← Back
Elevator apt, fireproof without stores
338 EAST 15 STREET
MANHATTAN · Gramercy · BIN 1020409
💬 Discuss this project
1910Year Built
7Stories
D3Building Class
R8AZoning
24,472 sfGross Floor Area
39Units
Rent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: 15TH ASSOCIATES LLC · 4,337 sf lot · 5.64 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 4 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
15TH ASSOCIATES4703/22/2026
TRIERA CONTRACTING INC1303/22/2026
FAMOUS RESTORATION INC703/22/2026
15 ASSOCIATES LLC603/22/2026
15TH ASSOCA. L.L.C.103/22/2026
BSW CONSTRUCTION203/22/2026
HKS CONSTRUCTION203/21/2026
TWIN PARK EQUITIES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LU ENGINEERING SERVICE PC103/01/2023
GREEN DESIGN210/01/2020
ADITI SARKAR, ARCHITECT, PLLC101/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
H Z BUILDING NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIERA CONTRACTING INCGeneral Contractor1203/21/2026
FAMOUS RESTORATION INCGeneral Contractor403/21/2026
KWONG MING ELECTRIC INCElectrical303/22/2026
WING TAI CONSTRUCTION INCGeneral Contractor303/21/2026
AI FANG WUElectrical203/21/2026
TORRES IVANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LU ENGINEERING SERVICE PC6575103/01/2023
Building Lifecycle
All (98)Filed (4)Permit Issued (7)Signed Off (3)Facade (FISP) (18)Violation (60)Inspection (5)Special Inspection (1)
01/30/2024
Cycle 9 facade report submitted
01/29/2024
Cycle 9 facade report signed — SAFE
01/16/2024
Cycle 9 facade inspection completed
07/10/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00291491-I1
05/23/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND FLOOR(APT#2A). REPAIRING PARTITIONS, CEILING AND FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00830592-I1
05/22/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/13/2023
Permit issued — General Construction
M00830592-I1-GC
03/01/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND FLOOR(APT#2A). REPAIRING PARTITIONS, CEILING AND FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00830592-I1
02/16/2023
Special inspection requirement — Tenant Protection Plan Compliance
DONGSHENG LU
02/13/2023
Cycle 8 facade report signed — SAFE
02/07/2023
Violation issued (HPD, closed)
C
02/07/2023
Violation issued (HPD, closed)
B
02/07/2023
Violation issued (HPD, closed)
B
02/07/2023
Violation issued (HPD, closed)
B
02/07/2023
Violation issued (HPD, closed)
B
02/07/2023
Violation issued (HPD, closed)
B
02/07/2023
Violation issued (HPD, closed)
B
02/07/2023
Violation issued (HPD, closed)
C
02/07/2023
Violation issued (HPD, closed)
B
02/07/2023
Violation issued (HPD, closed)
B
02/02/2023
Cycle 8 facade inspection completed
12/09/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/30/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/23/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/26/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/06/2022
Permit issued — Sidewalk Shed
M00406610-I1-SH
12/25/2021
Violation issued (HPD, closed)
B
12/25/2021
Violation issued (HPD, closed)
A
10/05/2021
Permit issued — Sidewalk Shed
M00406610-I1-SH
06/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/02/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY (60'-78') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00406744-I1
01/14/2021
Violation issued (HPD, closed)
A
10/05/2020
Permit issued — Sidewalk Shed
M00406610-I1-SH
10/02/2020
Permit issued — Supported Scaffold
M00406744-I1-SF
10/01/2020
Filed — Alteration
INSTALLATION OF TEMPORARY (60'-78') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
M00406744-I1
10/01/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
M00406610-I1
08/03/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/2020
Cycle 8 facade report submitted
07/15/2020
Cycle 8 facade report signed — UNSAFE
07/08/2020
Cycle 8 facade inspection completed
04/10/2020
Permit issued — Sidewalk Shed
M00291491-I1-SH
01/07/2020
Permit issued — Sidewalk Shed
M00291491-I1-SH
01/06/2020
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00291491-I1
01/06/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/27/2018
Violation issued (ECB, closed)
Local Law
12/26/2017
Violation issued (ECB, closed)
Elevators
10/18/2017
Violation issued (HPD, closed)
C
02/23/2017
Violation issued (ECB, closed)
Construction
02/10/2017
Cycle 8 facade report submitted
01/10/2017
Violation issued (ECB, closed)
Construction
01/04/2017
Violation issued (ECB, closed)
Local Law
06/29/2015
Cycle 8 facade report submitted
06/29/2015
Cycle 8 facade report signed — UNSAFE
06/29/2015
Cycle 7 facade report submitted
06/29/2015
Cycle 7 facade report signed — UNSAFE
06/29/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/29/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/18/2015
Cycle 8 facade inspection completed
06/18/2015
Cycle 7 facade inspection completed
02/20/2015
Violation issued (ECB, closed)
Local Law
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWING TAI CONSTRUCTION INC03/13/2023
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC10/06/2022
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC10/05/2021
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC10/05/2020
DOB NOWSupported ScaffoldSigned-offTRIERA CONTRACTING INC10/02/2020
DOB NOWSidewalk ShedSigned-offSE ENERGY04/10/2020
DOB NOWSidewalk ShedSigned-offSE ENERGY01/07/2020
BISOTISSUEDFAMOUS RESTORATION INC04/05/2022
