← Back
Banking facility, with or without parking
34-15 FRANCIS LEWIS BLVD
QUEENS · Auburndale · BIN 4450474
💬 Discuss this project
1972Year Built
1Stories
K7Building Class
R5BZoning
5,522 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Banking facility, with or without parking · Owner of record: 3415 FLB LLC · 9,170 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction50p · 3 filings · 20 docs
Floor 5Under Construction53p · 2 filings · 20 docs
Floor 4Under Construction50p · 1 filing · 20 docs
Floor 3Under Construction50p · 1 filing · 20 docs
Floor 2Under Construction49p · 1 filing · 20 docs
Floor 1Under Construction49p · 1 filing · 20 docs
CellarUnder Construction50p · 2 filings · 20 docs
Site & exteriorUnder Construction24p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DYNASTY CONTRACTING4309/24/2026
CITIZENS BANK507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/20/2024$3.1M—CITIZENS BANK, N.A. → 3415 FLB LLC$561/sf building
02/18/2022$1.6M—— → —$290/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KAZAM CONSULTANTS403/21/2026
ALPHA HOME DESIGN LLC1203/21/2026
CNY ENGINEERING PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL BOROUGH GROUP SVC INCGeneral Contractor907/08/2026
GOLDEN TIME CONTRACTING IGeneral Contractor307/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor309/24/2026
BALATON CONSULTING LLCScaffold207/08/2026
MPS PLUMBING & HEATING INCFire Protection107/08/2026
KSP PLUMBING INCPlumbing107/04/2026
PLUMBING NYC, INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129607/08/2025
A & T DESIGN GROUP LLC1088201/03/2025
Building Lifecycle
All (130)Filed (15)Permit Issued (19)Signed Off (3)Violation (16)Inspection (3)Objection (44)Special Inspection (30)
09/23/2026
Permit issued — Sidewalk Shed
Q01367322-I1-SH
07/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/20/2026
Violation issued (ECB, open)
Unknown
06/12/2026
Permit issued — Sidewalk Shed
Q01367322-I1-SH
04/15/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01367322-P1
04/09/2026
Permit issued — Protection and Mechanical Methods
Q01374630-I1-PMM
04/02/2026
Objection raised — Other
04/02/2026
Objection resolved — Addressed
03/24/2026
Filed — Alteration
Use of mini crane for facade construction as per plans filed herewith
Q01374630-I1
03/20/2026
Permit issued — Sidewalk Shed
Q01367322-I1-SH
03/10/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01367322-I1
03/06/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/20/2026
Permit issued — Plumbing
Q01201790-S2-PL
02/20/2026
Permit issued — Sprinklers
Q01201790-S2-EW-SP
10/16/2025
Violation issued (ECB, closed)
Unknown
10/14/2025
Permit issued — General Construction
Q01201790-I1-GC
10/07/2025
Permit issued — Construction Fence
Q01218311-I1-FN
09/22/2025
Permit issued — Mechanical Systems
Q01201790-S1-MS
09/22/2025
Permit issued — General Construction
Q01201790-I1-GC
09/22/2025
Permit issued — Support of Excavation
Q01201790-S3-SE
09/22/2025
Permit issued — Foundation
Q01201790-S4-FO-EA
09/22/2025
Permit issued — Structural
Q01201790-S5-ST
08/11/2025
Objection raised — Admin
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
08/11/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/24/2025
Objection raised — Structural
07/24/2025
Objection raised — Admin
07/24/2025
Objection raised — Structural
07/24/2025
Objection raised — Structural
07/24/2025
Objection raised — Structural
07/24/2025
Objection raised — Structural
07/24/2025
Objection raised — Admin
07/24/2025
Objection raised — Structural
07/24/2025
Objection raised — Structural
07/23/2025
Objection raised — Energy
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Admin
07/22/2025
Objection raised — Other
07/08/2025
Filed — New Building
FILE FOUNDATION AND EARTHWORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201790-S3
07/08/2025
Filed — New Building
FILE FOUNDATION AND EARTHWORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201790-S5
07/08/2025
Filed — New Building
FILE FOUNDATION AND EARTHWORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201790-S4
07/07/2025
Filed — New Building
FILE FOUNDATION AND EARTHWORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201790-S1
07/07/2025
Filed — New Building
FILE FOUNDATION AND EARTHWORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01201790-S2
06/25/2025
Special inspection requirement — Final
MEHDI GHAZI
06/25/2025
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
06/24/2025
Violation issued (ECB, closed)
Construction
06/24/2025
Violation issued (ECB, closed)
Unknown
06/24/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC09/23/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC06/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedGOLDEN TIME CONTRACTING I04/09/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC03/20/2026
DOB NOWPlumbingPermit IssuedKSP PLUMBING INC02/20/2026
DOB NOWSprinklersPermit IssuedMPS PLUMBING & HEATING INC02/20/2026
DOB NOWGeneral ConstructionPermit IssuedALL BOROUGH GROUP SVC INC10/14/2025
DOB NOWConstruction FencePermit IssuedALL BOROUGH GROUP SVC INC10/07/2025
DOB NOWMechanical SystemsPermit IssuedALL BOROUGH GROUP SVC INC09/22/2025
DOB NOWGeneral ConstructionPermit IssuedALL BOROUGH GROUP SVC INC09/22/2025
DOB NOWSupport of ExcavationPermit IssuedALL BOROUGH GROUP SVC INC09/22/2025
DOB NOWFoundationPermit IssuedALL BOROUGH GROUP SVC INC09/22/2025
DOB NOWStructuralPermit IssuedALL BOROUGH GROUP SVC INC09/22/2025
DOB NOWConstruction FencePermit IssuedGOLDEN TIME CONTRACTING I05/08/2025
DOB NOWSprinklersSigned-offPLUMBING NYC, INC03/17/2025
DOB NOWFull DemolitionSigned-offALL BOROUGH GROUP SVC INC03/03/2025
