← Back
One family attached or semi-detached
34 SLATER BOULEVARD
STATEN ISLAND · New Dorp-Midland Beach · BIN 5053050
💬 Discuss this project
1975Year Built
2Stories
A5Building Class
R3-1Zoning
1,140 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,240 sf lot · 0.51 FAR built · Flood zone AE
Locations of Work
Architecture
Site & exterior1p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI202/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
Building Lifecycle
All (7)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Inspection (2)
04/23/2024
Signed off — Alteration
REMOVE HRP COMPLAIN: #5180276 AND #5180239; REMOVE DOB VIOLATION: VIO23-02781;REMOVE WOOD SHED AT REAR YARD. REMOVE CONCRETE SLAB AND RESTOREPLANTING AREA. RESTORE CURB CUT 12' WIDE TO 9' WIDE. EXTENCD 4" HEIGHTPLATFORM DECK. NO CHANGE IN USE, EGRESS OR O
S00947722-I1
03/20/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/23/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/05/2024
Filed — Alteration
REMOVE HRP COMPLAIN: #5180276 AND #5180239; REMOVE DOB VIOLATION: VIO23-02781;REMOVE WOOD SHED AT REAR YARD. REMOVE CONCRETE SLAB AND RESTOREPLANTING AREA. RESTORE CURB CUT 12' WIDE TO 9' WIDE. EXTENCD 4" HEIGHTPLATFORM DECK. NO CHANGE IN USE, EGRESS OR O
S00947722-P1
10/23/2023
Permit issued — General Construction
S00947722-I1-GC
10/18/2023
Filed — Alteration
REMOVE HRP COMPLAIN: #5180276 AND #5180239; REMOVE DOB VIOLATION: VIO23-02781;REMOVE WOOD SHED AT REAR YARD. REMOVE CONCRETE SLAB AND RESTOREPLANTING AREA. RESTORE CURB CUT 12' WIDE TO 9' WIDE. EXTENCD 4" HEIGHTPLATFORM DECK. NO CHANGE IN USE, EGRESS OR O
S00947722-I1
10/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC10/23/2023
BISOTISSUEDSUNRUN INSTALLATION SVC12/09/2022
1 project · most recent 12/14/2022
FiledStatusContractorScope
12/14/2022CompleteSUNRUN SOLAR ELECTL CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/20/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/23/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S00947722-P1Request digital key ↗
08/21/2026S00947722-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
06/22/2023540242281Open ↗
06/08/2023540242281Open ↗
12/08/2022540242281Open ↗
▸BISWORK PERMIT APPLICATION1
12/09/2022540242281Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
12/08/2022540242281Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026S00947722-I1Open ↗
08/13/2026S00947722-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/08/2022540242281Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/08/2022540242281Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/08/2022540242281Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
12/09/2022540242281Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/08/2022540242281Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/06/2023540242281Open ↗
12/08/2022540242281Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/06/2023540242281Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
07/07/2023540242281Open ↗
▸BISNYCECC ANALYSIS1
12/08/2022540242281Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
12/08/2022540242281Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/08/2022540242281Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/06/2023540242281Open ↗
12/08/2022540242281Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/07/2023540242281Open ↗
07/07/2023540242281Open ↗
12/08/2022540242281Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/07/2023540242281Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/06/2023540242281Open ↗
12/08/2022540242281Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
06/22/2023540242281Open ↗
12/08/2022540242281Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/08/2022540242281Open ↗