← Back
Condo, residential unit in 1-3 story building
Fourth Columbia Terrace Condominium
34 CARROLL STREET · BIN 3345236
💬 Discuss this project
1986Year Built
3Stories
R3Building Class
R6BZoning
36,683 sfGross Floor Area
45Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · 27,000 sf lot · 1.36 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FOURTH COLUMBIA TERRACE CONDO603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROB HEGEDUS ARCHITECT403/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMANI CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VEGAS RENOVATIONS CORPGeneral Contractor303/21/2026
G.P. MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254403/25/2025
Building Lifecycle
All (28)Filed (4)Permit Issued (2)Signed Off (2)Violation (7)Inspection (5)Objection (2)Special Inspection (6)
05/28/2025
Violation issued (ECB, closed)
Boilers
05/21/2025
Signed off — Alteration
Apt 60-1: renovate existing bathroom, renovate existing kitchen, renovate existing laundry room, filed in conjunction with general construction
B01095283-S1
05/21/2025
Signed off — Alteration
Apt 60-1: renovate existing bathroom, renovate existing kitchen, renovate existing laundry room, filed in conjunction with general construction
B01095283-I1
04/14/2025
Violation issued (ECB, closed)
Construction
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
03/25/2025
Filed — Alteration
Apt 60-1: renovate existing bathroom, renovate existing kitchen, renovate existing laundry room, filed in conjunction with general construction
B01095283-P2
02/13/2025
Objection resolved — Addressed
01/02/2025
Objection raised — Scope
12/22/2024
Filed — Alteration
Apt 60-1: renovate existing bathroom, renovate existing kitchen, renovate existing laundry room, filed in conjunction with general construction
B01095283-P1
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
12/14/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/19/2024
Permit issued — Plumbing
B01095283-S1-PL
09/16/2024
Permit issued — General Construction
B01095283-I1-GC
08/23/2024
Filed — Alteration
Apt 60-1: renovate existing bathroom, renovate existing kitchen, renovate existing laundry room, filed in conjunction with general construction
B01095283-S1
08/23/2024
Filed — Alteration
Apt 60-1: renovate existing bathroom, renovate existing kitchen, renovate existing laundry room, filed in conjunction with general construction
B01095283-I1
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
ROBERT HEGEDUS
08/13/2024
Special inspection requirement — Final
ROBERT HEGEDUS
08/13/2024
Special inspection requirement — Interior lighting power
ROBERT HEGEDUS
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/19/2021
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offG.P. MECHANICAL CORP09/19/2024
DOB NOWGeneral ConstructionSigned-offVEGAS RENOVATIONS CORP09/16/2024
2 projects · most recent 10/03/2024
General Wiring
FiledStatusContractorScope
10/03/2024CompleteQEC ELECTRICAL SVCE CORPGeneral Wiring
10/27/2019CompleteFALCO ELEC'L SERVICES INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/28/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/19/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
08/13/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
08/13/2024Energy Code Compliance InspectionsROBERT HEGEDUSprogress
08/13/2024FinalROBERT HEGEDUSprogress
08/13/2024Interior lighting powerROBERT HEGEDUSenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026B01095283-P1Request digital key ↗
08/23/2026B01095283-I1Request digital key ↗
08/23/2026B01095283-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026B01095283-S1Open ↗
08/23/2026B01095283-I1Open ↗
08/23/2026B01095283-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026B01095283-I1Open ↗
08/27/2026B01095283-I1Open ↗
08/27/2026B01095283-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01095283-S1Open ↗
08/27/2026B01095283-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01095283-S1Open ↗
08/23/2026B01095283-P2Open ↗
08/23/2026B01095283-I1Open ↗
Showing 3 of 4 on file for this type