← Back
Two stories - detached, small or mid-size
34-05 CORPORAL KENNEDY STREET
QUEENS · BIN 4624408
💬 Discuss this project
2023Year Built
2Stories
A1Building Class
R2AZoning
2,134 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 210p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO CITY CONSTRUCTION303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/23/2025$1.8M—Private party → CK99 LLC$858/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LI ARCHITECT ASSOCIATE, PLLC805/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LI ARCHITECT ASSOCIATE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METRO CITY CONSTRUCTIONGeneral Contractor804/08/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613705/20/2025
Building Lifecycle
All (64)Filed (7)Permit Issued (5)Signed Off (2)Violation (3)Inspection (7)Objection (10)Special Inspection (30)
08/26/2025
Signed off — New Building
PROPOSED A 2-STORY AND 1-FAMILY NEW BUILDING WITH CELLAR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY/
Q08009280-S1
08/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2025
Signed off — New Building
PROPOSED A 2-STORY AND 1-FAMILY NEW BUILDING WITH CELLAR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY/
Q08009280-S2
07/09/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
06/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
06/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
06/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
05/20/2025
Filed — New Building
PROPOSED A 2-STORY AND 1-FAMILY NEW BUILDING WITH CELLAR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY/
Q08009280-P5
04/24/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/21/2025
Filed — New Building
PROPOSED A 2-STORY AND 1-FAMILY NEW BUILDING WITH CELLAR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY/
Q08009280-P4
04/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
04/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
04/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
04/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
04/17/2025
Special inspection requirement — Maintenance information
Fran Huang
04/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/31/2025
Permit issued — Structural
Q08009280-I1-MS
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
03/26/2025
Special inspection requirement — Footing and Foundation
Fran Huang
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
03/26/2025
Special inspection requirement — Structural Steel - Details
Fran Huang
03/26/2025
Special inspection requirement — Mechanical Systems
Fran Huang
03/26/2025
Special inspection requirement — Chimneys and vents
Fran Huang
03/26/2025
Special inspection requirement — Protection of exposed foundation insulation
Fran Huang
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
03/26/2025
Special inspection requirement — Heating Systems
Fran Huang
03/26/2025
Special inspection requirement — Structural Steel - Welding
Fran Huang
03/26/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Fran Huang
03/26/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
XIUCHENG LI
03/26/2025
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
03/26/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Fran Huang
03/26/2025
Special inspection requirement — Masonry
Fran Huang
03/26/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Fran Huang
03/26/2025
Special inspection requirement — Structural Wood Frame
Fran Huang
03/26/2025
Special inspection requirement — Final
Fran Huang
03/26/2025
Special inspection requirement — Maintenance information
Fran Huang
03/05/2025
Permit issued — Curb Cut
Q08009280-S2-CC
02/28/2025
Filed — New Building
PROPOSED A 2-STORY AND 1-FAMILY NEW BUILDING WITH CELLAR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY/
Q08009280-P1
02/28/2025
Filed — New Building
PROPOSED A 2-STORY AND 1-FAMILY NEW BUILDING WITH CELLAR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY/
Q08009280-P3
12/19/2024
Filed — New Building
PROPOSED A 2-STORY AND 1-FAMILY NEW BUILDING WITH CELLAR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY/
Q08009280-S2
10/24/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/24/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/15/2024
Permit issued — Plumbing
Q08009280-S1-PL
09/25/2024
Objection resolved — Addressed
09/24/2024
Permit issued — Foundation
Q08009280-I1-GC-CX
05/29/2024
Violation issued (ECB, closed)
Construction
05/29/2024
Violation issued (ECB, closed)
Construction
04/16/2024
Objection raised — Scope
04/08/2024
Filed — New Building
PROPOSED A 2-STORY AND 1-FAMILY NEW BUILDING WITH CELLAR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY/
Q08009280-S1
03/04/2024
Violation issued (ECB, closed)
Construction
09/19/2023
Permit issued — Mechanical Systems
Q08009280-I1-GC-CX
07/19/2023
Objection raised — Energy
07/19/2023
Objection resolved — Addressed
07/02/2023
Objection raised — Admin
07/02/2023
Objection resolved — Addressed
10/06/2022
Objection raised — Scope
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMETRO CITY CONSTRUCTION03/31/2025
DOB NOWCurb CutSigned-offMETRO CITY CONSTRUCTION03/05/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS10/15/2024
DOB NOWFoundationPermit IssuedMETRO CITY CONSTRUCTION09/24/2024
DOB NOWMechanical SystemsPermit IssuedMETRO CITY CONSTRUCTION09/19/2023
1 project · most recent 05/20/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/20/2025Signed-offMETRO CITY CONSTRUCTIONAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-4C36NA3 16,000 BTU · Heat Pump Outdoor ×1
