← Back
Two family brick
339 STUYVESANT AVENUE
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3046862
💬 Discuss this project
1891Year Built
3.5Stories
B1Building Class
R6BZoning
4,050 sfGross Floor Area
2Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Two family brick · 1,600 sf lot · 2.53 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Roof32p · 2 filings · 20 docs
Floor 361p · 1 filing · 20 docs
Floor 261p · 1 filing · 20 docs
Floor 162p · 1 filing · 20 docs
Cellar66p · 1 filing · 20 docs
Basement60p · 1 filing · 20 docs
Sub-Basement1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/13/2025$3.5M—339 STUYVESANT LLC → Private party$864/sf building
05/04/2023$1.3M—— → —$327/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC110/27/2025
ADB ASSOCIATES403/20/2025
TECHNEMOTION DESIGN801/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHRISE GROUP1203/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244110/27/2025
HRF SERVICES CORP56161203/20/2025
Building Lifecycle
All (113)Filed (13)Permit Issued (5)Signed Off (4)Violation (17)Inspection (10)Objection (34)Special Inspection (30)
05/06/2026
Violation issued (HPD, open)
A
03/02/2026
Signed off — Alteration
B01307658-I1
11/20/2025
Violation issued (HPD, open)
I
10/31/2025
Permit issued — Solar
B01307658-I1-SL
10/27/2025
Filed — Alteration
B01307658-I1
10/23/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/23/2025
Special inspection requirement — Final
NARESH MAHANGU
10/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
10/23/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
06/11/2025
Violation issued (HPD, open)
A
05/09/2025
Signed off — Alteration CO
SPRINKLER SYSTEM FOR INTERIOR RENOVATION THROUGHOUT FOR CONVERSION TO TWO FAMILY DWELLING
B00903891-S5
04/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
04/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
04/10/2025
Special inspection requirement — Metering
FAHAD FATEH
04/10/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/10/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/25/2025
Signed off — Alteration CO
SPRINKLER SYSTEM FOR INTERIOR RENOVATION THROUGHOUT FOR CONVERSION TO TWO FAMILY DWELLING
B00903891-S6
03/20/2025
Filed — Alteration CO
SPRINKLER SYSTEM FOR INTERIOR RENOVATION THROUGHOUT FOR CONVERSION TO TWO FAMILY DWELLING
B00903891-P8
03/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/20/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
03/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/20/2025
Special inspection requirement — Metering
FAHAD FATEH
03/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/11/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
02/11/2025
Special inspection requirement — Final
FAHAD FATEH
02/11/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
02/11/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
02/11/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
02/11/2025
Special inspection requirement — Metering
FAHAD FATEH
02/11/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/11/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/04/2025
Signed off — Alteration CO
SPRINKLER SYSTEM FOR INTERIOR RENOVATION THROUGHOUT FOR CONVERSION TO TWO FAMILY DWELLING
B00903891-S3
01/30/2025
Objection resolved — Addressed
01/29/2025
Objection raised — Scope
01/22/2025
Filed — Alteration CO
SPRINKLER SYSTEM FOR INTERIOR RENOVATION THROUGHOUT FOR CONVERSION TO TWO FAMILY DWELLING
B00903891-P7
01/15/2025
Filed — Alteration CO
SPRINKLER SYSTEM FOR INTERIOR RENOVATION THROUGHOUT FOR CONVERSION TO TWO FAMILY DWELLING
B00903891-P6
01/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/10/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/22/2024
Permit issued — Sprinklers
B00903891-S3-EW-SP
11/13/2024
Filed — Alteration CO
SPRINKLER SYSTEM FOR INTERIOR RENOVATION THROUGHOUT FOR CONVERSION TO TWO FAMILY DWELLING
B00903891-P5
11/13/2024
Objection resolved — Addressed
11/12/2024
Objection raised — Mechanical
11/04/2024
Filed — Alteration CO
SPRINKLER SYSTEM FOR INTERIOR RENOVATION THROUGHOUT FOR CONVERSION TO TWO FAMILY DWELLING
B00903891-P4
10/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/30/2024
Filed — Alteration CO
SPRINKLER SYSTEM FOR INTERIOR RENOVATION THROUGHOUT FOR CONVERSION TO TWO FAMILY DWELLING
B00903891-P3
09/20/2024
