Elevator cooperative
Be@schermerhorn Condominium
34 PLAZA ST EAST · Prospect Heights · BIN 3029314
💬 Discuss this project
1956Year Built
12Stories
D4Building Class
R8XZoning
120,001 sfGross Floor Area
119Units
LL97 CoveredRent Stabilized16 Open Violations 13 unresolved · 3 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 34 PLAZA OWNERS CORP · 14,673 sf lot · 8.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 20 docs
Floor 85p · 1 filing · 3 docs
Floor 75p · 2 filings · 20 docs
Floor 63p · 1 filing · 3 docs
Floor 5
Floor 49p · 1 filing · 15 docs
Floor 3
Floor 2
Floor 11p · 1 filing · 4 docs
Cellar3p · 1 filing · 20 docs
Sub-Cellar4p · 1 filing · 20 docs
Site & exterior8p · 2 filings · 17 docs
Filed — no permit issued14p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
34 PLAZA OWNERS6103/22/2026
ORSID REALTY CORP1709/13/2026
BE@SCHERMERHORN CONDOMINIUM903/22/2026
K E S CONSTRUCTION807/08/2026
SPRING SCAFFOLDING LLC503/22/2026
MARIN MANAGEMENT CORP.303/21/2026
34 PLAZA ST EAST303/21/2026
34 PLAZA O203/21/2026
ORSID NEW YORK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
S M EXPEDITING1003/21/2026
CONAPAC SERVICES DBA203/21/2026
AE DESIGN SOLUTION203/21/2026
KNA CONSULTING203/21/2026
BOSCHEN DESIGN, ARCHITECTURE103/21/2026
D D EXPEDITORS403/21/2026
AK CONSULTING SERVICES403/21/2026
LMS-ACE SERVICES203/21/2026
SKY MANAGEMENT GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COLGATE RESTORATION CORPGeneral Contractor607/08/2026
HIM & WILMAN HOME IMPROVEGeneral Contractor603/21/2026
SIGNORE & SONS PLBG CORPPlumbing307/08/2026
1625 DB INCGeneral Contractor303/21/2026
OASIS PLOMO CORPGeneral Contractor303/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
K.E.S CONSTRUCTION CO INCGeneral Contractor203/21/2026
JOSEPH WEINSTEIN ELECTRIC 000796General Contractor203/22/2026
KBRNY, INCGeneral Contractor203/21/2026
TRIBORO ELEC'L CONTR'G COElectrical103/22/2026
ALEF ELEC'L CONTR'G INCElectrical103/22/2026
KINGS BORO APPLIANCES INCElectrical103/21/2026
ELIASSAINT, DELVAElectrical103/21/2026
COLBREN PLBG & HTG INCPlumbing107/08/2026
SKYLINE RESTORATION INCGeneral Contractor104/09/2026
KRISCORP ELECL CONTNG INCElectrical103/22/2026
NEW CENTURY ELEC'L CONTRElectrical103/22/2026
PARISI, DINOElectrical103/21/2026
NYC TRANSITElectrical103/21/2026
PW & SONS ELECTRICAL CORPElectrical103/22/2026
RICKFORD, JOHNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578503/16/2026
BIZ DESIGNS LLC6312207/22/2025
JOSEPH K. BLUM CO. LLP1741203/05/2025
JOHN H HATHEWAY JR., ARCH4175309/03/2024
BOSCHEN DESIGN, ARCHITECT2477106/06/2024
AK CONSULTING SERVICES, I6198204/09/2024
A&B WORLD CONSULTING, INC5704111/08/2023
Building Lifecycle
All (194)Filed (22)Permit Issued (18)Signed Off (9)Facade (FISP) (15)Violation (60)Inspection (6)Objection (34)Special Inspection (30)
05/19/2026
Signed off — Alteration
GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01117646-I1
03/26/2026
Special inspection requirement — Post-installed Anchors
Anthony Stasio
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
03/26/2026
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jeff Akerman
03/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
03/26/2026
Special inspection requirement — Masonry
Anthony Stasio
03/26/2026
Special inspection requirement — Final
Anthony Stasio
03/16/2026
Filed — Alteration
GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01117646-P2
03/16/2026
Special inspection requirement — Masonry
01/13/2026
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
01/13/2026
Special inspection requirement — Final
Anthony Stasio
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
01/13/2026
Special inspection requirement — Post-installed Anchors
Anthony Stasio
01/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
09/11/2025
Signed off — Alteration
Alterations at apartment #407: Renovation of kitchen, bathrooms and new electrical panel. New partitions at, Bedroom 106 and closets at Hall 117. New flooring at Kitchen 111. No change to occupancy, egress or use.
