← Back
Single or multiple dwelling with stores or offices
339 MACON STREET
BROOKLYN · BIN 3053176
💬 Discuss this project
1921Year Built
2Stories
S9Building Class
R6BZoning
4,200 sfGross Floor Area
5Units
53 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: SELF-HELP VENTURES FUND · 2,100 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction34p · 2 filings · 20 docs
Floor 1Under Construction38p · 3 filings · 20 docs
CellarUnder Construction46p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLASSIC CONSULTING GROUP404/09/2026
WILL DUBOSE DESIGN503/22/2026
DESIGN LLC WILL DUBOSE203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/27/2024$2.6M—— → —$619/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING P.C.407/01/2026
INGA CONSULTING ENGINEERS1604/23/2026
ALSIEUX ARCHITECTURE, LLC.109/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT1403/21/2026
ADAM MAISER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WILL DUBOSE DESIGN LLCGeneral Contractor1908/18/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
L S SIGNScaffold209/10/2026
WCK ELECTRIC CORP.Electrical103/22/2026
LYNN AND SONS NY CONSULTGeneral Contractor107/02/2026
ALL PRO PLBG & HTG INCFire Protection108/20/2026
CLASSIC CONSULTING GROUPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREAT WALL CONSULTANT P.E56331004/23/2026
IP CONCRETE TESTING AND I6252506/17/2025
Building Lifecycle
All (167)Filed (21)Permit Issued (20)Signed Off (2)Violation (60)Inspection (5)Objection (29)Special Inspection (30)
09/09/2026
Permit issued — Sign
B01445382-I1-SG
09/09/2026
Permit issued — Sign
B01445383-I1-SG
08/19/2026
Permit issued — Sprinklers
B01147241-S2-EW-SP
08/17/2026
Permit issued — Mechanical Systems
B01147241-S1-MS
08/17/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/05/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B01284473-I1
07/23/2026
Signed off — Alteration
B01335859-I1
07/20/2026
Special inspection requirement — Final
NAVEEN KUMAR
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — Maintenance information
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — Duct leakage testing, insulation and design
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — Ventilation and air distribution system
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — Post-installed Anchors
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — Permanent certificate
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
07/20/2026
Special inspection requirement — Shutoff dampers
INDARDEO PARBHUNATH
07/02/2026
Permit issued — Earth Work
B01118283-I1-GC-CX
07/01/2026
Filed — Alteration CO
Sprinkler work filed in conjunction with the AltCO application as per plan.
B01147241-P5
07/01/2026
Objection raised — Other
06/30/2026
Permit issued — General Construction
B01118283-I1-GC-CX
06/30/2026
Permit issued — General Construction
B01026043-I1-GC
06/30/2026
Permit issued — General Construction
B01147241-I1-GC
06/02/2026
Special inspection requirement — Shutoff dampers
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/02/2026
Special inspection requirement — Mechanical Systems
06/02/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/02/2026
Special inspection requirement — Post-installed Anchors
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
06/02/2026
Special inspection requirement — Ventilation and air distribution system
06/02/2026
Special inspection requirement — Maintenance information
06/02/2026
Special inspection requirement — Permanent certificate
06/02/2026
Special inspection requirement — Final
06/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Andrew Inga
05/21/2026
Special inspection requirement — Air barrier - visual inspection
Andrew Inga
05/04/2026
Objection resolved — Addressed
05/01/2026
Objection raised — Other
04/23/2026
Filed — Alteration CO
Sprinkler work filed in conjunction with the AltCO application as per plan.
B01147241-P3
04/23/2026
Filed — Alteration CO
Sprinkler work filed in conjunction with the AltCO application as per plan.
B01147241-P2
04/22/2026
Objection raised — Electrical
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection resolved — Addressed
04/16/2026
Filed — Alteration
Proposed interior renovation of existing mixed used building with minor partitions work, floor finishes as per plan. No change in use, egress, or occupancy.
B01026043-P4
04/16/2026
Filed — Alteration
Proposed interior renovation of existing mixed used building with minor partitions work, floor finishes as per plan. No change in use, egress, or occupancy.
