← Back
BuildNYC
Shopping center, with or without parking
34 BARRETT AVENUE
STATEN ISLAND · Port Richmond · BIN 5110053
💬 Discuss this project
1957Year Built
1Stories
K6Building Class
C4-1Zoning
245,118 sfGross Floor Area
24Units
0 Active ViolationsFDNY Report ↗
Shopping center, with or without parking · 586,050 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofT-Mobile3p · 2 filings · 20 docs
Floor 1T-Mobile20p · 2 filings · 20 docs
Site & exteriorT-Mobile4p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Kimco Realty3307/08/2026
Philips International Holding203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Caruso Turley Scott210/31/2025
Dennis J. Lewis PE202/28/2025
Russell M. Baumann, Architect102/28/2025
HC Engineering301/20/2022
Vincent J. Liotta P.E112/02/2019
Shaaban Engineering309/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates1003/21/2026
JP Expedite603/21/2026
National Sign and Lighting603/21/2026
Vincent J. Liotta P.E103/21/2026
Vincent J. Liotta P. E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ridge ConstructionGeneral Contractor603/21/2026
National MaintenanceSign hanger307/08/2026
Signs CadSign hanger307/08/2026
Afgo Mechanical Servicesspecialty_contractor203/21/2026
Fulton Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Autographic Co1579210/31/2025
Catalpa Special Inspectio2004402/28/2025
Vincent J. Liotta P. E1974112/02/2019
Building Lifecycle
All (64)Filed (12)Permit Issued (11)Signed Off (9)Inspection (3)Special Inspection (29)
12/19/2025
Signed off — Alteration
T-Mobile: Structural for ceiling-suspended display elements at 1st floor as per plans filed.
S01186534-I1
11/06/2025
Special inspection requirement — Structural Steel - High Strength Bolting
asghar Ghodsi
11/06/2025
Special inspection requirement — Final
ERIC BERLENT
11/06/2025
Special inspection requirement — Structural Steel - Details
asghar Ghodsi
11/06/2025
Special inspection requirement — Structural Cold-Formed Steel
asghar Ghodsi
10/31/2025
Filed — Alteration
T-Mobile: Structural for ceiling-suspended display elements at 1st floor as per plans filed.
S01186534-P1
10/30/2025
Special inspection requirement — Structural Cold-Formed Steel
asghar Ghodsi
10/30/2025
Special inspection requirement — Structural Steel - High Strength Bolting
asghar Ghodsi
10/30/2025
Special inspection requirement — Structural Steel - Details
asghar Ghodsi
10/30/2025
Special inspection requirement — Final
ERIC BERLENT
09/17/2025
Signed off — Alteration
T-Mobile: General construction inclusive of partitions modifications for retail store remodel as per plans filed. No change to use, egress, or occupancy.
S01186527-I1
09/17/2025
Signed off — Alteration
T-Mobile: General construction inclusive of partitions modifications for retail store remodel as per plans filed. No change to use, egress, or occupancy.
S01186527-S1
09/17/2025
Signed off — Alteration
T-Mobile: General construction inclusive of partitions modifications for retail store remodel as per plans filed. No change to use, egress, or occupancy.
S01186527-S2
07/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/20/2025
Permit issued — Plumbing
S01186527-S2-PL
03/09/2025
Permit issued — General Construction
S01186527-I1-GC
03/07/2025
Permit issued — Structural
S01186534-I1-ST
03/07/2025
Permit issued — Mechanical Systems
S01186527-S1-MS
02/28/2025
Filed — Alteration
T-Mobile: Structural for ceiling-suspended display elements at 1st floor as per plans filed.
S01186534-I1
02/28/2025
Filed — Alteration
T-Mobile: General construction inclusive of partitions modifications for retail store remodel as per plans filed. No change to use, egress, or occupancy.
S01186527-I1
02/28/2025
Filed — Alteration
T-Mobile: General construction inclusive of partitions modifications for retail store remodel as per plans filed. No change to use, egress, or occupancy.
S01186527-S1
02/28/2025
Filed — Alteration
T-Mobile: General construction inclusive of partitions modifications for retail store remodel as per plans filed. No change to use, egress, or occupancy.