B01011595-S1
09/11/2025
Signed off — Alteration
Alterations at apartment #407: Renovation of kitchen, bathrooms and new electrical panel. New partitions at, Bedroom 106 and closets at Hall 117. New flooring at Kitchen 111. No change to occupancy, egress or use.
B01011595-I1
08/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/28/2025
Permit issued — General Construction
B01117646-I1-GC-CX
08/08/2025
Permit issued — Plumbing
B01011595-S1-PL
07/31/2025
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWINGS. NO CHANGE INI USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C
B00171610-I1
07/30/2025
Objection raised — Inspections
07/30/2025
Objection resolved — Addressed
07/30/2025
Special inspection requirement — Post-installed Anchors
Anthony Stasio
07/22/2025
Filed — Alteration
GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01117646-P1
07/03/2025
Signed off — Alteration
B00998608-I1
06/10/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2025
Special inspection requirement — Final
Anthony Stasio
06/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jeff Akerman
06/10/2025
Special inspection requirement — Structural Steel - Welding
Anthony Stasio
06/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Stasio
06/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Anthony Stasio
04/29/2025
Signed off — Alteration
Repair/replace facade defects to include masonry, pointing, sills, lintels, patch concrete, partial glazing replacement and caulking.
B00921635-I1
04/29/2025
Cycle 9 facade report signed — SAFE
04/02/2025
Cycle 9 facade report submitted
03/19/2025
Cycle 9 facade inspection completed
03/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Dane Barnes
03/12/2025
Special inspection requirement — Masonry
Dane Barnes
03/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
03/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
Dane Barnes
03/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Dane Barnes
03/12/2025
Special inspection requirement — Final
Dane Barnes
03/12/2025
Special inspection requirement — Fenestration air leakage
Dane Barnes
03/12/2025
Special inspection requirement — Air barrier - visual inspection
Dane Barnes
03/05/2025
Filed — Alteration
Repair/replace facade defects to include masonry, pointing, sills, lintels, patch concrete, partial glazing replacement and caulking.
B00921635-P1
03/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Dane Barnes
02/01/2025
Objection resolved — Addressed
02/01/2025
Objection resolved — Addressed
01/02/2025
Objection resolved — Addressed
01/02/2025
Objection resolved — Addressed
01/02/2025
Objection resolved — Addressed
12/27/2024
Violation issued (FDNY_NOV, closed)
12/24/2024
Objection raised — Scope
12/24/2024
Objection raised — Admin
12/24/2024
Objection raised — Scope
12/24/2024
Objection raised — Inspections
Latest 60 of 194 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC08/28/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP08/08/2025
DOB NOWGeneral ConstructionSigned-offHIM & WILMAN HOME IMPROVE11/15/2024
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. CONSTRUCTION CO IN10/30/2024
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP08/29/2024
DOB NOWGeneral ConstructionSigned-offOASIS PLOMO CORP08/20/2024
DOB NOWSidewalk ShedSigned-offCOLGATE RESTORATION CORP08/05/2024
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. CONSTRUCTION CO IN04/23/2024
DOB NOWGeneral ConstructionSigned-offK.E.S CONSTRUCTION CO INC03/19/2024
DOB NOWSuspended ScaffoldPermit IssuedK.E.S. CONSTRUCTION CO IN02/23/2024
DOB NOWSidewalk ShedSigned-offCOLGATE RESTORATION CORP08/10/2023
DOB NOWGeneral ConstructionPermit Issued1625 DB INC12/01/2021
DOB NOWGeneral ConstructionPermit IssuedKBRNY, INC11/30/2021
DOB NOWPlumbingSigned-offCOLBREN PLBG & HTG INC09/03/2021
DOB NOWGeneral ConstructionSigned-offHIM & WILMAN HOME IMPROVE05/25/2021
