Elevator apt, fireproof without stores
Latimer Gardens (NYCHA)
34-25 LINDEN PLACE · BIN 4443410
💬 Discuss this project
1970Year Built
10Stories
D3Building Class
R6Zoning
352,070 sfGross Floor Area
434Units
LL97 Covered6 Open Violations 2 unresolved · 4 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 167,100 sf lot · 2.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 13 docs
Floor 11p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA1008/29/2026
NEW YORK CITY HOUSING AUTHORITY604/09/2026
MYC HOUSING AUTHORITY103/22/2026
NEW YORK CITY HOUSING203/22/2026
NYC HOUSING AUTHORITY1203/21/2026
CITY OF NY PARKS RECREATION203/21/2026
N Y C DEPT OF GENERAL SERVICES103/21/2026
N Y CITY HOUSING AUTHORITY903/21/2026
HOUSING AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JRCRUZ CORP109/08/2025
HAZEN AND SAWYER, D.P.C.408/20/2025
BKH ARCHITECT, PLLC212/27/2022
MATTHEW REZKALLO, ARCHITECT208/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HAZEN & SAWYER, P.C.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNIQUE MECHANICAL CORPGeneral Contractor303/21/2026
JRCRUZ CORPGeneral Contractor204/09/2026
BOILERMAKER LOCAL 5Electrical103/21/2026
CSI SEC & ELECTRIC INCElectrical103/22/2026
LAMPIRIS, DElectrical103/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
AMMITZBOLL, PAULElectrical103/21/2026
MPC PLUMBING & HEATING INCPlumbing107/08/2026
BAKER, WElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106208/20/2025
BKH ARCHITECT, PLLC6255212/27/2022
Building Lifecycle
All (70)Filed (10)Permit Issued (5)Signed Off (4)Facade (FISP) (9)Violation (23)Inspection (2)Objection (2)Special Inspection (15)
07/07/2026
Permit issued — Suspended Scaffold
Q01412676-I1-SC
06/23/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Q01412676-I1
04/15/2026
Violation issued (FDNY_NOV, closed)
04/15/2026
Violation issued (FDNY_NOV, closed)
02/10/2026
Signed off — Alteration
Support of excavation for the installation of subsurface stormwater chambers.
Q00793170-I1
02/10/2026
Signed off — Alteration
Support of excavation for the installation of subsurface stormwater chambers.
Q00793170-S1
02/02/2026
Violation issued (FDNY_ORDER, closed)
01/07/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Signed off — Alteration
Support of excavation for the installation of subsurface stormwater chambers.
Q00793170-S2
12/08/2025
Violation issued (FDNY_NOV, closed)
11/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/06/2025
Permit issued — Support of Excavation
Q00793170-S2-SE
10/21/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Permit issued — Plumbing
Q00793170-S1-PL
10/02/2025
Violation issued (ECB, open)
Construction
10/02/2025
Objection resolved — Addressed
10/01/2025
Objection raised — Admin
09/08/2025
Filed — Alteration
Support of excavation for the installation of subsurface stormwater chambers.
Q00793170-S2
09/03/2025
Permit issued — General Construction
Q00793170-I1-GC
08/25/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
08/25/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
GEORGE GHEBRYAL
08/20/2025
Filed — Alteration
Support of excavation for the installation of subsurface stormwater chambers.
Q00793170-P1
08/20/2025
Filed — Alteration
Support of excavation for the installation of subsurface stormwater chambers.
Q00793170-P2
08/12/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
GEORGE GHEBRYAL
08/12/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
04/03/2025
Violation issued (FDNY_NOV, closed)
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/30/2023
Violation issued (FDNY_NOV, closed)
12/30/2022
Signed off — Alteration
DIRECT REPLACEMENT OF (5) PACKAGE HVAC UNITS FOR HEATING & COOLING OF THE FIRST FLOOR NYCHA - LATIMER GARDENS BUILDING #3 SELF HELP COMMUNITY CENTER
Q00551850-I1
12/29/2022
Special inspection requirement — Mechanical Systems
Brandon Hamchuk
12/29/2022
Special inspection requirement — Preliminary
Brandon Hamchuk
12/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Brandon Hamchuk
12/29/2022
Special inspection requirement — Duct leakage testing, insulation and design
Brandon Hamchuk
12/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
Brandon Hamchuk
12/29/2022
Special inspection requirement — Maintenance information
Brandon Hamchuk
12/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Brandon Hamchuk
12/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
Brandon Hamchuk
12/29/2022
Special inspection requirement — Final
Brandon Hamchuk
12/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brandon Hamchuk
12/27/2022
Filed — Alteration
DIRECT REPLACEMENT OF (5) PACKAGE HVAC UNITS FOR HEATING & COOLING OF THE FIRST FLOOR NYCHA - LATIMER GARDENS BUILDING #3 SELF HELP COMMUNITY CENTER
Q00551850-P1
12/06/2022
Filed — Alteration
Support of excavation for the installation of subsurface stormwater chambers.
