338 EAST 117 STREET
MANHATTAN · East Harlem (North) · BIN 1803087
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R7BZoning
0 sfGross Floor Area
0Units
0 Open Violations
Zoned commercial or Manhattan residential · Owner of record: LAS RAICES HOUSING DEVELOPMENT FUND COMP ANY, INC. · 2,523 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction93p · 2 filings · 20 docs
Floor 5Under Construction78p · 2 filings · 20 docs
Floor 4Under Construction80p · 2 filings · 20 docs
Floor 3Under Construction74p · 2 filings · 20 docs
Floor 2Under Construction82p · 2 filings · 20 docs
Floor 1Under Construction152p · 2 filings · 20 docs
Site & exteriorUnder Construction64p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COSAN CONSTRUCTION604/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC706/03/2026
GF55 ARCHITECTS LLP303/04/2026
AMM ENGINEERING PC111/24/2025
ASHRAF CORP209/30/2025
PAUL PERDEK, PROF. ENG. PLLC408/28/2025
PILLORI ASSOCIATES306/23/2025
DE NARDIS ENGINEERING, LLC407/29/2024
HANSEN ENGINEERING, PC107/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PRECISION 3SIXTY NYC, INC3003/21/2026
JM ZONING, LLC.103/21/2026
A1 EXPEDITING SERVICE803/21/2026
EUROCELT EXPEDITING, INC403/21/2026
LETTIRE CONSTRUCTION103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LETTIRE CONSTRUCTION CORPGeneral Contractor1307/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor407/08/2026
COSAN CONSTRUCTION CORPGeneral Contractor304/09/2026
DEMAR PLUMBING CORPFire Protection207/08/2026
DEMAR PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.2541606/03/2026
Building Lifecycle
All (152)Filed (25)Permit Issued (22)Signed Off (1)Violation (6)Inspection (10)Objection (58)Special Inspection (30)
07/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
07/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/03/2026
Filed — New Building
Installation of sprinkler system and related piping in conjunction with NB,
M00719204-A3
05/08/2026
Special inspection requirement — Lighting controls
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Final
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Metering
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Interior lighting power
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Electrical motors and elevators
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Exterior lighting power
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Ventilation and air distribution system
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Shutoff dampers
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
05/08/2026
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
05/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/01/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
05/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2026
Special inspection requirement — Air barrier - visual inspection
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Insulation placement and R values
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Lowest Floor Elevation
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Fenestration areas
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Protection of exposed foundation insulation
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MAURICIO ANDRADE
03/25/2026
Special inspection requirement — Vestibules
MAURICIO ANDRADE
03/24/2026
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
03/23/2026
Permit issued — Protection and Mechanical Methods
M01173703-S1-PMM
03/19/2026
Permit issued — Sidewalk Shed
M01173703-I1-SH
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/06/2026
Objection raised — Other
03/06/2026
Objection raised — Fire_Protection
03/04/2026
Filed — New Building
Installation of sprinkler system and related piping in conjunction with NB,
M00719204-A2
02/20/2026
Objection raised — Admin
02/13/2026
Filed — New Building
Installation of sprinkler system and related piping in conjunction with NB,
M00719204-P9
01/27/2026
Filed — New Building
Installation of sprinkler system and related piping in conjunction with NB,
M00719204-P7
01/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/22/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/17/2025
Violation issued (ECB, closed)
Construction
12/17/2025
Violation issued (ECB, closed)
Site Safety
12/17/2025
Violation issued (ECB, closed)
Unknown
12/16/2025
Violation issued (ECB, closed)
Construction
11/25/2025
Permit issued — Suspended Scaffold
M01322127-I1-SC
11/24/2025
Filed — Alteration
M01322127-I1
10/23/2025
Permit issued — General Construction
M00719204-I1-GC
10/16/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M01184283-P1
09/18/2025
Permit issued — Construction Fence
M01076172-I1-FN
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP03/23/2026
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP03/19/2026
DOB NOWSuspended ScaffoldPermit IssuedCOSAN CONSTRUCTION11/25/2025
DOB NOWGeneral ConstructionPermit IssuedLETTIRE CONSTRUCTION CORP10/23/2025
DOB NOWConstruction FenceSigned-offLETTIRE CONSTRUCTION CORP09/18/2025
DOB NOWPlumbingPermit IssuedDEMAR PLUMBING CORP09/11/2025
DOB NOWSprinklersSigned-offDEMAR PLUMBING CORP09/11/2025
DOB NOWStructuralSigned-offLETTIRE CONSTRUCTION CORP08/25/2025
DOB NOWMechanical SystemsSigned-offLETTIRE CONSTRUCTION CORP08/20/2025
DOB NOWConstruction FenceSigned-offLETTIRE CONSTRUCTION CORP07/21/2025
DOB NOWSupported ScaffoldSigned-offCOSAN CONSTRUCTION06/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP03/20/2025
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP03/20/2025
DOB NOWGeneral ConstructionPermit IssuedLETTIRE CONSTRUCTION CORP11/12/2024
DOB NOWSupport of ExcavationSigned-offLETTIRE CONSTRUCTION CORP08/30/2024
DOB NOWStructuralSigned-offLETTIRE CONSTRUCTION CORP08/29/2024
DOB NOWFoundationSigned-offLETTIRE CONSTRUCTION CORP08/29/2024
DOB NOWMechanical SystemsSigned-offLETTIRE CONSTRUCTION CORP08/26/2024
DOB NOWGeneral ConstructionPermit IssuedLETTIRE CONSTRUCTION CORP08/26/2024