DOB NOWSidewalk ShedSigned-offCOLGATE RESTORATION CORP04/23/2020
DOB NOWSidewalk ShedSigned-offCOLGATE RESTORATION CORP05/29/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC06/11/2018
BISOTISSUEDMADISON ROSA07/15/2022
BISOTISSUEDCOLGATE RESTORATION CORP03/11/2022
BISPLISSUEDL&J PLG & HTG CO OF NY IN06/16/2021
BISOTISSUEDCOLGATE RESTORATION CORP03/12/2021
BISOTISSUEDCOLGATE RESTORATION CORP09/25/2020
BISOTISSUEDCOLGATE RESTORATION CORP04/22/2020
BISPLISSUEDSO PLUMBING & HEATING INC09/23/2019
BISOTISSUEDWING LEE CONTRACTOR INC09/20/2019
BISOTISSUEDCOLGATE RESTORATION CORP07/01/2019
BISOTISSUEDFLAWLESS EDGE HOME IMPRO07/01/2019
BISOTISSUEDBR CONSTRUCTION & STONE I05/17/2019
BISOTISSUEDT P HOME CARE CORP03/21/2019
BISPLISSUEDDELTA-SIGMA MECH CORP01/14/2019
BISOTISSUEDBR CONSTRUCTION & STONE I10/02/2018
BISPLISSUEDL&J PLG & HTG CO OF NY IN08/24/2018
BISOTISSUEDFLAWLESS EDGE HOME IMPRO08/09/2018
BISPLISSUEDSAFETY PLMBG & HTG LLC08/09/2018
BISPLISSUEDPOWER PLUMBING & HEATING06/21/2018
BISOTISSUEDCDS DESIGN AND CONSULTING06/04/2018
BISOTISSUEDT P HOME CARE CORP03/15/2018
BISPLISSUEDTOP DOG PLBG & HTG CORP09/22/2017
BISOTISSUEDGOLDEN CONSTRUCTION NY CO09/22/2017
+ 28 more permits on file
1 project · most recent 11/08/2023
FiledStatusContractorScope
11/08/2023———
25 projects · most recent 02/25/2025
General Wiring Lighting
FiledStatusContractorScope
02/25/2025Permit IssuedHIGH QUALITY ELECTRIC OF—
10/17/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
08/29/2024CompleteNEW CENTURY ELEC'L CONTRGeneral Wiring
02/14/2024CompleteHIGH QUALITY ELECTRIC OF—
11/20/2023CompleteALBA ELECTRIC CORPGeneral Wiring
11/02/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
12/27/2022CompletePW & SONS ELECTRICAL CORPGeneral Wiring
09/21/2022CompleteKRISCORP ELECL CONTNG INCGeneral Wiring
03/02/2022CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/29/2022CompleteCAT DEL-V ELECTRIC CORP1 meters, 1 new_meters
01/07/2022CompleteGSA ELECTRIC CORP.—
10/27/2021CompleteGSA ELECTRIC CORP.—
10/26/2021CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
02/03/2021CompleteBALANCE ELEC CONT'G CORP.General Wiring
07/07/2020Permit IssuedSPECTRUM ELECTRIC, LLCGeneral Wiring
1 project · most recent 04/09/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/09/2024Permit IssuedK.E.S. CONSTRUCTION CO INSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/07/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/30/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
03/26/2026Post-installed AnchorsAnthony Stasiospecial
03/26/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
03/26/2026Concrete - Cast-In-PlaceAnthony Stasiospecial
03/26/2026Tenant Protection Plan ComplianceJeff Akermanspecial
03/26/2026Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
03/26/2026MasonryAnthony Stasiospecial
03/26/2026FinalAnthony Stasioprogress
03/16/2026Masonry—special
01/13/2026Concrete - Cast-In-PlaceAnthony Stasiospecial
01/13/2026FinalAnthony Stasioprogress
01/13/2026Tenant Protection Plan Compliance—special
01/13/2026Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
01/13/2026Post-installed AnchorsAnthony Stasiospecial
01/13/2026Fire-Resistant Penetrations and JointsAnthony Stasiospecial
07/30/2025Post-installed AnchorsAnthony Stasiospecial
06/10/2025FinalAnthony Stasioprogress
06/10/2025Tenant Protection Plan ComplianceJeff Akermanspecial
06/10/2025Structural Steel - WeldingAnthony Stasiospecial
06/10/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
06/10/2025Fire-Resistant Penetrations and JointsAnthony Stasiospecial
06/10/2025Concrete - Cast-In-PlaceAnthony Stasiospecial
03/12/2025Fenestration and door U-factor and product ratingsDane Barnesenergy_progress
03/12/2025MasonryDane Barnesspecial
03/12/2025Structural Stability – Alterations of existing buildingsDane Barnesspecial
03/12/2025Tenant Protection Plan ComplianceDane Barnesspecial
Latest 25 of 56.