Q00793170-S1
11/30/2022
Filed — Alteration
Support of excavation for the installation of subsurface stormwater chambers.
Q00793170-I1
07/29/2021
Permit issued — Mechanical Systems
Q00551850-I1-MS
07/23/2021
Filed — Alteration
DIRECT REPLACEMENT OF (5) PACKAGE HVAC UNITS FOR HEATING & COOLING OF THE FIRST FLOOR NYCHA - LATIMER GARDENS BUILDING #3 SELF HELP COMMUNITY CENTER
Q00551850-I1
06/16/2021
Violation issued (ECB, open)
Construction
08/06/2019
Filed — No Work
Q00146785-I1
08/06/2019
Filed — No Work
Q00138551-I1
03/06/2019
Special inspection requirement — Public Assembly Emergency Lighting
Matthew Rezkallo
08/23/2017
Cycle 8 facade report submitted
08/09/2017
Cycle 8 facade report signed — SWARMP
06/30/2017
Cycle 8 facade inspection completed
11/28/2016
Violation issued (HPD, closed)
I
10/20/2015
Violation issued (HPD, closed)
I
03/04/2015
Violation issued (HPD, closed)
I
12/31/2012
Cycle 7 facade report submitted
12/27/2012
Cycle 7 facade report signed — SAFE
11/14/2012
Cycle 7 facade inspection completed
04/10/2008
Cycle 6 facade report submitted
04/02/2008
Cycle 6 facade report signed — SAFE
03/18/2008
Cycle 6 facade inspection completed
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S07/07/2026
DOB NOWSupport of ExcavationSigned-offJRCRUZ CORP11/06/2025
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN10/03/2025
DOB NOWGeneral ConstructionSigned-offJRCRUZ CORP09/03/2025
DOB NOWMechanical SystemsSigned-offUNIQUE MECHANICAL CORP07/29/2021
BISOTISSUEDACCORD POWER INC11/29/2023
BISPLISSUEDBOYD MECHANICAL LLC11/10/2020
BISOTISSUEDJEMCO ELECTRICAL CONT INC10/07/2020
BISEQISSUEDTECHNICO CONSTRUCTION02/22/2012
BISEQISSUEDTECHNICO CONSTRUCTION10/28/2011
BISEQISSUEDTHREE GENERATIONS CONTR08/29/2011
BISEQISSUEDB & S RESTORATION INC08/02/2010
BISMHISSUEDACS SYSTEM ASSOCIATES INC.05/10/2006
BIS—ISSUEDMASTER GENERAL CONTRACTORS01/21/2006
BISPLISSUEDPARKSET PLUMBING CO INC11/29/2005
BISPLISSUEDPARKSET PLUMBING CO INC10/27/2005
BISPLISSUEDPARKSET PLUMBING CO INC09/16/2005
BIS—ISSUEDMASTER GENERAL CONTRACTORS02/17/2005
BISPLISSUEDPARKSET PLUMBING CO INC10/15/2004
BISPLISSUEDPARKSET PLUMBING CO INC08/02/2004
BISFPISSUEDSENTINEL FIRE CONTROL INC02/03/2004
BIS—ISSUEDMASTER GENERAL CONTRACTORS01/17/2004
BISOTISSUEDG & L PLUMBING CO INC11/03/2003
BISPLISSUEDG & L PLUMBING CO, INC07/30/2003
BISPLISSUEDPARKSET PLUMBING CO INC05/06/2003
BIS—ISSUEDMASTER GENERAL CONTRACTORS02/07/2003
BIS—ISSUEDMASTER GENERAL CONTRACTORS03/08/2002
BISPLISSUEDPARKSET PLUMBING CO INC04/05/2001
BIS—ISSUEDMASTER GENERAL CONTRACTORS02/01/2001
BISOTISSUEDLITHOS CONSTRUCTION LTD12/28/2000
BISPLISSUEDPARKSET PLUMBING CO INC03/30/2000
BIS—ISSUEDMASTER GENERAL CONTRACTORS03/14/2000
BISPLISSUEDTRATAROS PLUMBING/ACE CONSTRUCTI04/24/1997
BISOTISSUEDTRATAORS PLUMBING04/24/1997
BISOTISSUEDPHILANGE CONSTRUCTION CORP.04/21/1992
BISMHISSUEDDEPENDABLE CONTRACTORS OF NY04/10/1991
BISOTISSUEDPHILANGE CONSTRUCTION CORP.10/29/1990
2 projects · most recent 12/31/2023
FiledStatusContractorScope
12/31/2023Permit IssuedPOWER SURGE ELECTRIC, INC2 meters, 1 new_meters
02/19/2022CompleteCSI SEC & ELECTRIC INC—
1 project · most recent 06/23/2026
FiledStatusContractorScope
06/23/2026Permit IssuedSTRUCTURAL PRESERVATION S—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/07/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/25/2025FinalGEORGE GHEBRYALprogress
08/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationGEORGE GHEBRYALspecial
08/12/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationGEORGE GHEBRYALspecial
08/12/2025FinalGEORGE GHEBRYALprogress
12/29/2022Mechanical SystemsBrandon Hamchukspecial
12/29/2022PreliminaryBrandon Hamchukprogress
12/29/2022Energy Code Compliance InspectionsBrandon Hamchukprogress
12/29/2022Duct leakage testing, insulation and designBrandon Hamchukenergy_progress
