DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB11/14/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB08/13/2018WORK W/O A PERMIT. NOTED: 1 STY COMMERCIAL BLDG BEING OPERATED AS ICE CREAM FACTORY OBSERVED APPROX 200 SF ILLEGAL ROOFING ERECTED AT REAR OF BLDG. NO DOB PERITS ON FILE FOR THIS WORK. REMEDY: OBTAIN PERMIT TO$6K due
ECB08/13/2018FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. OBSERVED 1 STY COMMERCIAL BLDG BEING OPERATED AS ICE CREAM FACTORY(CERT OF OCCUPANCY#75519)PASSAGEWAY LOCATED AT REAWR OF BLDG BEING BLOCKED BY MATERIALS,PIPES &$6K due
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB06/23/2017VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB02/01/2017BROKEN MECHANICAL COMPRESSORS: OBSERVED CRACKED OIL PIPES RESULTING IN LEAKS AND VIBRATION WHICH TRIGGERED VALVE DETRACCHMENT AND BROKEN PIS TON: DELINEATING CRITICAL CODES. DEFECTIVE WIRING, NO PROCESS FLOW DIA GRAM DELINEATING CRITICAL CODES. DEFECTIVE AMONIA ARLAM & NO MAINTENAN CE LOG OF MECHANICAL SYSTEM/COMPLY WITH MECHANICAL CODE SECTIONMC102.3
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/01/1994V-DOB VIOLATION - ACTIVE
DOB06/01/1994V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB06/01/1993V-DOB VIOLATION - ACTIVE
DOB06/01/1993V-DOB VIOLATION - ACTIVE
ECB11/15/2017FAILURE TO COMPLY W/COMM'S ORDER TO FILE COFC W/DOB.NOTED:DOB VIO#02017C1701AU-ISSUED ON 2/2/17 FOR BROKEN MECHANICAL EQUIPMENT.NO COFC ON FILE.REM:COMPLY W/ COMM'S ORDERNothing owed — awaiting certificate of correction
ECB08/24/200944A.50A.50B 50A SAFETY RELIEF VALVE MUST BE DOWN 8' FROM FL W/NO THREADS ON END 50B REPIPE BOTTOM BLOW DOWN SO IT DOESN'T FACE WALLNothing owed — awaiting certificate of correction
ECB04/21/200850A50B. FULTON VT BOILER 10HP NB99861 OIL FD 2005 INSTALL A DRAIN LINEON THE GAUGE GLASS ASSEMBLY INSTALL A DRAIN LINE AND PIPE TO A SAFE POINT OF DISCHARGE. 50B SAFETY VALVE DISCHARGE PIPE SYSTEM IS COPPERNothing owed — awaiting certificate of correction