Elevator apt, semi-fireproof with stores
Ravenswood (NYCHA)
34-21 21ST STREET · BIN 4430873
💬 Discuss this project
1950Year Built
6Stories
D7Building Class
R5Zoning
363,720 sfGross Floor Area
386Units
LL97 Covered12 Active Violations 4 unresolved · 8 paperwork only 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: NYC Housing Authority · 241,500 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAT&T, T-MobileUnder Construction7p · 4 filings · 20 docs
Floor 1NYC Housing Authority1p · 1 filing · 5 docs
CellarNYC Housing AuthorityUnder Construction105p · 1 filing · 20 docs
Sub-BasementNYC Housing AuthorityUnder Construction107p · 1 filing · 20 docs
Site & exteriorAT&T32p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority10010/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Liro Architects + Planners409/24/2026
The Liro Group711/03/2025
BGM Engineering210/27/2025
Synergic Design Architects103/21/2025
NYMS Consulting510/29/2023
Ventrop Engineering Consulting Group103/03/2023
Liro Engineers301/04/2023
Ysrael A. Seinuk212/07/2022
Arquitectura Varela111/11/2022
Ashraf109/23/2021
Tectonic Engineering101/08/2021
Com-EX Engineering of NY112/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Self Employed403/21/2026
Design Approve Build2603/21/2026
GC1 Expediting203/21/2026
Construction Permit Services103/21/2026
KM Associates of New York103/21/2026
K & M Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maric Mechanicalspecialty_contractor3807/08/2026
FJP MechanicalPlumbing1210/21/2026
Maric MechanicalScaffold707/08/2026
Rennon ConstructionScaffold307/08/2026
Accord PowerGeneral Contractor304/09/2026
Construction Services Con NYScaffold303/21/2026
Applied ElectricElectrical103/21/2026
Jacobs TelecommunGeneral Contractor107/08/2026
HY-Lee Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Distinct Engineering Solu26412209/24/2026
Synergic Design8561103/21/2025
Elevated Engineering3692112/02/2019
Building Lifecycle
All (182)Filed (29)Permit Issued (50)Signed Off (8)Facade (FISP) (10)Violation (27)Inspection (7)Objection (21)Special Inspection (30)
10/20/2026
Permit issued — Boiler Equipment
Q00449518-S8-BE
10/15/2026
Signed off — Alteration
Q01059444-I1
09/24/2026
Filed — Alteration
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Q00449518-A5
09/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
YAZAN YANES
09/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
09/17/2026
Special inspection requirement — Final
09/17/2026
Special inspection requirement — Energy Code Compliance Inspections
YAZAN YANES
09/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
YAZAN YANES
09/09/2026
Signed off — Alteration
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Q00449518-S2
09/01/2026
Signed off — Alteration
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Q00449518-S1
08/31/2026
Signed off — Alteration
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Q00449518-S7
08/31/2026
Signed off — Alteration
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Q00449518-S5
04/29/2026
Signed off — Alteration
Q07999374-I1
03/18/2026
Permit issued — General Construction
Q00449518-I1-GC
03/18/2026
Permit issued — Structural
Q00449518-S3-ST
03/18/2026
Permit issued — Mechanical Systems
Q00449518-S1-MS
03/03/2026
Permit issued — Solar
Q01179685-I1-SL
11/17/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Ramnarayan Tirumala
11/17/2025
Special inspection requirement — Structural Steel - Welding
Ramnarayan Tirumala
11/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/17/2025
Special inspection requirement — Structural Steel - Details
Ramnarayan Tirumala
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/03/2025
Filed — Alteration
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Q00449518-A4
10/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ramnarayan Tirumala
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
10/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/29/2025
Special inspection requirement — Heating Systems
Ramnarayan Tirumala
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
10/28/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/27/2025
Filed — Alteration
Q01059444-P1
10/22/2025
Special inspection requirement — Structural Steel - Welding
Ramnarayan Tirumala
10/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/22/2025
Special inspection requirement — Structural Steel - Details
Ramnarayan Tirumala
10/22/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Ramnarayan Tirumala
10/15/2025
Permit issued — Boiler Equipment
Q00449518-S7-BE
10/08/2025
Objection resolved — Addressed
10/03/2025
Objection raised — Scope
09/15/2025
Permit issued — Plumbing
Q00852341-I1-PL
09/12/2025
Filed — Alteration
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Q00449518-S8
09/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
YAZAN YANES
08/08/2025
Filed — Alteration
REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS.
