← Back
Five to six families
34-48 30 STREET
QUEENS · BIN 4007363
💬 Discuss this project
1923Year Built
3Stories
C2Building Class
R5Zoning
5,040 sfGross Floor Area
6Units
Rent Stabilized2 Open Violations ▸
Five to six families · 2,000 sf lot · 2.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABEJA ENGINEERING PLLC208/24/2021
SYED ENGINEERING, P.C.106/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
PRAMNOS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABEJA ENGINEERING PLLC7269208/24/2021
Building Lifecycle
All (27)Filed (3)Permit Issued (2)Signed Off (2)Violation (14)Special Inspection (6)
04/12/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
I
06/14/2022
Signed off — Alteration
Q00542781-I1
03/03/2022
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, closed)
A
10/14/2021
Signed off — Alteration
FILING TO REPLACE THE BRICK AND STEEL LINTELS AND REPAIR THE FRONT PARAPET WALL ABOVE THE 3RD. FL. WINDOWS ALONG THE FRONT FACADE ONLY.
Q00542778-I1
08/30/2021
Permit issued — General Construction
Q00542778-I1-GC
08/24/2021
Filed — Alteration
FILING TO REPLACE THE BRICK AND STEEL LINTELS AND REPAIR THE FRONT PARAPET WALL ABOVE THE 3RD. FL. WINDOWS ALONG THE FRONT FACADE ONLY.
Q00542778-P1
08/24/2021
Special inspection requirement — Masonry
JOHANN VELEZ
08/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
08/24/2021
Special inspection requirement — Final
JOHANN VELEZ
08/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
08/23/2021
Special inspection requirement — Masonry
JOHANN VELEZ
08/23/2021
Special inspection requirement — Final
JOHANN VELEZ
08/14/2021
Filed — Alteration
FILING TO REPLACE THE BRICK AND STEEL LINTELS AND REPAIR THE FRONT PARAPET WALL ABOVE THE 3RD. FL. WINDOWS ALONG THE FRONT FACADE ONLY.
Q00542778-I1
06/21/2021
Filed — Alteration
Q00542781-I1
06/21/2021
Permit issued — Sidewalk Shed
Q00542781-I1-SH
04/14/2021
Violation issued (HPD, closed)
A
11/30/2017
Violation issued (HPD, closed)
I
11/16/2016
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPRAMNOS LLC08/30/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/21/2021
BISFSISSUEDSTUYVESANT OIL BURNER CORP.10/18/2000
1 project · most recent 06/14/2021
FiledStatusContractorScope
06/14/2021CompleteELPO ELECTRICAL CONTG INC—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/24/2021MasonryJOHANN VELEZspecial
08/24/2021Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
08/24/2021FinalJOHANN VELEZprogress
08/23/2021Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
08/23/2021MasonryJOHANN VELEZspecial
08/23/2021FinalJOHANN VELEZprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00542781-I1Request digital key ↗
08/27/2026Q00542778-P1Request digital key ↗
08/27/2026Q00542778-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026Q00542778-P1Open ↗
08/29/2026Q00542778-P1Open ↗
08/23/2026Q00542778-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00542781-I1Open ↗
08/13/2026Q00542778-P1Open ↗
08/13/2026Q00542778-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026Q00542778-P1Open ↗
08/23/2026Q00542778-I1Open ↗