B01026043-P5
02/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/20/2026
Permit issued — Construction Fence
B01335859-I1-FN
12/30/2025
Filed — Alteration
B01335859-I1
11/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/06/2025
Violation issued (ECB, open)
Construction
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offL.S. SIGN CO., INC09/09/2026
DOB NOWSignSigned-offL.S. SIGN CO., INC09/09/2026
DOB NOWSprinklersPermit IssuedALL PRO PLBG & HTG INC08/19/2026
DOB NOWMechanical SystemsPermit IssuedWILL DUBOSE DESIGN LLC08/17/2026
DOB NOWEarth WorkPermit IssuedWILL DUBOSE DESIGN LLC07/02/2026
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC06/30/2026
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC06/30/2026
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC06/30/2026
DOB NOWConstruction FenceSigned-offWILL DUBOSE DESIGN LLC01/20/2026
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC09/16/2025
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP09/10/2025
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC06/04/2025
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC06/04/2025
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC06/04/2025
DOB NOWFoundationPermit IssuedWILL DUBOSE DESIGN LLC05/16/2025
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC02/27/2025
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC01/28/2025
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC09/19/2024
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC07/12/2024
DOB NOWGeneral ConstructionPermit IssuedLYNN AND SONS NY CONSULT04/16/2024
1 project · most recent 07/01/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/01/2026Permit IssuedWILL DUBOSE DESIGN LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 5MXS48TVJU 47,000 BTU · Heat Pump Outdoor ×5
RXTA48AAVJU 47,000 BTU · Vrf Outdoor ×6
5MXM48AVJU9 47,000 BTU · Vrf Outdoor ×2
RTXA48AAVJU 45,500 BTU · Vrf Outdoor ×2
Cooper & Hunter CH-HPR36M-230V0 36,000 BTU · Heat Pump Outdoor ×3
CH-HRP36M-230V0 36,000 BTU · Heat Pump Outdoor ×3
Ventilation
Energywall U-ERV-1200 1,260 CFM · Erv ×2
Blauair AV02CFH2500EA31 1,260 CFM · Erv ×1
1 project · most recent 07/01/2026
Sprinkler System
FiledStatusContractorScope
07/01/2026Permit IssuedALL PRO PLBG & HTG INCSprinkler System
1 project · most recent 04/16/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/16/2026Permit IssuedALL PRO PLBG & HTG INCGas, Storm, Water/Sanitary
4 projects · most recent 03/04/2026
FiledStatusContractorScope
03/04/2026Permit IssuedWCK ELECTRIC CORP.4 meters, 1 new_meters
09/11/2025Permit IssuedRICHARD NEU—
08/30/2019CompleteWILLDAN ELECTRICAL OF NY—
03/30/2018CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 04/14/2025
Concrete
FiledStatusContractorScope
04/14/2025Permit IssuedWILL DUBOSE DESIGN LLCConcrete
1 project · most recent 09/09/2025
Sidewalk Shed
FiledStatusContractorScope
09/09/2025Signed-offCLASSIC CONSULTING GROUPSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/17/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
07/20/2026Shutoff dampersINDARDEO PARBHUNATHenergy_progress
07/20/2026HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
07/20/2026Ventilation and air distribution systemINDARDEO PARBHUNATHenergy_progress
07/20/2026Duct leakage testing, insulation and designINDARDEO PARBHUNATHenergy_progress
07/20/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
07/20/2026FinalNAVEEN KUMARprogress
07/20/2026Exhaust and Vent Systems in Plenums and DuctsINDARDEO PARBHUNATHspecial
07/20/2026Mechanical SystemsINDARDEO PARBHUNATHspecial
07/20/2026HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
07/20/2026Permanent certificateINDARDEO PARBHUNATHenergy_progress
07/20/2026HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
07/20/2026Maintenance informationINDARDEO PARBHUNATHenergy_progress
07/20/2026Post-installed AnchorsINDARDEO PARBHUNATHspecial
07/20/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
06/02/2026Final—progress
06/02/2026Energy Code Compliance Inspections—progress
06/02/2026Post-installed Anchors—special
06/02/2026Mechanical Systems—special
06/02/2026Fire-Resistant Penetrations and Joints—special
06/02/2026Exhaust and Vent Systems in Plenums and Ducts—special
06/02/2026HVAC-R and service water piping design and insulation—energy_progress
06/02/2026Shutoff dampers—energy_progress
06/02/2026HVAC-R and service water heating system controls—energy_progress
06/02/2026HVAC-R and service water heating equipment—energy_progress
06/02/2026Duct leakage testing, insulation and design—energy_progress
Latest 25 of 96.
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
08/21/2026B01118283-P1Request digital key ↗
08/21/2026B01118283-P2Request digital key ↗
08/21/2026B01118283-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/20/2026B01261894-I1Request digital key ↗
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit16
08/17/2026B01026043-P5Open ↗
08/17/2026B01026043-I1Open ↗
08/17/2026B01026043-P4Open ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01147241-P1Open ↗
08/13/2026B01147241-P2Open ↗
08/13/2026B01147241-I1Open ↗
▸Seals & Professional Certifications85
▸DOB NOWProgress Inspector Seal & Signature36
09/25/2026B01026043-P3Open ↗
09/25/2026B01026043-P3Open ↗
09/25/2026B01026043-P3Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/25/2026B01026043-P3Open ↗
09/02/2026B01026043-S1Open ↗
09/02/2026B01147241-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/21/2026B01118283-P1Open ↗
08/21/2026B01118283-P3Open ↗
08/21/2026B01118283-P2Open ↗
Showing 3 of 23 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B01147241-P2Open ↗
08/13/2026B01147241-P1Open ↗
08/13/2026B01147241-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/21/2026B01118283-I1Open ↗
08/21/2026B01118283-P1Open ↗
08/21/2026B01118283-P2Open ↗
Showing 3 of 18 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/13/2026B01118283-P2Open ↗
08/13/2026B01118283-P1Open ↗
08/13/2026B01118283-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01118283-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/13/2026B01147241-P1Open ↗
08/13/2026B01147241-P2Open ↗
08/13/2026B01147241-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01118283-I1Open ↗