Q00449518-S7
08/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
YAZAN YANES
08/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YAZAN YANES
08/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
YAZAN YANES
08/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
YAZAN YANES
07/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2025
Special inspection requirement — Post-installed Anchors
YAZAN YANES
05/28/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
YAZAN YANES
05/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YAZAN YANES
05/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
YAZAN YANES
05/28/2025
Special inspection requirement — Energy Code Compliance Inspections
YAZAN YANES
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
05/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
YAZAN YANES
05/21/2025
Objection resolved — Addressed
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedFJP Mechanical10/20/2026
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/18/2026
DOB NOWStructuralPermit IssuedMaric Mechanical03/18/2026
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/18/2026
DOB NOWSolarPermit IssuedAccord Power03/03/2026
DOB NOWBoiler EquipmentSigned-offFJP Mechanical10/15/2025
DOB NOWPlumbingPermit IssuedFJP Mechanical09/15/2025
DOB NOWSolarPermit IssuedAccord Power04/09/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/17/2025
DOB NOWStructuralPermit IssuedMaric Mechanical03/17/2025
DOB NOWSupport of ExcavationSigned-offMaric Mechanical03/17/2025
DOB NOWStructuralSigned-offMaric Mechanical03/17/2025
DOB NOWConstruction FenceSigned-offMaric Mechanical03/17/2025
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/17/2025
DOB NOWPlumbingSigned-offFJP Mechanical03/13/2025
DOB NOWStructuralSigned-offMaric Mechanical01/08/2025
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical01/06/2025
DOB NOWSupport of ExcavationSigned-offMaric Mechanical01/06/2025
DOB NOWMechanical SystemsSigned-offMaric Mechanical01/06/2025
DOB NOWConstruction FenceSigned-offMaric Mechanical01/06/2025
DOB NOWStructuralPermit IssuedMaric Mechanical01/06/2025
DOB NOWBoiler EquipmentSigned-offFJP Mechanical11/26/2024
DOB NOWPlumbingPermit IssuedFJP Mechanical09/10/2024
DOB NOWSupport of ExcavationSigned-offMaric Mechanical07/31/2024
DOB NOWConstruction FenceSigned-offMaric Mechanical04/04/2024
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/20/2024
DOB NOWStructuralSigned-offMaric Mechanical03/20/2024
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/20/2024
DOB NOWStructuralPermit IssuedMaric Mechanical03/19/2024
DOB NOWPlumbingSigned-offFJP Mechanical03/11/2024
DOB NOWPlumbingSigned-offFJP Mechanical12/11/2023
DOB NOWBoiler EquipmentSigned-offFJP Mechanical10/11/2023
DOB NOWPlumbingPermit IssuedFJP Mechanical09/15/2023
DOB NOWMechanical SystemsPermit IssuedMaric Mechanical08/30/2023
DOB NOWBoiler EquipmentSigned-offFJP Mechanical06/27/2023
DOB NOWStructuralSigned-offMaric Mechanical04/03/2023
DOB NOWStructuralPermit IssuedMaric Mechanical03/31/2023
DOB NOWMechanical SystemsSigned-offMaric Mechanical03/27/2023
DOB NOWConstruction FenceSigned-offMaric Mechanical03/23/2023
DOB NOWGeneral ConstructionPermit IssuedMaric Mechanical03/22/2023
+ 39 more permits on file
1 project · most recent 09/24/2026
Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/24/2026Permit IssuedMaric MechanicalAssociated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
Johnston pftx-300-4-15 Boiler ×14
Ventilation
Loren Cook 100SQN17D 4,200 CFM · Exhaust Fan ×1
Ducts & Piping
N/A NA 1 BTU · Ductwork ×1
2 projects · most recent 09/24/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/24/2026Permit IssuedFJP MechanicalGas, Storm, Water/Sanitary
09/13/2023Permit IssuedFJP MechanicalGas
6 projects · most recent 02/05/2026
