018340618754Open ↗
▸BISNYCECC ANALYSIS1
08/13/2018340618754Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/24/2019340618754Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/13/2018340618754Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
09/01/2026B00584296-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP Variance (V5) letter3
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
08/30/2026B00704478-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/24/2019340618754Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/24/2019340618754Open ↗
08/13/2018340618754Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
09/24/2019340618754Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/13/2018340618754Open ↗