← Back
BuildNYC
Five to six families
337 EAST 18TH STREET
MANHATTAN · Gramercy · BIN 1020482
💬 Discuss this project
1910Year Built
4Stories
C2Building Class
R7BZoning
3,666 sfGross Floor Area
5Units
Rent Stabilized0 Active Violations
Five to six families · Owner of record: 337 E 18 LLC · 1,840 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing work, basement to 3rd floor5p · 1 filing · 14 docs
Floor 3Plumbing work, basement to 3rd floor20p · 2 filings · 20 docs
Floor 2Plumbing work, basement to 3rd floor26p · 2 filings · 20 docs
Floor 1Plumbing work, basement to 3rd floor15p · 1 filing · 14 docs
CellarPlumbing work, basement to 3rd floor18p · 2 filings · 20 docs
BasementPlumbing work, basement to 3rd floor3p · 1 filing · 14 docs
Sub-BasementPlumbing work, basement to 3rd floor21p · 2 filings · 20 docs
Site & exteriorTemporary Construction Fence9p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
337 E 18 ST2110/07/2026
Elite Contracting & Design407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/11/2025$3.9M—— → —$1,073/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Edifice Drafting and Services410/06/2026
Levin Engineering302/17/2026
Bangash Associates107/21/2024
Ashraf107/17/2024
New Age104/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yona Love Consulting Services1103/21/2026
Kma Designs203/21/2026
Sheikh Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Method General ContractorGeneral Contractor607/08/2026
J & G Construction ServicesScaffold603/21/2026
M&N Construction ServicesGeneral Contractor404/09/2026
Method General ContractorScaffold204/09/2026
Sideris Plumbing & HeatingPlumbing107/08/2026
Elite Contracting & DesGeneral Contractor107/08/2026
M&N Construction ServicesScaffold104/09/2026
P.H. WorksPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
City-Wide Testing416610/06/2026
Bangash Associates8488107/21/2024
Building Lifecycle
All (103)Filed (10)Permit Issued (16)Signed Off (8)Violation (5)Inspection (4)Objection (30)Special Inspection (30)
10/20/2026
Signed off — Alteration
Installation of new heating and cooling equipment
M01312640-S1
10/08/2026
Signed off — Alteration
ALTERATION 2 TO COMBINE TWO UNITS ON THE 3RD FLOOR AS PER TPPN 3-97. ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01298287-I1
10/08/2026
Special inspection requirement — Final
ELIAS RASABI
10/07/2026
Signed off — Alteration
Alteration Type 2 to combine two units on the 2nd floor as per TPPN 3/97 and renovate the apartments on the basement and 1st floor . All work as per plan. No change in use, egress, oroccupancy.
M01298299-I1
10/07/2026
Signed off — Alteration
Installation of new heating and cooling equipment
M01312640-I1
10/06/2026
Filed — Alteration
ALTERATION 2 TO COMBINE TWO UNITS ON THE 3RD FLOOR AS PER TPPN 3-97. ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01298287-P1
10/06/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
10/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
10/06/2026
Special inspection requirement — Final
10/06/2026
Special inspection requirement — Metering
ELIAS RASABI
10/06/2026
Special inspection requirement — Fenestration air leakage
ELIAS RASABI
10/06/2026
Special inspection requirement — Lighting controls
ELIAS RASABI
10/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ELIAS RASABI
10/06/2026
Special inspection requirement — Fenestration areas
ELIAS RASABI
10/06/2026
Special inspection requirement — Maintenance information
ELIAS RASABI
10/06/2026
Special inspection requirement — Interior lighting power
ELIAS RASABI
10/06/2026
Special inspection requirement — Lighting in dwelling units
ELIAS RASABI
10/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
09/03/2026
Signed off — Alteration
Temporary Construction Fence
M01314928-I1
05/06/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/02/2026
Permit issued — General Construction
M01298299-I1-GC
03/02/2026
Permit issued — General Construction
M01298287-I1-GC
03/02/2026
Permit issued — Construction Fence
M01314928-I1-FN
03/02/2026
Permit issued — Mechanical Systems
M01312640-S1-MS
02/17/2026
Filed — Alteration
Installation of new heating and cooling equipment
M01312640-P1
02/10/2026
Permit issued — Mechanical Systems
M01312640-S1-MS
02/05/2026
Permit issued — Plumbing
M01312640-I1-PL
01/12/2026
Permit issued — General Construction
M01298287-I1-GC
01/12/2026
Permit issued — Construction Fence
M01314928-I1-FN
01/12/2026
Permit issued — General Construction
M01298299-I1-GC
12/24/2025
Permit issued — General Construction
M01298299-I1-GC
12/23/2025
Permit issued — Construction Fence
M01314928-I1-FN
12/23/2025
Permit issued — General Construction
M01298287-I1-GC
12/09/2025
Filed — Alteration
Installation of new heating and cooling equipment
M01312640-S1
12/08/2025
Special inspection requirement — Mechanical Systems
ELIAS RASABI
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
12/08/2025
Special inspection requirement — Maintenance information
ELIAS RASABI
