4 Open Violations 0 unresolved · 4 paperwork only▸
ECB04/28/200520050816YINSTALLATION OF STEPS AND ENTRANCE DOOR TO CELLAR. REMEDY: COMPLY WITHTHE ORDER.Nothing owed — awaiting certificate of correction
ECB12/14/2004FAILURE TO COMPLY WITH AN ORDER OF THE DEPARTMENT TO CORRECT AND CERTIFY CORRECTIONS FOR THE VIOLATING CONDITION OF VIO # 34448905L OF 8/21/04, WORK W/O PERMIT: INSTALLATION OF ENTRANCE STEPS AND DOOR THROUGHNothing owed — awaiting certificate of correction
ECB08/21/2004WORK W/OUT PERMIT.WORK NOTED:AT FRONT OF PREMISES EXCAVATED SOIL AND CUT THROUGH FOUNDATION AND CREATED ENTRANCE TO CELLAR WITH RESIDENTIAL DOOR APPROX 32X80 INCHES ENTRANCE HAS 5 STEPS APPROX 3-FEET WIDE BYNothing owed — awaiting certificate of correction
ECB07/08/2004WORK WITHOUT PEMRIT WORK NOTED 20'X 8' MASONRY BLOCK SHED ERECTED W/ WOOD FRAMED ROOF WINDOW AND DOOR INSTALLED ON SHED AT REAR YARD CONCRETE SLAB POURED AT REAR YO APPROX 20' X 30' REMEDY:OBTAIN PERMIT OR RESTNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 0.75 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.