← Back
Miscellaneous hospital / health care facility
34-25 VERNON BOULEVARD
QUEENS · BIN 4003826
💬 Discuss this project
1975Year Built
5Stories
I9Building Class
R5Zoning
47,713 sfGross Floor Area
1Units
LL97 Covered24 Open Violations ▸
Miscellaneous hospital / health care facility · Owner of record: PHOENIX HOUSES OF LONG ISLAND, INC. · 30,000 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar1p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PHOENIX HOUSE NY1107/08/2026
TRIERA CONTRACTING407/08/2026
PHOENIX HOUSES OF LONG ISLAND, INC.103/22/2026
OWNER OF 34-25 VERNON BLV203/22/2026
PHOENIX HOUSE FOUNDATION, INC.1603/21/2026
PHEONIX HOUSE FOUNDATION303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC106/12/2024
ANDREW KATZ ENGINEERS606/14/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B&B MECH PLBG & HTG LLCPlumbing407/08/2026
TRIERA CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087304/17/2023
Building Lifecycle
All (88)Filed (6)Permit Issued (5)Signed Off (3)Violation (60)Inspection (4)Special Inspection (10)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2025
Violation issued (HPD, closed)
C
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/04/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01058300-I1
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01058300-I1
06/12/2024
Permit issued — Sidewalk Shed
Q01058300-I1-SH
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Signed off — Alteration
DIRECT REPLACEMENT OF (2) INDIRECT HOT WATER STORAGE TANKS, (1) WATER MAKER AND (1) BOILER. RECONNECT TO EXISTING SUPPLY RETURN PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. BOILER FILED UNDER Q00764996.
Q00766052-I1
06/20/2023
Signed off — Alteration
Q00844257-I1
06/14/2023
Filed — Alteration
DIRECT REPLACEMENT OF (2) INDIRECT HOT WATER STORAGE TANKS, (1) WATER MAKER AND (1) BOILER. RECONNECT TO EXISTING SUPPLY RETURN PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. BOILER FILED UNDER Q00764996.
Q00766052-P2
06/05/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/01/2023
Permit issued — Boiler Equipment
Q00844257-I1-BE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/17/2023
Filed — Alteration
Q00844257-I1
04/05/2023
Permit issued — Boiler Equipment
Q00764996-I1-BE
03/16/2023
Special inspection requirement — Tenant Protection Plan Compliance
David Katz
03/15/2023
Special inspection requirement — Maintenance information
David Katz
03/15/2023
Special inspection requirement — Heating Systems
David Katz
03/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
02/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2023
Filed — Alteration
DIRECT REPLACEMENT OF (2) INDIRECT HOT WATER STORAGE TANKS, (1) WATER MAKER AND (1) BOILER. RECONNECT TO EXISTING SUPPLY RETURN PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. BOILER FILED UNDER Q00764996.
Q00766052-P1
02/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2023
Special inspection requirement — Heating Systems
David Katz
02/02/2023
Special inspection requirement — Maintenance information
David Katz
02/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
01/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2022
Permit issued — Boiler Equipment
Q00764996-I1-BE
07/14/2022
Permit issued — Plumbing
Q00766052-I1-PL
07/07/2022
Filed — Alteration
DIRECT REPLACEMENT OF (2) INDIRECT HOT WATER STORAGE TANKS, (1) WATER MAKER AND (1) BOILER. RECONNECT TO EXISTING SUPPLY RETURN PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. BOILER FILED UNDER Q00764996.
Q00766052-I1
07/07/2022
Filed — Alteration
DIRECT REPLACEMENT OF EXISTING (2) HOT WATER BOILERS ON EXISTING ROUGHING.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00764996-I1
06/30/2022
Special inspection requirement — Maintenance information
David Katz
06/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
David Katz
06/30/2022
Special inspection requirement — Heating Systems
David Katz
06/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/17/2020
Violation issued (HPD, closed)
C
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2020
Violation issued (ECB, closed)
Elevators
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/12/2019
Violation issued (ECB, closed)
Elevators
09/20/2018
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/16/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/16/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC06/12/2024
DOB NOWBoiler EquipmentSigned-offTARGET PIPING NY LLC05/01/2023
DOB NOWBoiler EquipmentPermit IssuedTARGET PIPING NY LLC04/05/2023
DOB NOWBoiler EquipmentPermit IssuedTARGET PIPING NY LLC07/14/2022
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC07/14/2022
BISPLISSUEDL&J PLG & HTG CO OF NY IN12/20/2019
BISFPISSUEDNY FIRETECH INC11/22/2019
BISPLISSUEDUNITED ONE MECHANICAL INC11/21/2019
BISMHISSUEDANR MECHANICAL CORP04/08/2016
BISPLISSUEDEAST COAST MECHANICAL LLC09/09/2014
BISOTISSUEDMETROPOLITAN MECHANICAL C01/03/2014
BISPLISSUEDEAST COAST MECHANICAL LLC08/14/2012
BISFPISSUEDALL SAFE FIRE PROTECT09/13/2011
BISPLISSUEDNEW YORK HEATING CORP07/14/2010
BISPLISSUEDNEW YORK HEATING CORP03/12/2009
BISBLISSUEDNEW YORK HEATING CORP03/12/2009
BISSPISSUEDACCURATE MECHANICAL INC12/28/2004
BISOTISSUEDLAPIETRA CONTRACTING CORP09/21/2004
BISFBISSUEDAPPROVED OIL CO OF BKLYN07/19/2004
BISMHISSUEDLAPIETRA CONTRACTING CORP07/17/2003
BISOTISSUEDPHOENIX HOUSE FOUNDATION INC.02/15/2001
BISPLISSUEDG.N.T. MECHANICAL LLC02/15/2001
BISMHISSUEDPHOENIX HOUSE FOUNDATION INC.02/15/2001
BISMHISSUEDPHIENIX HOUSE FOUNDATION INC.07/28/1993
BISFBISSUEDBURNSIDE O.B SERVICE10/27/1992
BISBLISSUEDBURNSIDE O.B SERVICE10/23/1992
BIS—ISSUEDPHOENIX HOUSE FOUNDATION03/20/1990
