ECB09/01/2007WORK W/O PERMIT: INSTALLED WATER & WASTE LINES FOR A (3) PC BATH SINK,TOILET,SHOWER. REMEDY: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
Three families · 2,600 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.