DOB NOWSprinklersSigned-offDEMAR PLUMBING CORP08/22/2024
DOB NOWPlumbingPermit IssuedDEMAR PLUMBING CORP08/22/2024
DOB NOWConstruction FenceSigned-offLETTIRE CONSTRUCTION CORP07/26/2024
1 project · most recent 06/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2026Permit IssuedLETTIRE CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUY-A24NHA7 24,000 BTU · Split System ×2
PUZ-HA24NHA1 24,000 BTU · Split System ×2
Islandaire EZ07A2GN1S14AL 7,200 BTU · Ptac ×2
1 project · most recent 06/03/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/03/2026Permit IssuedDEMAR PLUMBING CORPStorm, Water/Sanitary
4 projects · most recent 08/26/2026
General Wiring
FiledStatusContractorScope
08/26/2026CompleteXTREME ELECTRIC INCGeneral Wiring
02/11/2026Permit IssuedTUXEDO ELEC'L CONTR'G INC—
03/21/2025CompleteANTHONY G FERRY INC—
08/08/2024CompleteXTREME ELECTRIC INC1 meters, 1 new_meters
1 project · most recent 06/03/2026
Steel Masonry
FiledStatusContractorScope
06/03/2026Permit IssuedLETTIRE CONSTRUCTION CORPSteel, Masonry
3 projects · most recent 09/30/2025
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
09/30/2025Signed-offCOSAN CONSTRUCTION CORPScaffold
08/28/2025Signed-offROCKLEDGE SCAFFOLD CORPSidewalk Shed
07/09/2024Signed-offLETTIRE CONSTRUCTION CORPFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/07/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/01/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/28/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
05/08/2026Interior lighting powerMAURICIO ANDRADEenergy_progress
05/08/2026MeteringMAURICIO ANDRADEenergy_progress
05/08/2026Maintenance informationMAURICIO ANDRADEenergy_progress
05/08/2026Electrical motors and elevatorsMAURICIO ANDRADEenergy_progress
05/08/2026Shutoff dampersMAURICIO ANDRADEenergy_progress
05/08/2026HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
05/08/2026Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
05/08/2026FinalMAURICIO ANDRADEprogress
05/08/2026Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
05/08/2026Mechanical SystemsMAURICIO ANDRADEspecial
05/08/2026Heating SystemsMAURICIO ANDRADEspecial
05/08/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/08/2026Ventilation and air distribution systemMAURICIO ANDRADEenergy_progress
05/08/2026HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
05/08/2026Exterior lighting powerMAURICIO ANDRADEenergy_progress
05/08/2026Lighting controlsMAURICIO ANDRADEenergy_progress
05/08/2026HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
03/25/2026Air barrier - visual inspectionMAURICIO ANDRADEenergy_progress
03/25/2026Protection of exposed foundation insulationMAURICIO ANDRADEenergy_progress
03/25/2026Fenestration and door U-factor and product ratingsMAURICIO ANDRADEenergy_progress
03/25/2026Fenestration areasMAURICIO ANDRADEenergy_progress
03/25/2026VestibulesMAURICIO ANDRADEenergy_progress
03/25/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
03/25/2026Wall Panels, Curtain Walls, and VeneersMAURICIO ANDRADEspecial
03/25/2026Lowest Floor ElevationMAURICIO ANDRADEprogress
Latest 25 of 91.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/26/2026M01076172-I1Request digital key ↗
08/21/2026M01173703-P2Request digital key ↗
08/21/2026M01173703-P1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
05/17/2024141025744Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/17/2024141025744Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026M00719204-I1Open ↗
08/13/2026M00719204-A2Open ↗
08/13/2026M00719204-P5Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/26/2026M01076172-I1Open ↗
08/21/2026M01173703-P1Open ↗
08/21/2026M01173703-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026M00719204-A3Open ↗
09/02/2026M00719204-P5Open ↗
09/01/2026M00719204-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/27/2026M00719204-A3Open ↗
09/27/2026M00719204-A3Open ↗
09/27/2026M00719204-A3Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/17/2024141025744Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/17/2024141025744Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026M00719204-I1Open ↗
08/13/2026M00719204-P5Open ↗
08/13/2026M00719204-A2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/18/2026M00719204-A2Open ↗
08/15/2026M00719204-P5Open ↗
08/15/2026M00719204-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/17/2024141025744Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00719204-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/15/2026M00719204-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026M00719204-S5Open ↗
08/13/2026M00719204-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00719204-S5Open ↗
▸Approvals, Objections & Sign-offs43
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter25
08/21/2026M01184283-P1Open ↗
08/21/2026M01184283-I1Open ↗
08/21/2026M01184283-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)17
08/18/2026M00719204-A3Open ↗
08/13/2026M00719204-P5Open ↗
08/13/2026M00719204-A2Open ↗
Showing 3 of 17 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
05/17/2024141025744Open ↗
▸Filing & Intake Forms4
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M01173703-P2Open ↗
08/16/2026M01173703-P1Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/17/2024141025744Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/17/2024141025744Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification3
08/18/2026M00719204-A2Open ↗
08/15/2026M00719204-P5Open ↗
08/15/2026M00719204-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026M00719204-A2Open ↗
08/13/2026M00719204-I1Open ↗
08/13/2026M00719204-P5Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026M00719204-I1Open ↗
08/13/2026M00719204-A2Open ↗
08/13/2026M00719204-P5Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00719204-S7Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/15/2026M00719204-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01322127-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01322127-I1Open ↗