▾Documents — 596 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch20
09/03/2026B00050688-I1Request digital key ↗
09/01/2026B00483062-I1Request digital key ↗
09/01/2026B00483062-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00171610-I1Request digital key ↗
08/15/2026B00171610-P1Request digital key ↗
▸Applications & Permits92
▸BISWORK PERMIT APPLICATION47
07/15/2022340818128Open ↗
06/17/2021340576665Open ↗
05/04/2021340576665Open ↗
Showing 3 of 47 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION41
01/24/2022340576665Open ↗
09/20/2021340818128Open ↗
07/22/2021340576665Open ↗
Showing 3 of 41 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
01/07/2020321531838Open ↗
Showing 1 of 3 on file for this type
▸BISLimited Alteration Application (LAA1)1
01/10/2020321531838Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/05/2019321958743Open ↗
▸Seals & Professional Certifications133
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION61
01/31/2020321531838Open ↗
01/31/2020321531838Open ↗
01/31/2020321531838Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/03/2026B00050688-I1Open ↗
09/02/2026B00171610-P1Open ↗
09/02/2026B00171610-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026B01117646-I1Open ↗
09/01/2026B01117646-I1Open ↗
09/01/2026B01117646-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B01117646-I1Open ↗
08/31/2026B00483062-P1Open ↗
08/31/2026B00483062-P1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/11/2020340746401Open ↗
06/25/2019321741139Open ↗
Showing 2 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
09/20/2021340818128Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/25/2019321741139Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/11/2020340746401Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
06/03/2019321958743Open ↗
07/12/2018321802386Open ↗
Showing 2 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/17/2020321958743Open ↗
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes11
09/05/2019321958743Open ↗
06/25/2019321741139Open ↗
01/14/2019321843001Open ↗
Showing 3 of 11 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
06/29/2022340818128Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
09/20/2021340818128Open ↗
09/11/2020340746401Open ↗
06/25/2019321741139Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/01/2026B00483062-P1Open ↗
09/01/2026B00483062-I1Open ↗
09/01/2026B00483115-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/19/2019321958743Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/17/2019321958743Open ↗
▸Energy Compliance85
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS44
01/31/2020321531838Open ↗
01/31/2020321531838Open ↗
01/13/2020321531838Open ↗
Showing 3 of 44 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
05/06/2021321528012Open ↗
11/17/2020321958743Open ↗
01/31/2020321531838Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
12/08/2021340818128Open ↗
05/06/2021321528012Open ↗
11/17/2020321958743Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
05/13/2022340576665Open ↗
10/21/2020321802386Open ↗
08/14/2020321741139Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/24/2022340818128Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/11/2020340746401Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/10/2022340576665Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/10/2022340576665Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
09/11/2020340746401Open ↗
▸BISINTERIOR LIGHTING POWER1
05/10/2022340576665Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION AREAS1
05/10/2022340576665Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00483062-I1Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY22
05/17/2022340576665Open ↗
01/25/2022340576665Open ↗
01/24/2022340818128Open ↗
Showing 3 of 22 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/11/2020340746401Open ↗
▸Approvals, Objections & Sign-offs48
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
05/18/2022340576665Open ↗
05/06/2021321528012Open ↗
11/17/2020321958743Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
08/26/2020321741139Open ↗
09/11/2018321802386Open ↗
Showing 2 of 6 on file for this type
▸BISFINAL4
07/13/2022340818128Open ↗
05/10/2022340576665Open ↗
09/11/2020340746401Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT45
05/06/2021321528012Open ↗
11/17/2020321958743Open ↗
09/11/2020340746401Open ↗
Showing 3 of 45 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
04/22/2022340576665Open ↗
10/21/2020321802386Open ↗
09/25/2020321741139Open ↗
▸Filing & Intake Forms56
▸BISADDITIONAL INFORMATION17
02/28/2022340576665Open ↗
01/24/2022340818128Open ↗
12/08/2021340818128Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET16
06/21/2019321741139Open ↗
06/03/2019321958743Open ↗
01/14/2019321843001Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM15
06/17/2021340576665Open ↗
01/31/2020321531838Open ↗
01/13/2020321531838Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
09/20/2021340818128Open ↗
09/11/2020340746401Open ↗
Showing 2 of 8 on file for this type
▸Other Documents7
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
03/19/2019321802386Open ↗
03/19/2019321802386Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B01006567-I1Open ↗
08/13/2026B01006567-P1Open ↗
▸DOB NOWCalculations2
08/13/2026B01006567-P1Open ↗
08/13/2026B01006567-I1Open ↗
▸BISOP-4 - Special Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type