Ventilation
Mitsubishi Electric MITSUBISHI 75 CFM ×1
1 project · most recent 05/20/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2025Signed-offDYNAMIC PLBG & SPRKLR CORGas, Storm, Water/Sanitary
1 project · most recent 03/27/2025
General Wiring
FiledStatusContractorScope
03/27/2025CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 05/20/2025
Concrete Masonry Wood
FiledStatusContractorScope
05/20/2025Signed-offMETRO CITY CONSTRUCTIONConcrete, Masonry, Wood
1 project · most recent 05/20/2025
Earthwork
FiledStatusContractorScope
05/20/2025Signed-offMETRO CITY CONSTRUCTIONEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/09/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
04/24/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
04/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/24/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
06/02/2025HVAC-R and service water heating equipmentFran Huangenergy_progress
06/02/2025HVAC-R and service water heating system controlsFran Huangenergy_progress
06/02/2025HVAC-R and service water piping design and insulationFran Huangenergy_progress
06/02/2025Energy Code Compliance InspectionsFran Huangprogress
06/02/2025Fire-Resistant Penetrations and JointsFran Huangspecial
04/17/2025Fire-Resistant Penetrations and JointsFran Huangspecial
04/17/2025Energy Code Compliance InspectionsFran Huangprogress
04/17/2025HVAC-R and service water heating equipmentFran Huangenergy_progress
04/17/2025HVAC-R and service water piping design and insulationFran Huangenergy_progress
04/17/2025HVAC-R and service water heating system controlsFran Huangenergy_progress
04/17/2025Maintenance informationFran Huangenergy_progress
03/26/2025Insulation placement and R valuesFran Huangenergy_progress
03/26/2025Excavations - Sheeting, Shoring, and BracingFran Huangspecial
03/26/2025Fire-Resistant Penetrations and JointsFran Huangspecial
03/26/2025Heating SystemsFran Huangspecial
03/26/2025Structural Steel - WeldingFran Huangspecial
03/26/2025Subsurface Investigations (Borings/Test Pits)XIUCHENG LIspecial
03/26/2025Concrete - Cast-In-PlaceFran Huangspecial
03/26/2025Mechanical SystemsFran Huangspecial
03/26/2025Structural Steel - High Strength BoltingFran Huangspecial
03/26/2025MasonryFran Huangspecial
03/26/2025Structural Steel - DetailsFran Huangspecial
03/26/2025Chimneys and ventsFran Huangspecial
03/26/2025Wood – Prefabricated I-JoistsFran Huangspecial
03/26/2025Structural Wood FrameFran Huangprogress
Latest 25 of 81.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026Q08009280-P1Request digital key ↗
08/20/2026Q08009280-P2Request digital key ↗
08/20/2026Q08009280-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION1
01/02/2025440821513Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
07/23/2025440821513Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/03/2025440821513Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026Q08009280-P1Open ↗
08/14/2026Q08009280-I1Open ↗
08/13/2026Q08009280-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08009280-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature18
09/02/2026Q08009280-P1Open ↗
09/02/2026Q08009280-P1Open ↗
08/27/2026Q08009280-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026Q08009280-I1Open ↗
08/20/2026Q08009280-P3Open ↗
08/20/2026Q08009280-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q08009280-P1Open ↗
09/02/2026Q08009280-P1Open ↗
08/27/2026Q08009280-P3Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/02/2025440821513Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/02/2025440821513Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/20/2026Q08009280-P1Open ↗
08/14/2026Q08009280-I1Open ↗
08/13/2026Q08009280-P2Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
08/20/2026Q08009280-P1Open ↗
08/14/2026Q08009280-I1Open ↗
08/13/2026Q08009280-P2Open ↗
▸BISSTREET TREES SITE PLAN1
01/02/2025440821513Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q08009280-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q08009280-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q08009280-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/20/2026Q08009280-P1Open ↗
08/14/2026Q08009280-I1Open ↗
08/13/2026Q08009280-P2Open ↗
▸BISBPP: FIELD INSPECTION1
07/23/2025440821513Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q08009280-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/23/2025440821513Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
07/23/2025440821513Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
01/02/2025440821513Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/02/2025440821513Open ↗
▸Other Documents19
▸DOB NOWWaiver Document4
08/20/2026Q08009280-S1Open ↗
08/20/2026Q08009280-P3Open ↗
08/20/2026Q08009280-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/20/2026Q08009280-P1Open ↗
08/14/2026Q08009280-I1Open ↗
08/13/2026Q08009280-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/20/2026Q08009280-P1Open ↗
08/14/2026Q08009280-I1Open ↗
08/13/2026Q08009280-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q08009280-P1Open ↗
08/14/2026Q08009280-I1Open ↗
08/13/2026Q08009280-P2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
07/23/2025440821513Open ↗
01/02/2025440821513Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
07/23/2025440821513Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
07/23/2025440821513Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08009280-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08009280-I1Open ↗