← Back
Two family frame
34-16 38TH STREET
QUEENS · BIN 4625664
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R6AZoning
2,324 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · Owner of record: LIC 38 REALTY LLC · 5,175 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 2 filings · 20 docs
Floor 9Under Construction10p · 1 filing · 20 docs
Floor 8Under Construction11p · 1 filing · 20 docs
Floor 7Under Construction10p · 1 filing · 20 docs
Floor 6Under Construction34p · 1 filing · 20 docs
Floor 5Under Construction82p · 1 filing · 20 docs
Floor 4Under Construction82p · 1 filing · 20 docs
Floor 3Under Construction83p · 1 filing · 20 docs
Floor 2Under Construction61p · 1 filing · 20 docs
Floor 1Under Construction86p · 1 filing · 20 docs
CellarUnder Construction65p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
E 53 STREET909/15/2026
OWNERS REP1607/08/2026
1605 NY REALTY2904/09/2026
LIC 38 REALTY LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1803/21/2026
SPEEDY EXPEDITING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor607/08/2026
Y&L INTERIOR LLCGeneral Contractor604/09/2026
BRUCHE MECHANICAL NY LLCFire Protection307/08/2026
APEX GROUP NY CORPGeneral Contractor104/09/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
PLBG P & H INCPlumbing107/08/2026
24 SEVEN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941409/10/2026
Building Lifecycle
All (154)Filed (26)Permit Issued (18)Signed Off (15)Violation (15)Inspection (21)Objection (26)Special Inspection (30)Tax Incentive (3)
03/01/2027
485-x construction completed
09/10/2026
Filed — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-A1
09/10/2026
Special inspection requirement — Interior lighting power
Paul Raymond
09/10/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
09/10/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
09/10/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
09/10/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
09/10/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
09/10/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
09/10/2026
Special inspection requirement — Electrical motors and elevators
Paul Raymond
09/10/2026
Special inspection requirement — Fenestration areas
Paul Raymond
09/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
09/10/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
09/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
09/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
09/10/2026
Special inspection requirement — Metering
Paul Raymond
09/10/2026
Special inspection requirement — Maintenance information
Paul Raymond
09/10/2026
Special inspection requirement — Lighting controls
Paul Raymond
09/10/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
08/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
08/27/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
08/27/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
08/27/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
08/27/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
08/27/2026
Special inspection requirement — Metering
Paul Raymond
08/27/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/27/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
08/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
08/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
08/27/2026
Special inspection requirement — Fenestration areas
Paul Raymond
08/19/2026
Signed off — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-S5
08/12/2026
Signed off — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-S8
07/29/2026
Filed — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-P9
07/28/2026
Objection resolved — Resolved
07/28/2026
Objection resolved — Resolved
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
06/26/2026
Filed — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-P7
06/23/2026
Signed off — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-S4
05/26/2026
Filed — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-P5
05/18/2026
Signed off — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-S3
05/15/2026
Signed off — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-S9
05/14/2026
Signed off — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-S2
05/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/12/2026
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Q01187781-I1
05/11/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01312784-I1
05/11/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01300518-I1
05/11/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01300526-I1
05/11/2026
Signed off — Alteration
Q01306193-I1
05/11/2026
Signed off — Alteration
Q01306203-I1
05/11/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/06/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/04/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01312780-I1
04/24/2026
Filed — New Building
PROPOSED 9 STORY + CELLAR RESIDENTIAL BUILDING
Q01150703-P4
04/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offY&L INTERIOR LLC02/11/2026
