← Back
Four families
34 7 AVENUE
BROOKLYN · BIN 3019286
💬 Discuss this project
1873Year Built
3Stories
C3Building Class
R6AZoning
3,960 sfGross Floor Area
4Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Four families · Owner of record: BROOKLYN RENTAL HOMES LLC · 2,172 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalOther
Roof3p · 1 filing · 20 docs
Floor 38p · 2 filings · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 1
Basement1p · 1 filing · 20 docs
Sub-Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN RENTAL HOMES LLC403/22/2026
ELI MANAGEMENT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/25/2023$3.9M—— → —$987/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURE+CONSTRUCTION, PLLC805/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & E GUNDERSEN CONSTRUCTGeneral Contractor1007/08/2026
NAS ELECTRIC CORPElectrical103/22/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURE+CONSTRUCTION1326805/17/2024
JAJ ENGINEERING PLLC930405/17/2024
Building Lifecycle
All (64)Filed (8)Permit Issued (5)Violation (16)Inspection (3)Objection (2)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
01/06/2026
Violation issued (ECB, closed)
Construction
01/06/2026
Violation issued (ECB, closed)
Construction
11/19/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
04/28/2025
Violation issued (ECB, closed)
Construction
04/28/2025
Violation issued (ECB, closed)
Construction
11/27/2024
Violation issued (HPD, open)
I
07/08/2024
Violation issued (ECB, closed)
Construction
07/08/2024
Violation issued (ECB, closed)
Construction
05/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joshua Pulver
05/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
05/23/2024
Special inspection requirement — Mechanical Systems
Joshua Pulver
05/23/2024
Special inspection requirement — Structural Steel - Details
Joseph Jabour
05/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Joshua Pulver
05/23/2024
Special inspection requirement — Final
Joshua Pulver
05/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Joshua Pulver
05/23/2024
Special inspection requirement — Air barrier - visual inspection
Joshua Pulver
05/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Joshua Pulver
05/23/2024
Special inspection requirement — Lighting in dwelling units
Joshua Pulver
05/23/2024
Special inspection requirement — Shutoff dampers
Joshua Pulver
05/23/2024
Special inspection requirement — Fenestration areas
Joshua Pulver
05/23/2024
Special inspection requirement — Fenestration air leakage
Joshua Pulver
05/17/2024
Filed — Alteration
RENOVATE EXISTING APARTMENT AT THE BASEMENT. DEMO AND CONSTRUCT WALLS, FINISHES AND CABINETRY. INSTALL TOILET EXHAUST. MODIFY REAR FACADE FOR NEW WINDOW OPENING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01020030-P2
05/15/2024
Special inspection requirement — Structural Steel - Details
Joseph Jabour
05/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
05/15/2024
Special inspection requirement — Mechanical Systems
Joshua Pulver
05/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joshua Pulver
05/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Joshua Pulver
05/15/2024
Special inspection requirement — Final
Joshua Pulver
05/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
Joshua Pulver
05/15/2024
Special inspection requirement — Lighting in dwelling units
Joshua Pulver
05/15/2024
Special inspection requirement — Fenestration air leakage
Joshua Pulver
05/15/2024
Special inspection requirement — Shutoff dampers
Joshua Pulver
05/15/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Joshua Pulver
05/15/2024
Special inspection requirement — Air barrier - visual inspection
Joshua Pulver
05/15/2024
Special inspection requirement — Fenestration areas
Joshua Pulver
05/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2024
Filed — Alteration
RENOVATE EXISTING APARTMENT AT THE BASEMENT. DEMO AND CONSTRUCT WALLS, FINISHES AND CABINETRY. INSTALL TOILET EXHAUST. MODIFY REAR FACADE FOR NEW WINDOW OPENING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01020030-S1
04/09/2024
Filed — Alteration
RENOVATE EXISTING APARTMENT AT THE BASEMENT. DEMO AND CONSTRUCT WALLS, FINISHES AND CABINETRY. INSTALL TOILET EXHAUST. MODIFY REAR FACADE FOR NEW WINDOW OPENING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01020030-P1
04/05/2024
Violation issued (ECB, closed)
Construction
04/05/2024
Violation issued (ECB, closed)
Construction
04/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Joshua Pulver
04/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Joshua Pulver
04/03/2024
Violation issued (HPD, open)
A
03/28/2024
Permit issued — Mechanical Systems
B01020030-I1-GC-CX
03/26/2024
Permit issued — Structural
B00907763-S3-ST
03/26/2024
Permit issued — Mechanical Systems
B00907763-S2-MS
03/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
03/19/2024
Filed — Alteration
RENOVATE EXISTING APARTMENT AT THE BASEMENT. DEMO AND CONSTRUCT WALLS, FINISHES AND CABINETRY. INSTALL TOILET EXHAUST. MODIFY REAR FACADE FOR NEW WINDOW OPENING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01020030-I1
02/02/2024
Objection resolved — Addressed
02/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
02/01/2024
Objection raised — Admin
01/26/2024
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION TO EXISTING EXISTING APARTMENTS AT THE 2ND & 3RD FLOORS. INSTALL NEW SPLIT A/C SYSTEM WITH ROOFTOP CONDENSERS. INSTALL TOILET EXHAUST FANS.
