Elevator cooperative
34-21 78 STREET
QUEENS · BIN 4029137
💬 Discuss this project
1939Year Built
6Stories
D4Building Class
R7-1Zoning
65,000 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized1 Open Violation ▸FDNY Report ↗
Elevator cooperative · Owner of record: DUNOLLY OWNERS CORP · 21,500 sf lot · 3.02 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 10 docs
Cellar3p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES1509/01/2026
SPRING SCAFFOLDING LLC703/22/2026
DUNOLLY OWNER'S CORP.2603/22/2026
CANTOR REALTY203/22/2026
DUNNOLY OWNERS CORP103/21/2026
C O AKAM ASSOCIATES303/21/2026
DUNOLLY GARDENS MANAGMENT OFFICE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP109/05/2025
LAWLESS & MANGIONE108/18/2025
LITTLE BOXES STUDIO ARCHITECT202/05/2024
MAYTA + SEBASTIAN ARCHITECTURE DPC202/22/2022
TOHFAZ UDDIN PE PC105/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
EMMANUEL RAY BASILE203/21/2026
EAST COAST EXPEDITING203/21/2026
SPRING SCAFFOLDING LLC203/21/2026
LAWLESS AND MANGIONE103/21/2026
LAWLESS MANGIONE ARCHITECT EN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor309/09/2026
M&A CONTRACTING SERVICESGeneral Contractor303/21/2026
AM&G WATERPROOFING LLCGeneral Contractor108/26/2026
NEW YORK PLBG-HTG-COOLINGPlumbing107/08/2026
APPOLINAIRE LAUTUREElectrical103/21/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
APRILAKIS, EVANGELINAElectrical103/21/2026
BROWN, JERMAINEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN INTEGRATIONS LLC7993110/02/2025
SPECIAL TESTING & CONSULT1688108/18/2025
MAYTA + SEBASTIAN ARCHITE5890202/22/2022
Building Lifecycle
All (102)Filed (8)Permit Issued (9)Signed Off (4)Violation (59)Inspection (7)Objection (4)Special Inspection (11)
09/08/2026
Permit issued — Sidewalk Shed
Q01276757-I1-SH
08/31/2026
Permit issued — Suspended Scaffold
Q01288416-I1-SC
08/25/2026
Permit issued — General Construction
Q01218786-I1-GC
10/08/2025
Permit issued — Suspended Scaffold
Q01288416-I1-SC
10/02/2025
Filed — Alteration
Q01288416-I1
09/08/2025
Permit issued — Sidewalk Shed
Q01276757-I1-SH
09/05/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND STORAGE AREAS ON TOP AS PER PLANS. IN COMPLAINCE WITH CHAPTER 33 OF NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q01276757-I1
08/18/2025
Filed — Alteration
Q01218786-I1
04/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Kenneth Santelli
04/30/2025
Special inspection requirement — Final
Kenneth Santelli
04/30/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
04/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
04/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
09/03/2024
Signed off — Alteration
Removal of existing Kitchen and renovation of bathroom in apt 2G. No change in occupancy, use, or egress.
Q00986698-S1
09/03/2024
Signed off — Alteration
Removal of existing Kitchen and renovation of bathroom in apt 2G. No change in occupancy, use, or egress.
Q00986698-I1
05/29/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2024
Permit issued — Plumbing
Q00986698-S1-PL
03/13/2024
Permit issued — General Construction
Q00986698-I1-GC
02/14/2024
Objection resolved — Addressed
02/14/2024
Objection resolved — Addressed
02/12/2024
Objection raised — Scope
02/12/2024
Objection raised — Other
02/05/2024
Filed — Alteration
Removal of existing Kitchen and renovation of bathroom in apt 2G. No change in occupancy, use, or egress.
Q00986698-S1
02/05/2024
Filed — Alteration
Removal of existing Kitchen and renovation of bathroom in apt 2G. No change in occupancy, use, or egress.