DOB NOWPlumbingSigned-off24 SEVEN PLUMBING INC01/07/2026
DOB NOWSprinklersPermit IssuedBRUCHE MECHANICAL NY LLC12/05/2025
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC12/05/2025
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC12/05/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/06/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/06/2025
DOB NOWGeneral ConstructionPermit IssuedY&L INTERIOR LLC10/23/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC10/22/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC10/21/2025
DOB NOWStructuralPermit IssuedY&L INTERIOR LLC10/17/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/09/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC10/09/2025
DOB NOWMechanical SystemsSigned-offY&L INTERIOR LLC09/30/2025
DOB NOWFoundationSigned-offY&L INTERIOR LLC09/05/2025
DOB NOWPlumbingSigned-offPLBG P & H INC08/28/2025
DOB NOWSupport of ExcavationSigned-offY&L INTERIOR LLC08/13/2025
DOB NOWSidewalk ShedSigned-offAPEX GROUP NY CORP06/26/2025
BISOTISSUEDA. INTERNATIONAL LTD04/27/2000
1 project · most recent 09/10/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/10/2026Signed-offY&L INTERIOR LLCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin RK12NMVJU 10,900 BTU · Heat Pump Outdoor ×1
Heat / Cool
Daikin 4MXM36AVJU9 36,000 BTU · Heat Pump Outdoor ×54
RXTQ36TBVJUA 36,000 BTU · Vrf Outdoor ×23
RXTQ48TBVJUA 48,000 BTU · Vrf Outdoor ×17
RXYQ192XATJA 184,000 BTU · Vrf Outdoor ×1
RXTA36AAVJU 36,000 BTU · Vrf Outdoor ×90
RXTA48AAVJU 45,500 BTU · Vrf Outdoor ×3
RXTA24AAVJU 23,000 BTU · Vrf Outdoor ×1
RXYQ192XAATJB 184,000 BTU · Vrf Outdoor ×1
Heating
Qmark CSH-07A 7,680 BTU · Baseboard ×18
Ventilation
S&P Usa Ventilation Systems TRCeN800RTH 600 CFM · Erv ×1
1 project · most recent 09/10/2026
Sprinkler System
FiledStatusContractorScope
09/10/2026Permit IssuedPLBG P & H INCSprinkler System
1 project · most recent 09/10/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/10/2026Signed-offBRUCHE MECHANICAL NY LLCStorm, Water/Sanitary
8 projects · most recent 06/19/2026
General Wiring
FiledStatusContractorScope
06/19/2026CompletePOWER DIRECT ELECTRIC INC—
12/18/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
11/19/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
11/19/2025Permit IssuedPOWER DIRECT ELECTRIC INC90 meters, 90 new_meters
11/19/2025CompletePOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
10/21/2025CompleteSOLAS ELECTRICAL CORP—
09/17/2025CompleteSOLAS ELECTRICAL CORP—
06/25/2025CompleteHIGH QUALITY ELEC.OF NYC—
1 project · most recent 09/10/2026
Concrete
FiledStatusContractorScope
09/10/2026Signed-offY&L INTERIOR LLCConcrete
1 project · most recent 01/09/2026
Sidewalk Shed
FiledStatusContractorScope
01/09/2026Signed-offCORE SCAFFOLD SYSTEMS INCSidewalk Shed
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
05/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/11/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/06/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/04/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/10/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/07/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/04/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/30/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
10/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/27/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
09/10/2026Lighting in dwelling unitsPaul Raymondenergy_progress
09/10/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
09/10/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
09/10/2026Energy Code Compliance InspectionsPaul Raymondprogress
09/10/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
09/10/2026Air barrier - visual inspectionPaul Raymondenergy_progress
09/10/2026Exterior lighting powerPaul Raymondenergy_progress
09/10/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
09/10/2026Interior lighting powerPaul Raymondenergy_progress
09/10/2026Protection of exposed foundation insulationPaul Raymondenergy_progress
09/10/2026Fenestration areasPaul Raymondenergy_progress
09/10/2026Electrical motors and elevatorsPaul Raymondenergy_progress
09/10/2026MeteringPaul Raymondenergy_progress
09/10/2026Maintenance informationPaul Raymondenergy_progress
09/10/2026Insulation placement and R valuesPaul Raymondenergy_progress
09/10/2026Lighting controlsPaul Raymondenergy_progress
09/10/2026Air barrier continuity plan testingPaul Raymondenergy_progress
09/10/2026Fenestration air leakagePaul Raymondenergy_progress
08/27/2026Lighting controlsPaul Raymondenergy_progress
08/27/2026Exterior lighting powerPaul Raymondenergy_progress
08/27/2026Maintenance informationPaul Raymondenergy_progress
08/27/2026Air barrier continuity plan testingPaul Raymondenergy_progress
08/27/2026Electrical motors and elevatorsPaul Raymondenergy_progress
08/27/2026Interior lighting powerPaul Raymondenergy_progress
08/27/2026Fenestration areasPaul Raymondenergy_progress
Latest 25 of 105.