B00907763-S3
01/26/2024
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION TO EXISTING EXISTING APARTMENTS AT THE 2ND & 3RD FLOORS. INSTALL NEW SPLIT A/C SYSTEM WITH ROOFTOP CONDENSERS. INSTALL TOILET EXHAUST FANS.
B00907763-S2
11/20/2023
Violation issued (HPD, closed)
I
11/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/02/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/16/2023
Permit issued — Plumbing
B00907763-S1-PL
08/03/2023
Permit issued — General Construction
B00907763-I1-GC
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedM & E GUNDERSEN CONSTRUCT03/28/2024
DOB NOWStructuralPermit IssuedM & E GUNDERSEN CONSTRUCT03/26/2024
DOB NOWMechanical SystemsPermit IssuedM & E GUNDERSEN CONSTRUCT03/26/2024
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP08/16/2023
DOB NOWGeneral ConstructionPermit IssuedM & E GUNDERSEN CONSTRUCT08/03/2023
2 projects · most recent 05/17/2024
Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/17/2024Permit IssuedM & E GUNDERSEN CONSTRUCTVentilation Systems
Ventilation
01/26/2024Permit IssuedM & E GUNDERSEN CONSTRUCTAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM36NAMHZ-U1 42,000 BTU · Condensing Unit ×2
Ventilation
Mitsubishi Electric TX FAN 100 CFM · Exhaust Fan ×4
1 project · most recent 05/17/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/17/2024——Gas, Water/Sanitary
1 project · most recent 11/01/2023
General Wiring
FiledStatusContractorScope
11/01/2023Permit IssuedNAS ELECTRIC CORPGeneral Wiring
2 projects · most recent 05/17/2024
Steel
FiledStatusContractorScope
05/17/2024Permit IssuedM & E GUNDERSEN CONSTRUCTSteel
01/26/2024Permit IssuedM & E GUNDERSEN CONSTRUCTSteel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
05/23/2024Structural Stability – Alterations of existing buildingsJoshua Pulverspecial
05/23/2024Fire-Resistant Penetrations and JointsJoshua Pulverspecial
05/23/2024Mechanical SystemsJoshua Pulverspecial
05/23/2024Structural Steel - DetailsJoseph Jabourspecial
05/23/2024Fire-Resistance Rated ConstructionJoshua Pulverprogress
05/23/2024FinalJoshua Pulverprogress
05/23/2024Energy Code Compliance InspectionsJoshua Pulverprogress
05/23/2024Air barrier - visual inspectionJoshua Pulverenergy_progress
05/23/2024Fenestration and door U-factor and product ratingsJoshua Pulverenergy_progress
05/23/2024Lighting in dwelling unitsJoshua Pulverenergy_progress
05/23/2024Shutoff dampersJoshua Pulverenergy_progress
05/23/2024Fenestration areasJoshua Pulverenergy_progress
05/23/2024Fenestration air leakageJoshua Pulverenergy_progress
05/15/2024Structural Steel - DetailsJoseph Jabourspecial
05/15/2024Fire-Resistant Penetrations and JointsJoshua Pulverspecial
05/15/2024Mechanical SystemsJoshua Pulverspecial
05/15/2024Structural Stability – Alterations of existing buildingsJoshua Pulverspecial
05/15/2024Energy Code Compliance InspectionsJoshua Pulverprogress
05/15/2024FinalJoshua Pulverprogress
05/15/2024Fire-Resistance Rated ConstructionJoshua Pulverprogress
05/15/2024Lighting in dwelling unitsJoshua Pulverenergy_progress
05/15/2024Fenestration air leakageJoshua Pulverenergy_progress
05/15/2024Shutoff dampersJoshua Pulverenergy_progress
05/15/2024Fenestration and door U-factor and product ratingsJoshua Pulverenergy_progress
05/15/2024Air barrier - visual inspectionJoshua Pulverenergy_progress
Latest 25 of 49.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00907763-S2Request digital key ↗
08/26/2026B00907763-S1Request digital key ↗
08/26/2026B00907763-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/13/2026B01020030-P2Open ↗
08/13/2026B01020030-S1Open ↗
08/13/2026B01020030-I1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B00907763-S3Open ↗
09/02/2026B01020030-I1Open ↗
09/02/2026B01020030-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026B00907763-S3Open ↗
09/02/2026B00907763-S3Open ↗
09/02/2026B01020030-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00907763-S1Open ↗
08/26/2026B00907763-I1Open ↗
08/26/2026B00907763-S3Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026B00907763-S2Open ↗
08/26/2026B00907763-S1Open ↗
08/26/2026B00907763-I1Open ↗
Showing 3 of 8 on file for this type