BISOTISSUEDFAMOUS RESTORATION INC04/16/2021
BISOTISSUEDFAMOUS RESTORATION INC02/16/2021
BISOTISSUEDFAMOUS RESTORATION INC08/26/2020
BISOTISSUEDHUA TAI CONSTRUCTION INC04/03/2018
BISOTISSUEDHUA TAI CONSTRUCTION INC03/26/2018
BISOTISSUEDHUA TAI CONSTRUCTION INC02/22/2017
BISOTISSUEDFAMOUS RESTORATION INC08/26/2015
BISOTISSUEDYAN TAI CONSTRUCTION INC07/14/2015
BISEQISSUEDHKS CONSTRUCTION CORP07/07/2015
BISOTISSUEDYAN TAI CONSTRUCTION INC06/16/2015
BISOTISSUEDYAN TAI CONSTRUCTION INC07/03/2013
BISOTISSUEDYAN TAI CONSTRUCTION INC06/21/2013
BISEQISSUEDMETRO CONTRACTING NY, INC.06/18/2009
BISEQISSUEDMETRO CONTRACTING NY, INC.04/01/2009
BISOTISSUEDHOY TAI CONSTRUCTION INC02/06/2009
BISOTISSUEDHOY TAI CONSTRUCTION INC01/19/2007
BISOTISSUEDHOY TAI CONSTRUCTION INC09/01/2006
3 projects · most recent 10/08/2025
FiledStatusContractorScope
10/08/2025CompleteKWONG MING ELECTRIC INC39 meters, 1 new_meters
03/16/2020Permit IssuedGREEN POWER ELECTRIC CORP—
01/13/2020Permit IssuedWCK ELECTRIC CORP.—
1 project · most recent 10/01/2020
Sidewalk Shed
FiledStatusContractorScope
10/01/2020Permit IssuedTRIERA CONTRACTING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/26/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/16/2023Tenant Protection Plan ComplianceDONGSHENG LUspecial
▾Documents — 141 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00291491-I1Request digital key ↗
09/04/2026M00406610-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00406744-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/31/2026M00830592-I1Request digital key ↗
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION12
08/26/2020140930688Open ↗
03/27/2018123424133Open ↗
03/01/2017123017751Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
08/03/2020140930688Open ↗
03/27/2018123424133Open ↗
02/10/2017123017751Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications39
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
05/14/2018123424133Open ↗
03/27/2018123424133Open ↗
07/19/2017123017751Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
08/03/2020140930688Open ↗
03/27/2018123424133Open ↗
02/10/2017123017751Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
08/03/2020140930688Open ↗
08/26/2015140393884Open ↗
07/06/2015140370989Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/27/2018123424133Open ↗
02/10/2017123017751Open ↗
03/30/2009120078593Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/26/2015140393884Open ↗
07/06/2015140370989Open ↗
06/12/2015140360927Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/05/2026M00291491-I1Open ↗
08/13/2026M00830592-I1Open ↗
08/13/2026M00406610-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/30/2009120078593Open ↗
02/03/2009110446937Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026M00830592-I1Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
03/27/2018123424133Open ↗
02/10/2017123017751Open ↗
08/03/2020140930688Open ↗
▸DOB NOWTenant Protection Plan3
09/05/2026M00291491-I1Open ↗
08/13/2026M00406610-I1Open ↗
08/13/2026M00406744-I1Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
08/03/2020140930688Open ↗
03/27/2018123424133Open ↗
02/10/2017123017751Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/03/2009110446937Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/30/2009120078593Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00830592-I1Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/14/2018123424133Open ↗
03/27/2018123424133Open ↗
07/19/2017123017751Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
08/26/2015140393884Open ↗
06/12/2015140360927Open ↗
06/21/2013140090559Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/03/2020140930688Open ↗
08/26/2015140393884Open ↗
06/12/2015140360927Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
05/14/2018123424133Open ↗
07/19/2017123017751Open ↗
08/16/2013140090559Open ↗
▸BISNYCECC ANALYSIS2
06/12/2015140360927Open ↗
06/21/2013140090559Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/16/2013140090559Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/08/2022140930688Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY8
06/09/2022140930688Open ↗
06/08/2022140930688Open ↗
08/03/2020140930688Open ↗
Showing 3 of 8 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/26/2020140930688Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/14/2018123424133Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/13/2022140930688Open ↗
05/14/2018123424133Open ↗
07/19/2017123017751Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/30/2009120078593Open ↗
02/03/2009110446937Open ↗
▸BISFINAL1
06/08/2022140930688Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
08/03/2020140930688Open ↗
05/14/2018123424133Open ↗
03/27/2018123424133Open ↗
Showing 3 of 11 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/21/2013140090559Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/08/2022140930688Open ↗
▸Filing & Intake Forms11
▸BISEFILING JOB APPLICATION COVER SHEET5
08/03/2020140930688Open ↗
08/26/2015140393884Open ↗
07/06/2015140370989Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
03/27/2018123424133Open ↗
02/10/2017123017751Open ↗
03/30/2009120078593Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
05/14/2018123424133Open ↗
▸BISADDITIONAL INFORMATION1
07/13/2015140360927Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/23/2009110446937Open ↗
02/04/2009110446937Open ↗