Q00986698-I1
01/07/2024
Special inspection requirement — Final
RENEE FERGUSON
01/07/2024
Special inspection requirement — Lighting controls
RENEE FERGUSON
01/07/2024
Special inspection requirement — Lighting in dwelling units
RENEE FERGUSON
08/18/2022
Signed off — Alteration
Plumbing work associated with new laundry in cellar of existing building. No change in occupancy, use or egress.
Q00546589-I1
03/25/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/22/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/11/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/11/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2022
Permit issued — Plumbing
Q00546589-I1-PL
03/03/2022
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, closed)
A
02/22/2022
Filed — Alteration CO
Adding new laundry room to cellar of existing building. Plumbing work filed under separate DOB Now application.
Q00546644-I1
02/18/2022
Filed — Alteration
Plumbing work associated with new laundry in cellar of existing building. No change in occupancy, use or egress.
Q00546589-I1
02/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Raul Mayta
06/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Raul Mayta
07/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/10/2019
Signed off — Alteration
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APPLICATION.
Q00150737-I1
07/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/10/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/23/2019
Filed — Alteration
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN NO CHANGE IN USE, OCCUPANCY OF EGRESS UNDER THIS APPLICATION.
Q00150737-I1
05/23/2019
Permit issued — Sidewalk Shed
Q00150737-I1-SH
04/04/2019
Special inspection requirement — Final
MD TOHFAZ UDDIN
06/04/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/04/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/02/2017
Violation issued (ECB, closed)
Elevators
11/02/2017
Violation issued (ECB, closed)
Elevators
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/10/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/10/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/10/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/13/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/13/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL09/08/2026
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC08/31/2026
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC08/25/2026
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC10/08/2025
DOB NOWSidewalk ShedPermit IssuedDYNAMIX SCAFFOLD GROUP LL09/08/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP03/13/2024
DOB NOWGeneral ConstructionSigned-offM&A CONTRACTING SERVICES03/13/2024
DOB NOWPlumbingSigned-offNEW YORK PLBG-HTG-COOLING03/03/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/23/2019
BISOTISSUEDSKYLINE RESTORATION INC03/27/2019
BISOTISSUEDSKYLINE RESTORATION INC02/05/2019
BISOTISSUEDFULL CIRCLE PLUMBING CORP03/10/2016
BISOTISSUEDSKYLINE RESTORATION INC06/15/2015
BISOTISSUEDSKYLINE RESTORATION INC03/24/2015
BISEQISSUEDSPRING SCAFFOLDING LLC10/17/2014
BISEQISSUEDXINOS CONSTRUCTION CORP02/22/2011
BISOTISSUEDXINOS CONSTRUCTION CORP02/18/2011
BISOTISSUEDXINOS CONSTRUCTION CORP09/03/2010
BISEQISSUEDXINOS CONSTRUCTION CORP07/30/2010
BISOTISSUEDSURFACE RX,INC09/30/2003
BISOTISSUEDCLEVELAND SITEWORK INC02/08/2000
BISEQISSUEDCLEVELAND SITEWORK INC01/25/2000
BISPLISSUEDOCEANVIEW PLG CORP11/05/1990
BISFSISSUEDABILENE INC.11/05/1990
4 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedL&B ELEC'L INTERNATIONALGeneral Wiring
12/03/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
03/22/2024CompleteHMA ELECTRIC, LLCGeneral Wiring
04/04/2019CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 09/05/2025
Sidewalk Shed
FiledStatusContractorScope
09/05/2025Permit IssuedDYNAMIX SCAFFOLD GROUP LLSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/30/2025Energy Code Compliance InspectionsKenneth Santelliprogress
04/30/2025FinalKenneth Santelliprogress
04/30/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
04/30/2025Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
04/30/2025Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
01/07/2024FinalRENEE FERGUSONprogress
01/07/2024Lighting controlsRENEE FERGUSONenergy_progress
01/07/2024Lighting in dwelling unitsRENEE FERGUSONenergy_progress
02/18/2022Fire-Resistant Penetrations and JointsRaul Maytaspecial
06/24/2021Fire-Resistant Penetrations and JointsRaul Maytaspecial
04/04/2019FinalMD TOHFAZ UDDINprogress
▾Documents — 169 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/26/2026Q00546589-I1Request digital key ↗
