34 Garfield Place, Brooklyn

34 Garfield Place, Brooklyn: 4 DOB NOW job filings; 14 work permits (2 open, 12 signed off). Most recent permit issued 2026-02-09.

Building facts

Borough
Brooklyn
Year built
1931
Stories
2
Dwelling units
2
Building floor area (sq ft)
4,500
Zoning
R6B
Building class
S1

Design team

Design firmDisciplineJobs at this building
Yang Engineering LLCGeneral Engineering2
Ashraf Corp.MEP1
Jian Engineering PLLCStructural1
Jimenez Building Consulting LLCGeneral Engineering1

Contractors and firms on permits

BusinessJobs at this building
Acer Construction Inc.1
Dynamic Plbg & Sprklr Cor1
Dynamic Plbng & Sprkr Cor1
Lakhi General Contractor1
NYC Mainman Corp.1

Work permits

IssuedWork typeStatusBusinessDescription
2026-02-09PlumbingSigned-offDynamic Plbg & Sprklr CorPROPOSED PLUMBING WORK ON OPEN SPACE, CELLAR, 1ST TO 4TH FLOOR,PENTHOUSE, ROOF IN CONJUNCTION WITH DOB ALTERATION CO JOB #: B01001057-I1. NO CHANGE IN USE, BULK, EGRESS…
2026-02-09SprinklersSigned-offDynamic Plbng & Sprkr CorPROPOSED AUTOMATIC SPRINKLER SYSTEM AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # B01001057-I1.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
2026-01-14Mechanical SystemsSigned-offAcer Construction Inc.PROPOSED MECHANICAL WORK ON CELLAR, 1ST TO 4TH FLOOR, PENTHOUSE & ROOF. IN CONJUNCTION WITH DOB NOW ALT-CO JOB NO: B01001057-I1 AS PER PLAN. NO CHANGE IN USE, EGRESS OR…
2025-10-21General ConstructionPermit IssuedAcer Construction Inc.CONVERTED EXISTING MANAFACTURER USE TO RESIDENTIAL 4 DWELLING UNITS OF AN EXISTING 2 STORY BUILDING WITH CELLAR. PROPOSED 3RD FLOOR, 4TH FLOOR AND PENTHOUSE. AS PER PLAN…
2025-10-03Construction FenceSigned-offAcer Construction Inc.SUBMIT TEMPORARY CONSTRUCTION FENCE WORK AT OPEN SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2025-06-04PlumbingSigned-offNYC Mainman Corp.SUBSEQUENT FILING FOR EXTERIOR PLUMBING WORK PER DEP APPROVAL# SCK-1550.24
2025-01-21SprinklersSigned-offDynamic Plbng & Sprkr CorPROPOSED AUTOMATIC SPRINKLER SYSTEM AS PER PLAN. IN CONJUNCTION WITH DOB ALT-CO-NEW BUILDING JOB # B01001057-I1.NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
2025-01-21PlumbingSigned-offDynamic Plbg & Sprklr CorPROPOSED PLUMBING WORK ON OPEN SPACE, CELLAR, 1ST TO 4TH FLOOR,PENTHOUSE, ROOF IN CONJUNCTION WITH DOB ALTERATION CO JOB #: B01001057-I1. NO CHANGE IN USE, BULK, EGRESS…
2024-12-11Mechanical SystemsSigned-offAcer Construction Inc.PROPOSED MECHANICAL WORK ON CELLAR, 1ST TO 4TH FLOOR, PENTHOUSE & ROOF. IN CONJUNCTION WITH DOB NOW ALT-CO JOB NO: B01001057-I1 AS PER PLAN. NO CHANGE IN USE, EGRESS OR…
2024-11-25Sidewalk ShedSigned-offLakhi General ContractorHEAVY DUTY SIDEWALK SHED FOR EXTERIOR REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF T…
2024-10-16StructuralSigned-offAcer Construction Inc.A PROPOSED STRUCTURAL CONSTRUCTION FILING # B01001057-S4 IN CONJUNCTION WITH GENERAL CONSTRUCTION #: B01001057-I1.
2024-10-15FoundationSigned-offAcer Construction Inc.A PROPOSED FOUNDATION CONSTRUCTION FILING #B01001057-S5 IN CONJUNCTION WITH GENERAL CONSTRUCTION #B01001057-I1.
2024-10-15General ConstructionPermit IssuedAcer Construction Inc.CONVERTED EXISTING MANAFACTURER USE TO RESIDENTIAL 4 DWELLING UNITS OF AN EXISTING 2 STORY BUILDING WITH CELLAR. PROPOSED 3RD FLOOR, 4TH FLOOR AND PENTHOUSE. AS PER PLAN…
2024-09-27Construction FenceSigned-offAcer Construction Inc.SUBMIT TEMPORARY CONSTRUCTION FENCE WORK AT OPEN SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

Job filings

JobFiledTypeStatus
B010010572026-07-23ALT-CO - New Building with Existing Elements to RemainApproved
B011450212024-11-23AlterationLOC Issued
B010182832024-03-26AlterationFiling Withdrawn
B009936752024-01-23Alteration COFiling Withdrawn