S01186527-S2
02/28/2025
Special inspection requirement — Maintenance information
ERIC BERLENT
02/28/2025
Special inspection requirement — Concrete - Cast-In-Place
ERIC BERLENT
02/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
ERIC BERLENT
02/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
ERIC BERLENT
02/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIC BERLENT
02/26/2025
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
02/26/2025
Special inspection requirement — Interior lighting power
ERIC BERLENT
02/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
02/26/2025
Special inspection requirement — Lighting controls
ERIC BERLENT
02/25/2025
Special inspection requirement — Final
ERIC BERLENT
02/25/2025
Special inspection requirement — Final
ERIC BERLENT
02/25/2025
Special inspection requirement — Mechanical Systems
ERIC BERLENT
04/01/2024
Signed off — Alteration
S00184443-I1
11/09/2022
Signed off — Alteration
S00574893-I1
11/09/2022
Signed off — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-C WITH BACK PANEL, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
S00574902-I1
11/09/2022
Signed off — Alteration
REPLACE ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A WITH BACK PANEL, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
S00574882-I1
01/27/2022
Permit issued — Sign
S00574902-I1-SG
01/20/2022
Filed — Alteration
S00574893-I1
01/20/2022
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-C WITH BACK PANEL, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
S00574902-I1
01/20/2022
Filed — Alteration
REPLACE ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A WITH BACK PANEL, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
S00574882-I1
01/20/2022
Permit issued — Sign
S00574893-I1-SG
01/20/2022
Permit issued — Sign
S00574882-I1-SG
08/11/2021
Special inspection requirement — Final
Hackjong Choi
08/11/2021
Special inspection requirement — Final
Hackjong Choi
12/09/2019
Signed off — Alteration
INSTALLATION OF 12.5 TON TOTAL CAPACITY PACKAGE UNIT ON THE ROOFTOP. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
S00232961-I1
12/02/2019
Filed — Alteration
INSTALLATION OF 12.5 TON TOTAL CAPACITY PACKAGE UNIT ON THE ROOFTOP. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
S00232961-I1
12/02/2019
Permit issued — Mechanical Systems
S00232961-I1-MS
12/02/2019
Special inspection requirement — Maintenance information
Vincent Liotta
12/02/2019
Special inspection requirement — HVAC insulation and sealing
Vincent Liotta
12/02/2019
Special inspection requirement — HVAC and service water heating system controls
Vincent Liotta
12/02/2019
Special inspection requirement — HVAC and service water heating equipment
Vincent Liotta
09/26/2019
Filed — Alteration
S00184443-I1
09/26/2019
Filed — Alteration
S00180495-I1
09/26/2019
Filed — Alteration
S00184455-I1
09/26/2019
Permit issued — Sign
S00184443-I1-SG
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFulton Plumbing & Heating03/20/2025
DOB NOWGeneral ConstructionSigned-offRidge Construction03/09/2025
DOB NOWStructuralSigned-offRidge Construction03/07/2025
DOB NOWMechanical SystemsSigned-offRidge Construction03/07/2025
DOB NOWSignSigned-offSigns Cad01/27/2022
DOB NOWSignSigned-offSigns Cad01/20/2022
DOB NOWSignSigned-offSigns Cad01/20/2022
DOB NOWMechanical SystemsSigned-offAfgo Mechanical Services12/02/2019
DOB NOWSignSigned-offNational Maintenance09/26/2019
DOB NOWSignPermit IssuedNational Maintenance09/26/2019
DOB NOWSignPermit IssuedNational Maintenance09/26/2019
BISOTISSUEDMDS Builders10/22/2015
BISPLISSUEDPrimo Plumbing & Heating02/05/2009
BISEQISSUEDSchimenti Construction Co02/03/2009
BISMHISSUEDSchimenti Construction Co02/03/2009
BISOTISSUEDSchimenti Construction Co02/03/2009
BIS—ISSUEDTru-Art Sign Co12/31/2008
BIS—ISSUEDTru-Art Sign Co12/31/2008
BIS—ISSUEDFrank Torrone & Sons01/04/1999
BIS—ISSUEDFrank Torrone & Sons01/04/1999
BISMHISSUEDS. Macedo Construction06/13/1994
BISPLISSUEDP.A.C. Heating11/12/1993
BISEQISSUEDS. Macedo Construction07/15/1993
BISOTISSUEDS. Macedo Construction07/15/1993
BISOTISSUEDS. Macedo Construction06/02/1993
7 projects · most recent 03/19/2025
General Wiring
FiledStatusContractorScope
03/19/2025CompleteLebo ElectricGeneral Wiring
06/13/2022CompleteSigns Cad—
06/13/2022CompleteSigns Cad—
06/13/2022CompleteSigns Cad—
10/02/2019Permit IssuedNational Maintenance—
10/02/2019Permit IssuedNational Maintenance—
10/02/2019Permit IssuedNational Maintenance—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
11/06/2025Structural Steel - High Strength Boltingasghar Ghodsispecial
11/06/2025FinalERIC BERLENTprogress
11/06/2025Structural Steel - Detailsasghar Ghodsispecial
11/06/2025Structural Cold-Formed Steelasghar Ghodsispecial