▾Documents — 168 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
08/20/2026Q01150703-I1Request digital key ↗
08/20/2026Q01150703-P9Request digital key ↗
08/20/2026Q01150703-P7Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits4
▸DOB NOWHPD - Permit Notice2
08/14/2026Q01150703-P7Open ↗
08/13/2026Q01150703-I1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/31/2025440821835Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/31/2025440821835Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
09/15/2026Q01150703-A1Open ↗
08/20/2026Q01150703-I1Open ↗
08/14/2026Q01150703-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
09/15/2026Q01150703-A1Open ↗
08/14/2026Q01150703-P7Open ↗
08/13/2026Q01150703-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
09/15/2026Q01150703-A1Open ↗
08/14/2026Q01150703-P7Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01150703-I1Open ↗
▸Seals & Professional Certifications63
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/15/2026Q01150703-A1Open ↗
08/20/2026Q01150703-P9Open ↗
08/20/2026Q01150703-P7Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/27/2026Q01150703-I1Open ↗
09/27/2026Q01150703-I1Open ↗
09/27/2026Q01150703-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/27/2026Q01150703-I1Open ↗
09/27/2026Q01150703-I1Open ↗
09/23/2026Q01150703-A1Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/31/2025440821835Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/31/2025440821835Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q01150703-I1—
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01150703-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
09/15/2026Q01150703-A1Open ↗
08/14/2026Q01150703-P7Open ↗
08/13/2026Q01150703-I1Open ↗
▸BISSTREET TREE CHECKLIST2
03/17/2025440821835Open ↗
01/31/2025440821835Open ↗
▸BISSTREET TREES SITE PLAN1
03/17/2025440821835Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/17/2025440821835Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/17/2025440821835Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01150703-I1Open ↗
▸Environmental & Asbestos36
▸DOB NOWOER: Notice to Proceed22
09/15/2026Q01150703-A1Open ↗
08/20/2026Q01150703-P5Open ↗
08/20/2026Q01150703-P4Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
08/20/2026Q01150703-P5Open ↗
08/20/2026Q01150703-S5Open ↗
08/20/2026Q01150703-S4Open ↗
Showing 3 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/31/2025440821835Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT3
08/13/2026Q01150703-P1Open ↗
08/13/2026Q01150703-S2Open ↗
08/13/2026Q01150703-S1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
02/18/2025440821835Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/31/2025440821835Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/31/2025440821835Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
09/15/2026Q01150703-A1Open ↗
08/14/2026Q01150703-P7Open ↗
08/13/2026Q01150703-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
09/15/2026Q01150703-A1Open ↗
08/14/2026Q01150703-P7Open ↗
08/13/2026Q01150703-I1Open ↗
▸DOB NOWProperty Ownership Certification3
09/15/2026Q01150703-A1Open ↗
08/20/2026Q01150703-I1Open ↗
08/14/2026Q01150703-P7Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
02/18/2025440821835Open ↗
01/31/2025440821835Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01150703-S1Open ↗
▸DOB NOWFinal Survey1
08/20/2026Q01150703-I1Open ↗