General Wiring Lighting
FiledStatusContractorScope
02/05/2026CompleteA.T.J. Electrical CoGeneral Wiring
03/05/2025Permit IssuedAccord Power Electric2 meters, 1 new_meters
06/27/2023CompleteTri-State Electrical & Mechanical IGeneral Wiring
06/23/2023CompleteTri-State Electrical & Mechanical IGeneral Wiring
03/06/2023Permit IssuedTru-Val Electric—
09/01/2022Permit IssuedTru-Val ElectricGeneral Wiring, Lighting
2 projects · most recent 09/24/2026
Steel Concrete
FiledStatusContractorScope
09/24/2026Permit IssuedFJP MechanicalSteel, Concrete
03/03/2023Signed-offMaric Mechanical1 scope_items
1 project · most recent 03/21/2025
FiledStatusContractorScope
03/21/2025Permit IssuedAccord Power130 panels, 70.85 kw, 14,265.64 roof_area_sqft
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/28/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
09/17/2026Fire-Resistant Penetrations and JointsYAZAN YANESspecial
09/17/2026Fenestration and door U-factor and product ratingsYAZAN YANESenergy_progress
09/17/2026Final—progress
09/17/2026Fire-Resistance Rated ConstructionYAZAN YANESprogress
09/17/2026Energy Code Compliance InspectionsYAZAN YANESprogress
11/17/2025Tenant Protection Plan Compliance—special
11/17/2025Structural Steel - DetailsRamnarayan Tirumalaspecial
11/17/2025Excavations - Sheeting, Shoring, and BracingRamnarayan Tirumalaspecial
11/17/2025Structural Steel - WeldingRamnarayan Tirumalaspecial
10/29/2025HVAC-R and service water heating equipmentRamnarayan Tirumalaenergy_progress
10/29/2025Heating SystemsRamnarayan Tirumalaspecial
10/29/2025Tenant Protection Plan Compliance—special
10/29/2025HVAC-R and service water heating system controls—energy_progress
10/29/2025HVAC-R and service water piping design and insulation—energy_progress
10/22/2025Tenant Protection Plan Compliance—special
10/22/2025Excavations - Sheeting, Shoring, and BracingRamnarayan Tirumalaspecial
10/22/2025Structural Steel - DetailsRamnarayan Tirumalaspecial
10/22/2025Structural Steel - WeldingRamnarayan Tirumalaspecial
09/03/2025Tenant Protection Plan ComplianceYAZAN YANESspecial
08/08/2025Tenant Protection Plan ComplianceYAZAN YANESspecial
08/07/2025HVAC-R and service water heating equipmentYAZAN YANESenergy_progress
08/07/2025HVAC-R and service water heating system controlsYAZAN YANESenergy_progress
08/07/2025HVAC-R and service water piping design and insulationYAZAN YANESenergy_progress
05/28/2025Fire-Resistant Penetrations and JointsYAZAN YANESspecial
05/28/2025Post-installed AnchorsYAZAN YANESspecial
Latest 25 of 93.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AT&TTelecom siteRoof
Project Q00341466 Alteration · LOC Issued · 01/08/2021
T-MobileTelecom siteRoof
Project Q00267100 Alteration · Objections · 12/02/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 298 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch23
08/27/2026Q00596416-I1Request digital key ↗
08/25/2026Q07999374-I1Request digital key ↗
08/25/2026Q08036937-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
08/20/2026Q00449518-P2Request digital key ↗
08/20/2026Q00449518-P1Request digital key ↗
08/20/2026Q00449518-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00267100-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/27/2026Q00341466-I1Request digital key ↗
▸Applications & Permits27
▸BISWORK PERMIT APPLICATION13
10/25/2017421096496Open ↗
05/01/2017421383817Open ↗
11/09/2016421383817Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
10/13/2017421096496Open ↗
03/21/2017421096496Open ↗
10/07/2016421383817Open ↗
Showing 3 of 12 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
09/28/2015440153030Open ↗
09/28/2015440153450Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
11/01/2013420860722Open ↗
▸Seals & Professional Certifications103
