← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
338 EAST 8 STREET
MANHATTAN · East Village · BIN 1088352
💬 Discuss this project
2001Year Built
7Stories
RMBuilding Class
R7AZoning
73,359 sfGross Floor Area
72Units
LL97 CoveredRent Stabilized
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: GETHSEMANE GARDEN · 17,843 sf lot · 4.11 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 2 docs
Floor 1Under Construction5p · 1 filing · 2 docs
Site & exteriorUnder Construction9p · 2 filings · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB107/20/2026
SOCOTEC, INC.105/08/2026
GREEN DESIGN112/21/2017
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC, INC.301105/08/2026
Building Lifecycle
All (5)Filed (5)
07/20/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01433258-I1
07/08/2026
Filed — Alteration
INSTALLATION OF OUTREIGGER FOR FACADE REPAIR.
M01428052-I1
05/08/2026
Filed — Alteration
facade repairs as per drawings . there is no change to use, egress, or occupancy
M01395844-I1
11/03/2025
Filed — Alteration
Installation of IRA for facade inspection.
M01312773-I1
12/21/2017
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014CODE
M00006908-I1
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.