Permit issued — Mechanical Systems
B00903891-S6-MS
09/09/2024
Objection resolved — Addressed
08/27/2024
Objection raised — Energy
08/20/2024
Objection resolved — Addressed
08/19/2024
Objection raised — Other
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC10/31/2025
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL11/22/2024
DOB NOWMechanical SystemsSigned-offNYC BUILDING SOLUTIONS CO09/20/2024
DOB NOWPlumbingSigned-offN AND S PLUMBING INC05/17/2024
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO03/13/2024
1 project · most recent 03/20/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/20/2025Signed-offNYC BUILDING SOLUTIONS COAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman GSXN3N6010AB 60,000 BTU · Condensing Unit ×2
Heat / Cool
Cooper & Hunter CH-28MES-230VO 28,000 BTU · Heat Pump Outdoor ×2
CH-ES12-2300VO 120,000 BTU · Heat Pump Outdoor ×2
Heating
Goodman GM9S921005CN 120,000 BTU · Fan Coil Indoor ×1
GSXN3N6010AB 120,000 BTU · Ahu ×1
Ventilation
Whisper Warm FV-11VH1 50 CFM · Exhaust Fan ×16
Zephyr Z5H 100 CFM · Exhaust Fan ×4
1 project · most recent 03/20/2025
Sprinkler System
FiledStatusContractorScope
03/20/2025Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 03/20/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/20/2025Signed-offKISHAN PLUMBING INCGas, Water/Sanitary
2 projects · most recent 10/23/2025
General Wiring
FiledStatusContractorScope
10/23/2025CompleteBROOKYLN SOLARWORKS, LLC—
03/11/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/10/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
10/23/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/23/2025FinalNARESH MAHANGUprogress
10/23/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
10/23/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
10/23/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
04/10/2025Maintenance informationFAHAD FATEHenergy_progress
04/10/2025MeteringFAHAD FATEHenergy_progress
04/10/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/10/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/10/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/10/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/10/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/20/2025Maintenance informationFAHAD FATEHenergy_progress
03/20/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/20/2025MeteringFAHAD FATEHenergy_progress
03/20/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/20/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/20/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
03/20/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/11/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/11/2025Mechanical SystemsFAHAD FATEHspecial
02/11/2025Heating SystemsFAHAD FATEHspecial
02/11/2025FinalFAHAD FATEHprogress
02/11/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
02/11/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
Latest 25 of 73.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/24/2026B00903891-S3Request digital key ↗
08/24/2026B00903891-P1Request digital key ↗
08/24/2026B00903891-S6Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
08/13/2026B00903891-S5Open ↗
08/13/2026B00903891-P1Open ↗
08/13/2026B01307658-I1Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00903891-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature15
09/27/2026B00903891-S6Open ↗
09/27/2026B00903891-S6Open ↗
09/26/2026B00903891-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/13/2026B00903891-S6Open ↗
08/13/2026B00903891-S3Open ↗
08/13/2026B01307658-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/27/2026B00903891-S6Open ↗
09/26/2026B00903891-P3Open ↗
09/01/2026B00903891-S5Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist12
08/13/2026B00903891-S6Open ↗
08/13/2026B00903891-P8Open ↗
08/13/2026B00903891-P1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/13/2026B00903891-P8Open ↗
08/13/2026B00903891-P7Open ↗
08/13/2026B00903891-P6Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01307658-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form1
08/13/2026B00903891-S6Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026B00903891-P1Open ↗
08/13/2026B00903891-P6Open ↗
08/13/2026B00903891-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00903891-I1Open ↗