DOB NOWConstruction FenceSigned-offGOLDEN TIME CONTRACTING I02/27/2025
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO02/10/2022
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO02/09/2022
BISOTISSUEDFIRST REFRIGERATION05/20/1999
BISOTISSUEDCROSSLAND SAVINGS BANK07/30/1990
1 project · most recent 07/08/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2025Permit IssuedALL BOROUGH GROUP SVC INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NA3 22,000 BTU · Condensing Unit ×21
MXZ-3C30NA3 28,400 BTU · Condensing Unit ×6
PURY-P120TNU-A 120,000 BTU · Vrf Outdoor ×2
PUMY-P60NKMU 60,000 BTU · Vrf Outdoor ×1
PUZ‐HA24NHA1 24,000 BTU · Condensing Unit ×1
Daikin DPS-003-AHHE2 36,000 BTU · Rooftop Unit ×1
Ventilation
Mitsubishi Electric LGH-F600RVX2-E 600 CFM · Erv ×2
LGH-F300RVX-E 300 CFM · Erv ×1
2 projects · most recent 07/08/2025
Sprinkler System
FiledStatusContractorScope
07/08/2025Permit IssuedMPS PLUMBING & HEATING INSprinkler System
01/20/2025Signed-offPLUMBING WORKS NYC INC—
1 project · most recent 07/08/2025
Storm Water/Sanitary
FiledStatusContractorScope
07/08/2025Permit IssuedKSP PLUMBING INCStorm, Water/Sanitary
4 projects · most recent 07/27/2026
General Wiring
FiledStatusContractorScope
07/27/2026Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
06/24/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
03/04/2026Permit IssuedNASH ELECTRIC SERVICES IN—
02/17/2022CompleteSRM ELECTRICAL SVC INC—
1 project · most recent 07/08/2025
FiledStatusContractorScope
07/08/2025Permit IssuedMPS PLUMBING & HEATING IN4 scope_items
3 projects · most recent 04/15/2026
Fence Sidewalk Shed
FiledStatusContractorScope
04/15/2026Permit IssuedMC SUPERSTRUCTURE INCSidewalk Shed
04/30/2025Permit IssuedALL BOROUGH GROUP SVC INCFence
01/20/2025Signed-offPLUMBING NYC, INCFence
1 project · most recent 07/08/2025
Earthwork
FiledStatusContractorScope
07/08/2025Permit IssuedKSP PLUMBING INCEarthwork
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/16/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/06/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
06/25/2025FinalMEHDI GHAZIprogress
06/25/2025Concrete - Cast-In-PlaceMEHDI GHAZIspecial
06/23/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
06/23/2025Maintenance informationMEHDI GHAZIenergy_progress
06/23/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
06/23/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
06/23/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
06/23/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
06/23/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
06/09/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
06/09/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
06/09/2025Mechanical SystemsMEHDI GHAZIspecial
06/09/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
06/09/2025FinalMEHDI GHAZIprogress
06/09/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
06/09/2025Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
06/09/2025Maintenance informationMEHDI GHAZIenergy_progress
06/09/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
06/09/2025Shutoff dampersMEHDI GHAZIenergy_progress
06/09/2025Sprinkler SystemsMEHDI GHAZIspecial
04/01/2025Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
03/31/2025Lighting controlsMEHDI GHAZIenergy_progress
03/31/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
03/31/2025Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
03/31/2025Lighting in dwelling unitsMEHDI GHAZIenergy_progress
Latest 25 of 42.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/26/2026Q00671947-I1Request digital key ↗
08/26/2026Q00671951-I1Request digital key ↗
08/21/2026Q01158281-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01201790-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01201790-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01201790-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/21/2026Q01158281-I1Open ↗
08/21/2026Q01158281-S1Open ↗
08/21/2026Q01158281-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026Q01201790-S1Open ↗
09/23/2026Q01201790-S1Open ↗
09/23/2026Q01201790-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q01201790-S1Open ↗
09/01/2026Q01201790-I1Open ↗
09/01/2026Q01201790-I1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01201790-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01158281-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01158281-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q01158281-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01158281-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01201790-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01201790-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026Q01158281-I1Open ↗
08/21/2026Q01158281-S1Open ↗
08/21/2026Q01158281-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRodent Control1
08/13/2026Q01158281-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01201790-I1Open ↗
08/13/2026Q01201790-S4Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026Q01201790-I1Open ↗
08/13/2026Q01201790-S4Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01158281-I1Open ↗
08/19/2026Q01201790-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01201790-S4Open ↗
08/13/2026Q01201790-S3Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01201790-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01158281-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01158281-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01201790-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01158281-I1Open ↗