12/29/2022HVAC-R and service water heating equipmentBrandon Hamchukenergy_progress
12/29/2022Maintenance informationBrandon Hamchukenergy_progress
12/29/2022HVAC-R and service water piping design and insulationBrandon Hamchukenergy_progress
12/29/2022HVAC-R and service water heating system controlsBrandon Hamchukenergy_progress
12/29/2022FinalBrandon Hamchukprogress
12/29/2022Fire-Resistant Penetrations and JointsBrandon Hamchukspecial
03/06/2019Public Assembly Emergency LightingMatthew Rezkalloprogress
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
08/25/2026Q00551850-I1Request digital key ↗
08/25/2026Q00551850-P1Request digital key ↗
08/19/2026Q00793170-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/28/2026Q00146785-I1Request digital key ↗
08/28/2026Q00138551-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
11/29/2023440807138Open ↗
12/03/2020421919918Open ↗
10/07/2020421919918Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
11/24/2023440807138Open ↗
08/20/2019421919918Open ↗
06/18/2019421919918Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026Q00146785-I1Open ↗
08/19/2026Q00793170-S1Open ↗
08/19/2026Q00793170-S2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/18/2019421919918Open ↗
12/18/2013420499044Open ↗
10/31/2011420499044Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026Q00793170-I1Open ↗
08/28/2026Q00138551-I1Open ↗
08/23/2026Q00551850-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
10/31/2011420499044Open ↗
08/03/2010420233704Open ↗
05/29/2010420194596Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/31/2011420499044Open ↗
08/03/2010420233704Open ↗
05/29/2010420194596Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026Q00793170-I1Open ↗
08/23/2026Q00551850-I1Open ↗
08/23/2026Q00793170-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/24/2023440807138Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/24/2023440807138Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/18/2019421919918Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
11/29/2023440807138Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/24/2023440807138Open ↗
10/22/2020421919918Open ↗
09/22/2020421919918Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
10/31/2011420499044Open ↗
08/03/2010420233704Open ↗
05/29/2010420194596Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/22/2011420473384Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/24/2023440807138Open ↗
05/22/2020421919918Open ↗
05/22/2020421919918Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/18/2019421919918Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/24/2023440807138Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00551850-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/24/2023440807138Open ↗
05/22/2020421919918Open ↗
05/22/2020421919918Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/28/2026Q00146785-I1Open ↗
08/16/2026Q01412676-I1Open ↗
08/13/2026Q00793170-S2Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/22/2020421919918Open ↗
06/18/2019421919918Open ↗
02/23/2012420499044Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
10/31/2011420499044Open ↗
08/22/2011420473384Open ↗
08/03/2010420233704Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/18/2013420499044Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/24/2023440807138Open ↗
06/18/2019421919918Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET5
06/18/2019421919918Open ↗
10/31/2011420499044Open ↗
08/22/2011420473384Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
11/24/2023440807138Open ↗
05/22/2020421919918Open ↗
09/19/2019421919918Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/24/2023440807138Open ↗
▸BISBOROUGH INTAKE FORM1
12/03/2020421919918Open ↗
▸Other Documents3
▸DOB NOWAlternate Plan 12
08/28/2026Q00146785-I1Open ↗
08/28/2026Q00138551-I1Open ↗
▸DOB NOWIRA Certification1
08/16/2026Q01412676-I1Open ↗