08/26/2026Q00546644-I1Request digital key ↗
08/23/2026Q00986698-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00150737-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION15
08/06/2021421651992Open ↗
05/13/2021421937747Open ↗
06/10/2019421937747Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION8
02/06/2019421651992Open ↗
03/16/2016421300210Open ↗
04/06/2015421015939Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLPC Approval/Permit5
08/13/2026Q00986698-I1Open ↗
08/13/2026Q00546589-I1Open ↗
08/13/2026Q00546644-I1Open ↗
Showing 3 of 5 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/22/2015440177675Open ↗
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
07/22/2019421937747Open ↗
06/10/2019421937747Open ↗
01/25/2019421651992Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026Q00150737-I1Open ↗
08/26/2026Q00546589-I1Open ↗
08/26/2026Q00546644-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00150737-I1Open ↗
08/29/2026Q01218786-I1Open ↗
08/29/2026Q01218786-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026Q01218786-I1Open ↗
08/26/2026Q00546644-I1Open ↗
08/26/2026Q00546589-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/15/2016421300210Open ↗
10/16/2014440177675Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/15/2016421300210Open ↗
07/30/2010420233036Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/16/2014440177675Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/30/2010420233036Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/16/2014440177675Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
05/13/2021421937747Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/10/2019421937747Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes3
06/10/2019421937747Open ↗
06/08/2019421937747Open ↗
07/10/2018421651992Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/04/2015421015939Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/06/2015421015939Open ↗
▸BISSTREET TREE CHECKLIST1
06/10/2019421937747Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00546644-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026Q00546589-I1Open ↗
08/26/2026Q00546644-I1Open ↗
08/13/2026Q00986698-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
06/10/2019421937747Open ↗
06/08/2019421937747Open ↗
07/10/2018421651992Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/02/2010420228881Open ↗
07/30/2010420233036Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/04/2015421015939Open ↗
▸BISASBESTOS INSPECTION REPORT1
10/02/2010420228881Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/10/2019421937747Open ↗
06/08/2019421937747Open ↗
03/15/2016421300210Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
01/06/2017421015939Open ↗
03/23/2016421300210Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/16/2014440177675Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/10/2022420233036Open ↗
03/15/2022420233036Open ↗
▸BISMASONRY1
06/16/2022421651992Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
06/14/2022420233036Open ↗
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
07/15/2022421651992Open ↗
07/08/2022421651992Open ↗
06/24/2022420233036Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
07/10/2018421651992Open ↗
05/16/2016421300210Open ↗
05/16/2016421300210Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS APPROVAL4
07/19/2019421937747Open ↗
01/06/2017421015939Open ↗
04/25/2016421300210Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/15/2016421300210Open ↗
08/01/2014421015939Open ↗
07/30/2010420233036Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF2
07/13/2022421651992Open ↗
06/13/2022420233036Open ↗
▸BISSHED LETTER1
02/23/2011420233036Open ↗
▸BISFINAL1
06/16/2022421651992Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
04/21/2022421651992Open ↗
05/27/2021421937747Open ↗
06/10/2019421937747Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/16/2022421651992Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
02/04/2015421015939Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET6
06/10/2019421937747Open ↗
07/10/2018421651992Open ↗
03/15/2016421300210Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
04/21/2022421651992Open ↗
05/27/2021421937747Open ↗
07/02/2015421015939Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/16/2014440177675Open ↗
▸Other Documents3
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
11/27/2018421651992Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01288416-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01288416-I1Open ↗