← Back
Two family brick
3399 FULTON STREET
BROOKLYN · BIN 3092440
💬 Discuss this project
1920Year Built
3Stories
B1Building Class
R5Zoning
3,246 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: DEER CITY USA LLC · 1,967 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureCivil
Floor 35p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEER CITY LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/25/2022$1.1M—— → —$327/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FLUSHING ENGINEERING SERVICE PC111/17/2023
AMERILAND BROOK LLC809/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TRI-NORTH CONTRACTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MILES GLASS & METAL SIGNGeneral Contractor303/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373111/17/2023
AMERILAND BROOK LLC1506809/28/2023
Building Lifecycle
All (59)Filed (9)Permit Issued (4)Signed Off (1)Violation (7)Inspection (6)Objection (2)Special Inspection (30)
05/04/2026
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
A
04/10/2024
Violation issued (HPD, closed)
A
02/20/2024
Signed off — Alteration
PROPOSED TO INSTALL NON-ILLUMINATED ACCESSORY AWNING WITH LETTERING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00956226-I1
02/16/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/02/2024
Permit issued — General Construction
B00956226-I1-GC
12/18/2023
Objection resolved — Addressed
11/20/2023
Objection raised — Admin
11/17/2023
Filed — Alteration
PROPOSED TO INSTALL NON-ILLUMINATED ACCESSORY AWNING WITH LETTERING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00956226-I1
10/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
KY FU
10/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
10/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
10/02/2023
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
10/02/2023
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
10/02/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
10/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
09/28/2023
Filed — Alteration
INSTALL BOILER EQUIPMENT AT CELLAR INCONJUNCTION WITH JOB#B00751891 & B00769183
B00751891-P3
09/26/2023
Filed — Alteration
INSTALL BOILER EQUIPMENT AT CELLAR INCONJUNCTION WITH JOB#B00751891 & B00769183
B00751891-P2
09/26/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
09/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
09/26/2023
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
09/26/2023
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
09/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
09/26/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
09/06/2023
Permit issued — Boiler Equipment
B00751891-S1-BE
09/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
09/05/2023
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
09/05/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
09/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
09/03/2023
Filed — Alteration
INSTALL BOILER EQUIPMENT AT CELLAR INCONJUNCTION WITH JOB#B00751891 & B00769183
B00751891-P1
09/03/2023
Filed — Alteration
INSTALL BOILER EQUIPMENT AT CELLAR INCONJUNCTION WITH JOB#B00751891 & B00769183
B00751891-S1
07/14/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/30/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
06/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/30/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/29/2023
Filed — Alteration
FILE PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-2 APPLICATION JOB# B00751891.
B00769183-P2
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/29/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
04/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
04/24/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
04/24/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
04/24/2023
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
03/23/2023
Violation issued (HPD, closed)
A
01/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/03/2022
Filed — Alteration
FILE PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-2 APPLICATION JOB# B00751891.
B00769183-P1
11/03/2022
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
11/03/2022
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
11/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
08/09/2022
Permit issued — General Construction
B00751891-I1-GC
08/09/2022
Permit issued — Plumbing
B00769183-I1-PL
07/05/2022
Filed — Alteration
INSTALL BOILER EQUIPMENT AT CELLAR INCONJUNCTION WITH JOB#B00751891 & B00769183
B00751891-I1
07/05/2022
Filed — Alteration
FILE PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-2 APPLICATION JOB# B00751891.
B00769183-I1
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
I
04/09/2021
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMILES GLASS & METAL SIGN01/02/2024
DOB NOWBoiler EquipmentSigned-offWATSON'S PLBG, HTG, & BDG09/06/2023
DOB NOWGeneral ConstructionPermit IssuedSPLEN CONSTRUCTION INC08/09/2022
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG08/09/2022
1 project · most recent 06/29/2023
Gas Water/Sanitary
FiledStatusContractorScope
06/29/2023Signed-offWATSON'S PLBG, HTG, & BDGGas, Water/Sanitary
1 project · most recent 05/18/2023
General Wiring
FiledStatusContractorScope
05/18/2023Permit IssuedKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/16/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/26/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
10/31/2023Tenant Protection Plan ComplianceKY FUspecial
10/02/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
10/02/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
10/02/2023Permanent certificateXIAOHONG ZHAOenergy_progress
10/02/2023Heating SystemsXIAOHONG ZHAOspecial
10/02/2023Maintenance informationXIAOHONG ZHAOenergy_progress
10/02/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
09/26/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
09/26/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
09/26/2023Permanent certificateXIAOHONG ZHAOenergy_progress
09/26/2023Heating SystemsXIAOHONG ZHAOspecial
09/26/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
09/26/2023Maintenance informationXIAOHONG ZHAOenergy_progress
09/05/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
09/05/2023Interior lighting powerXIAOHONG ZHAOenergy_progress
09/05/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
09/05/2023Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
06/30/2023Maintenance informationXIAOHONG ZHAOenergy_progress
06/30/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/30/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
06/29/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/29/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
06/29/2023Maintenance informationXIAOHONG ZHAOenergy_progress
04/24/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
04/24/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
Latest 25 of 30.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026B00769183-P2Request digital key ↗
08/29/2026B00769183-P1Request digital key ↗
08/29/2026B00769183-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026B00751891-S1Open ↗
09/23/2026B00751891-S1Open ↗
09/23/2026B00751891-S1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B00751891-S1Open ↗
09/02/2026B00751891-I1Open ↗
08/27/2026B00956226-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026B00769183-P2Open ↗
08/29/2026B00769183-P1Open ↗
08/29/2026B00769183-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00751891-P1Open ↗