▸DOB NOWDPL-1: Design Professional Seal & Signature29
10/04/2026Q00449518-A5Open ↗
08/28/2026Q00267100-I1Open ↗
08/27/2026Q00341466-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
10/05/2026Q00449518-A5Open ↗
10/05/2026Q00449518-A5Open ↗
09/01/2026Q00852338-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
10/05/2026Q00449518-A5Open ↗
09/17/2026Q00449518-S8Open ↗
09/01/2026Q00852338-I1Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
06/15/2018421096496Open ↗
10/25/2017421096496Open ↗
07/24/2017421383817Open ↗
Showing 3 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/02/2015440222947Open ↗
07/02/2014440153450Open ↗
07/01/2014440153030Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/02/2015440222947Open ↗
07/02/2014440153450Open ↗
07/01/2014440153030Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/02/2015440222947Open ↗
07/02/2014440153450Open ↗
07/01/2014440153030Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/22/2021440676010Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes2
10/07/2016421383817Open ↗
05/04/2016421321144Open ↗
▸DOB NOWTenant Protection Plan2
08/28/2026Q00267100-I1Open ↗
08/13/2026Q00341466-I1Open ↗
▸BISSTREET TREE CHECKLIST1
09/21/2021440676010Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/27/2026Q00341466-I1Open ↗
08/20/2026Q01179685-I1Open ↗
08/20/2026Q00449518-A4Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/07/2016421383817Open ↗
05/04/2016421321144Open ↗
06/02/2015440222947Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/05/2015420860722Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/18/2008410078295Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
06/15/2018421096496Open ↗
10/25/2017421096496Open ↗
07/24/2017421383817Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
06/15/2018421096496Open ↗
07/24/2017421383817Open ↗
09/19/2016421321144Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
07/01/2014440153030Open ↗
▸Approvals, Objections & Sign-offs66
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
10/04/2026Q00449518-A5Open ↗
08/28/2026Q00267100-I1Open ↗
08/27/2026Q00341466-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)18
10/04/2026Q00449518-A5Open ↗
08/28/2026Q00267100-I1Open ↗
08/13/2026Q00449518-S5Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
06/15/2018421096496Open ↗
07/24/2017421383817Open ↗
09/19/2016421321144Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/25/2017421383817Open ↗
11/07/2016421383817Open ↗
09/19/2016421321144Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/02/2015421096496Open ↗
07/06/2013420860722Open ↗
05/19/2011420354440Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/28/2026Q00267100-I1Open ↗
08/20/2026Q00449518-S1Open ↗
08/13/2026Q00341466-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026Q00852338-I1Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
06/15/2018421096496Open ↗
07/24/2017421383817Open ↗
10/07/2016421383817Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms15
▸BISEFILING JOB APPLICATION COVER SHEET4
06/22/2021440676010Open ↗
06/02/2015440222947Open ↗
07/02/2014440153450Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
10/07/2016421383817Open ↗
05/04/2016421321144Open ↗
05/02/2015421096496Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAI1 Form4
08/13/2026Q00449518-S5Open ↗
08/13/2026Q00449518-A4Open ↗
08/13/2026Q00449518-S2Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
09/21/2021440676010Open ↗
10/25/2017421096496Open ↗
10/25/2017421096496Open ↗
▸Other Documents6
▸BISFEE EXEMPTION DOCUMENTATION2
07/02/2014440153450Open ↗
07/01/2014440153030Open ↗
▸DOB NOWInspector's Report2
08/13/2026Q00449518-A4Open ↗
08/13/2026Q00449518-S5Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/17/2015440153030Open ↗
▸DOB NOWWaiver Document1
08/13/2026Q00449518-S1Open ↗