2 Open Violations 0 unresolved · 2 paperwork only▸
ECB06/02/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT NY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECIEVED A RETAINING WALL CONDITION ASSESSNothing owed — awaiting certificate of correction
ECB06/21/2006WORK W/O A PERMIT. WORK NOTED: ALTERED CONCRETE SIDEWALK,LOWERED IT CREATING A DRIVEWAY APPROX. 10'WIDE @ FRONT SIDE OF DWELLING. REMOVED WALL COVERING EXPOSING WOOD SHEETING @ 2ND FLR THRU-OUT.Nothing owed — awaiting certificate of correction
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.