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
12/08/2025
Special inspection requirement — Shutoff dampers
ELIAS RASABI
12/08/2025
Special inspection requirement — Final
ELIAS RASABI
12/02/2025
Filed — Alteration
Installation of new heating and cooling equipment
M01312640-I1
12/02/2025
Objection resolved — Addressed
11/24/2025
Objection raised — Other
11/17/2025
Violation issued (HPD, closed)
I
11/10/2025
Filed — Alteration
Temporary Construction Fence
M01314928-I1
11/07/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
11/06/2025
Objection raised — Mechanical
11/06/2025
Objection resolved — Addressed
11/06/2025
Objection resolved — Addressed
11/06/2025
Objection resolved — Addressed
11/06/2025
Objection resolved — Addressed
11/06/2025
Special inspection requirement — Metering
ELIAS RASABI
11/05/2025
Objection resolved — Addressed
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMethod General Contractor03/02/2026
DOB NOWGeneral ConstructionSigned-offMethod General Contractor03/02/2026
DOB NOWConstruction FenceSigned-offMethod General Contractor03/02/2026
DOB NOWMechanical SystemsSigned-offMethod General Contractor03/02/2026
DOB NOWMechanical SystemsPermit IssuedMethod General Contractor02/10/2026
DOB NOWPlumbingSigned-offP.H. Works02/05/2026
DOB NOWGeneral ConstructionSigned-offMethod General Contractor01/12/2026
DOB NOWConstruction FenceSigned-offMethod General Contractor01/12/2026
DOB NOWGeneral ConstructionSigned-offMethod General Contractor01/12/2026
DOB NOWGeneral ConstructionSigned-offM&N Construction Services12/24/2025
DOB NOWConstruction FenceSigned-offM&N Construction Services12/23/2025
DOB NOWGeneral ConstructionSigned-offM&N Construction Services12/23/2025
DOB NOWGeneral ConstructionSigned-offElite Contracting & Des07/30/2024
DOB NOWSidewalk ShedSigned-offJ & G Construction Services07/18/2024
DOB NOWSidewalk ShedSigned-offJ & G Construction Services07/18/2024
DOB NOWPlumbingSigned-offSideris Plumbing & Heating04/20/2022
1 project · most recent 02/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/17/2026Signed-offMethod General ContractorHeating and Air Conditioning Systems
Heat / Cool
Daikin Daikin RXTA36AAVJU 40,000 BTU · Vrf Outdoor ×2
Daikin RXTA60AAVJU 60,000 BTU · Vrf Outdoor ×1
1 project · most recent 02/17/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/17/2026Signed-offP.H. WorksGas, Storm, Water/Sanitary
2 projects · most recent 06/24/2026
General Wiring
FiledStatusContractorScope
06/24/2026Permit IssuedMethod ElectricGeneral Wiring
07/19/2024CompleteRichard Neu—
1 project · most recent 11/10/2025
Fence
FiledStatusContractorScope
11/10/2025Signed-offMethod General ContractorFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/06/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
10/08/2026FinalELIAS RASABIprogress
10/06/2026Energy Code Compliance InspectionsELIAS RASABIprogress
10/06/2026Fire-Resistance Rated ConstructionELIAS RASABIprogress
10/06/2026Final—progress
10/06/2026MeteringELIAS RASABIenergy_progress
10/06/2026Fenestration air leakageELIAS RASABIenergy_progress
10/06/2026Lighting controlsELIAS RASABIenergy_progress
10/06/2026Fenestration and door U-factor and product ratingsELIAS RASABIenergy_progress
10/06/2026Fenestration areasELIAS RASABIenergy_progress
10/06/2026Maintenance informationELIAS RASABIenergy_progress
10/06/2026Interior lighting powerELIAS RASABIenergy_progress
10/06/2026Lighting in dwelling unitsELIAS RASABIenergy_progress
10/06/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
12/08/2025Mechanical SystemsELIAS RASABIspecial
12/08/2025HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
12/08/2025Maintenance informationELIAS RASABIenergy_progress
12/08/2025HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
12/08/2025HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
12/08/2025Shutoff dampersELIAS RASABIenergy_progress
12/08/2025FinalELIAS RASABIprogress
11/06/2025MeteringELIAS RASABIenergy_progress
11/05/2025Maintenance informationELIAS RASABIenergy_progress
11/05/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
11/05/2025Energy Code Compliance InspectionsELIAS RASABIprogress
11/05/2025Fire-Resistance Rated ConstructionELIAS RASABIprogress
Latest 25 of 49.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/02/2026M00713492-I1Request digital key ↗
08/26/2026M01081783-I1Request digital key ↗
08/26/2026M01083252-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature14
10/15/2026M01298287-I1Open ↗
10/08/2026M01298287-P1Open ↗
10/08/2026M01298287-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
10/08/2026M01298287-P1Open ↗
09/02/2026M00713492-I1Open ↗
08/26/2026M01081783-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/08/2026M01298287-P1Open ↗
09/23/2026M01312640-S1Open ↗
09/02/2026M01298299-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
10/08/2026M01298287-P1Open ↗
09/02/2026M00713492-I1Open ↗
08/21/2026M01298287-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00713492-I1Open ↗