2 jobs · most recent 06/12/2024
Boiler Controls
FiledStatusContractorScope
06/12/2024CompleteRICHARD NEU—
11/17/2022CompleteSMALLS MECH & ELECL SVCBoiler Controls
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/05/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/16/2023Tenant Protection Plan ComplianceDavid Katzspecial
03/15/2023Maintenance informationDavid Katzenergy_progress
03/15/2023Heating SystemsDavid Katzspecial
03/15/2023HVAC-R and service water heating equipmentDavid Katzenergy_progress
02/02/2023Heating SystemsDavid Katzspecial
02/02/2023Maintenance informationDavid Katzenergy_progress
02/02/2023HVAC-R and service water heating equipmentDavid Katzenergy_progress
06/30/2022Maintenance informationDavid Katzenergy_progress
06/30/2022HVAC-R and service water heating equipmentDavid Katzenergy_progress
06/30/2022Heating SystemsDavid Katzspecial
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00764996-P1Request digital key ↗
08/26/2026Q00764996-I1Request digital key ↗
08/25/2026Q00766052-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION18
12/20/2019402408417Open ↗
08/20/2019421393682Open ↗
08/19/2019421393682Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION15
12/27/2019402408417Open ↗
12/04/2019402408417Open ↗
11/22/2019402408417Open ↗
Showing 3 of 15 on file for this type
▸BISPLACE OF ASSEMBLY6
08/19/2019421393682Open ↗
08/07/2019421393682Open ↗
12/30/2016421393682Open ↗
Showing 3 of 6 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
04/27/2020402408417Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/08/2016421393682Open ↗
▸Seals & Professional Certifications36
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
12/08/2016421393682Open ↗
06/10/2016440299151Open ↗
05/26/2016440167052Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00764996-I1Open ↗
08/25/2026Q00766052-P1Open ↗
08/25/2026Q00766052-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
08/07/2019421393682Open ↗
12/08/2016421393682Open ↗
04/05/2016440299151Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026Q00844257-I1Open ↗
09/23/2026Q00764996-I1Open ↗
09/23/2026Q00844257-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q00844257-I1Open ↗
09/23/2026Q00844257-I1Open ↗
09/23/2026Q00764996-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/08/2014420936330Open ↗
08/29/2012420611859Open ↗
03/11/2009410234027Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/21/2012420611859Open ↗
03/11/2009410234027Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/05/2016440299151Open ↗
09/05/2014440167052Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/05/2016440299151Open ↗
09/05/2014440167052Open ↗
▸Trade Schedules & Equipment17
▸BISSELF-CERT PLUMBING NOTICE5
02/19/2015440167052Open ↗
02/19/2015440167052Open ↗
11/28/2012420611859Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
09/05/2014440167052Open ↗
08/21/2012420611859Open ↗
08/13/2011420374320Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
04/28/2014420936330Open ↗
04/28/2014420936330Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
05/05/2009410234027Open ↗
03/11/2009410234027Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
02/19/2015440167052Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
02/29/2012420341801Open ↗
▸BISWATER METER PERMIT : DEP-METER1
02/19/2015440167052Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/28/2014420936330Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
03/11/2009410234027Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
04/05/2016440299151Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026Q00764996-I1Open ↗
08/25/2026Q00766052-P1Open ↗
08/25/2026Q00766052-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/05/2014440167052Open ↗
01/08/2014420936330Open ↗
08/21/2012420611859Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
07/01/2011420374320Open ↗
04/21/2011420341801Open ↗
03/11/2009410234027Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/10/2016440299151Open ↗
05/26/2016440167052Open ↗
03/05/2014420936330Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
06/10/2016440299151Open ↗
05/26/2016440167052Open ↗
03/05/2014420936330Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
04/05/2016440299151Open ↗
09/05/2014440167052Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/05/2016440299151Open ↗
09/05/2014440167052Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/07/2016440299151Open ↗
04/05/2016440299151Open ↗
09/05/2014440167052Open ↗
▸Approvals, Objections & Sign-offs19
▸BISLETTERS - SUPPORTING DOCUMENTATION8
12/20/2019402408417Open ↗
02/15/2019421393682Open ↗
01/12/2017421393682Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
12/08/2016421393682Open ↗
08/21/2012420611859Open ↗
06/30/2011420374320Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/10/2016440299151Open ↗
05/26/2016440167052Open ↗
04/28/2014420936330Open ↗
▸BISSUPERSEDING LETTER2
12/27/2019402408417Open ↗
11/22/2019402408417Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q01058300-I1Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
06/10/2016440299151Open ↗
05/26/2016440167052Open ↗
04/05/2016440299151Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET5
01/08/2014420936330Open ↗
08/29/2012420611859Open ↗
08/13/2011420374320Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
12/20/2019402408417Open ↗
08/20/2019421393682Open ↗
08/19/2019421393682Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/05/2016440299151Open ↗
09/05/2014440167052Open ↗
▸BISBOROUGH INTAKE FORM2
03/06/2019421393682Open ↗
12/29/2018402408417Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/05/2014440167052Open ↗