10/30/2025Structural Cold-Formed Steelasghar Ghodsispecial
10/30/2025Structural Steel - High Strength Boltingasghar Ghodsispecial
10/30/2025Structural Steel - Detailsasghar Ghodsispecial
10/30/2025FinalERIC BERLENTprogress
02/28/2025Maintenance informationERIC BERLENTenergy_progress
02/28/2025Concrete - Cast-In-PlaceERIC BERLENTspecial
02/28/2025HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
02/28/2025HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
02/28/2025HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
02/26/2025Energy Code Compliance InspectionsERIC BERLENTprogress
02/26/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
02/26/2025Interior lighting powerERIC BERLENTenergy_progress
02/26/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
02/26/2025Lighting controlsERIC BERLENTenergy_progress
02/25/2025FinalERIC BERLENTprogress
02/25/2025FinalERIC BERLENTprogress
02/25/2025Mechanical SystemsERIC BERLENTspecial
08/11/2021FinalHackjong Choiprogress
08/11/2021FinalHackjong Choiprogress
12/02/2019Maintenance informationVincent Liottaenergy_progress
12/02/2019HVAC insulation and sealing Vincent Liottaenergy_progress
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
T-MobileRetailFloor 1
Project S01186527 Alteration · LOC Issued · 02/28/2025
Project S01186534 Alteration · LOC Issued · 02/28/2025
Project S00574882 Alteration · LOC Issued · 01/20/2022
Project S00574893 Alteration · LOC Issued · 01/20/2022
Project S00574902 Alteration · LOC Issued · 01/20/2022
Project S00184443 Alteration · LOC Issued · 09/26/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch8
08/24/2026S00574882-I1Request digital key ↗
08/24/2026S00574902-I1Request digital key ↗
08/24/2026S00574893-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sign3
08/26/2026S00180495-I1Request digital key ↗
08/26/2026S00184443-I1Request digital key ↗
08/26/2026S00184455-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026S00232961-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
10/28/2015520250442Open ↗
02/06/2009510066777Open ↗
02/03/2009510066777Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
09/04/2015520250442Open ↗
05/15/2009510066777Open ↗
01/30/2009510066777Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications68
▸DOB NOWProgress Inspector Seal & Signature18
10/09/2026S00574902-I1Open ↗
09/01/2026S01186534-I1Open ↗
09/01/2026S00574882-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
10/28/2015520250442Open ↗
09/04/2015520250442Open ↗
06/08/2009510063495Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026S00184443-I1Open ↗
08/26/2026S00184455-I1Open ↗
08/26/2026S00232961-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/22/2026S01186527-S2Open ↗
09/01/2026S01186534-I1Open ↗
09/01/2026S01186534-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
09/30/2015520250442Open ↗
01/30/2009510066777Open ↗
12/19/2008510063486Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
01/30/2009510066777Open ↗
01/30/2009510066777Open ↗
12/19/2008510063486Open ↗
Showing 3 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)1
09/04/2015520250442Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE2
03/11/2009510066777Open ↗
03/04/2009510066777Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/19/2009510066777Open ↗
▸BISEQUIPMENT USE PERMITS1
05/19/2009510066777Open ↗
▸BISSCHEDULE B - PLUMBING1
01/30/2009510066777Open ↗
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/26/2026S00184443-I1Open ↗
08/26/2026S00184455-I1Open ↗
08/24/2026S00574882-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/13/2026S00180495-I1Open ↗
08/13/2026S00184443-I1Open ↗
08/13/2026S01186527-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026S01186527-I1Open ↗
08/13/2026S01186527-S2Open ↗
08/13/2026S01186527-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
12/19/2008510063486Open ↗
12/19/2008510063495Open ↗
12/19/2008510063501Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/04/2015520250442Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/30/2009510066777Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/28/2015520250442Open ↗
09/04/2015520250442Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS5
09/04/2015520250442Open ↗
01/30/2009510066777Open ↗
12/19/2008510063486Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/08/2009510063486Open ↗
06/08/2009510063495Open ↗
06/08/2009510063501Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/30/2015520250442Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
09/04/2015520250442Open ↗
05/15/2009510066777Open ↗
01/30/2009510066777Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET6
09/04/2015520250442Open ↗
01/30/2009510066777Open ↗
01/30/2009510066777Open ↗
Showing 3 of 6 on file for this type