Predominantly retail with other uses
34 WALKER STREET
MANHATTAN · BIN 1002294
💬 Discuss this project
1868Year Built
5Stories
K4Building Class
C6-2AZoning
14,914 sfGross Floor Area
9Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: WALKER STREET OWNER LLC · 3,768 sf lot · 3.96 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 2 docs
Floor 6Under Construction70p · 1 filing · 20 docs
Floor 5Under Construction134p · 1 filing · 20 docs
Floor 4Under Construction142p · 1 filing · 20 docs
Floor 3Under Construction142p · 1 filing · 20 docs
Floor 2Under Construction143p · 2 filings · 20 docs
Floor 1Under Construction141p · 1 filing · 20 docs
CellarUnder Construction148p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROSPER PROPERTY GROUP7709/30/2026
SHAH GROUP ENTERPRISES IN1104/09/2026
TOPLINE NYC CONTRACTING304/09/2026
KNOCKOUT CONSTRUCTION403/22/2026
ELTIBER REALTY CORP803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/27/2025$11.6M—ELTIBE REALTY CORP → WALKER STREET OWNER LLC$778/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1703/21/2026
Rigid Structural Design, LLC403/21/2026
ADVANCED BUILDERS SERVICES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COLGATE ENTERPRISE CORPGeneral Contractor1709/30/2026
FIRST STANDARD CONSTR INCGeneral Contractor1609/15/2026
TOPLINE NYC CONTRACTINGGeneral Contractor1304/09/2026
ARMON MECHANICAL INCFire Protection609/30/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor207/08/2026
ARMON MECHANICAL INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6871808/24/2026
Building Lifecycle
All (195)Filed (34)Permit Issued (50)Signed Off (4)Violation (35)Inspection (20)Objection (22)Special Inspection (30)
09/29/2026
Permit issued — Standpipe
M01049846-S6-EW-SD
09/29/2026
Permit issued — Standpipe
M01049846-S5-EW-SD
09/29/2026
Permit issued — Protection and Mechanical Methods
M01298883-I1-PMM
09/14/2026
Permit issued — General Construction
M01049846-I1-GC
09/14/2026
Permit issued — Sidewalk Shed
M01215776-I1-SH
09/14/2026
Permit issued — Structural
M01049846-S1-ST
09/03/2026
Objection resolved — Addressed
09/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/02/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/27/2026
Objection raised — Other
08/24/2026
Filed — Alteration CO
MECHANICAL WORK FOR PROPOSED ALTERATION AS PER PLANS FILED.
M01049846-P7
08/24/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
RICHARD GREENWALD
08/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Electrical motors and elevators
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Metering
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Shutoff dampers
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Maintenance information
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Interior lighting power
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Exterior lighting power
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Lighting in dwelling units
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Final
RICHARD GREENWALD
08/24/2026
Special inspection requirement — Lighting controls
RICHARD GREENWALD
08/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
08/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Metering
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Lighting in dwelling units
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Lighting controls
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Interior lighting power
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Final
RICHARD GREENWALD
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
08/12/2026
Filed — Alteration CO
MECHANICAL WORK FOR PROPOSED ALTERATION AS PER PLANS FILED.
M01049846-P6
08/05/2026
Filed — Alteration
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01440650-I1
08/05/2026
Permit issued — Protection and Mechanical Methods
M01440650-I1-PMM
07/29/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2026
Signed off — Alteration CO
MECHANICAL WORK FOR PROPOSED ALTERATION AS PER PLANS FILED.
M01049846-S7
07/09/2026
Signed off — Alteration CO
MECHANICAL WORK FOR PROPOSED ALTERATION AS PER PLANS FILED.
M01049846-S8
06/17/2026
Permit issued — Sidewalk Shed
M01215776-I1-SH
06/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2026
Violation issued (ECB, open)
Unknown
06/01/2026
Violation issued (ECB, closed)
Construction
05/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/27/2026
Permit issued — General Construction
M01049846-I1-GC
05/08/2026
Permit issued — Protection and Mechanical Methods
M01229862-I1-PMM
05/06/2026
Permit issued — Plumbing
M01049846-S4-PL
04/21/2026
Permit issued — Sprinklers
M01049846-S5-EW-SP
03/26/2026
Permit issued — Construction Fence
M01215787-I1-FN
03/25/2026
Permit issued — Supported Scaffold
M01215784-I1-SF
03/25/2026
Permit issued — Protection and Mechanical Methods
M01215825-I1-PMM
Latest 60 of 195 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedARMON MECHANICAL INC09/29/2026
DOB NOWStandpipePermit IssuedARMON MECHANICAL INC09/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE ENTERPRISE CORP09/29/2026
DOB NOWGeneral ConstructionPermit IssuedFIRST STANDARD CONSTR INC09/14/2026
DOB NOWSidewalk ShedPermit IssuedCOLGATE ENTERPRISE CORP09/14/2026
DOB NOWStructuralPermit IssuedFIRST STANDARD CONSTR INC09/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE ENTERPRISE CORP08/05/2026
DOB NOWSidewalk ShedPermit IssuedCOLGATE ENTERPRISE CORP06/17/2026
DOB NOWGeneral ConstructionPermit IssuedFIRST STANDARD CONSTR INC05/27/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE ENTERPRISE CORP05/08/2026
DOB NOWPlumbingPermit IssuedARMON MECHANICAL INC05/06/2026
DOB NOWSprinklersPermit IssuedARMON MECHANICAL INC04/21/2026
DOB NOWConstruction FencePermit IssuedCOLGATE ENTERPRISE CORP03/26/2026
DOB NOWSupported ScaffoldPermit IssuedCOLGATE ENTERPRISE CORP03/25/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE ENTERPRISE CORP03/25/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE ENTERPRISE CORP03/25/2026
DOB NOWSidewalk ShedPermit IssuedCOLGATE ENTERPRISE CORP03/25/2026
DOB NOWStructuralPermit IssuedFIRST STANDARD CONSTR INC03/12/2026
DOB NOWMechanical SystemsPermit IssuedFIRST STANDARD CONSTR INC03/06/2026
DOB NOWSupport of ExcavationSigned-offFIRST STANDARD CONSTR INC03/06/2026
DOB NOWFoundationSigned-offFIRST STANDARD CONSTR INC03/05/2026
DOB NOWGeneral ConstructionPermit IssuedFIRST STANDARD CONSTR INC02/02/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE ENTERPRISE CORP10/08/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE ENTERPRISE CORP05/27/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE ENTERPRISE CORP04/30/2025
DOB NOWSupported ScaffoldPermit IssuedCOLGATE ENTERPRISE CORP04/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCOLGATE ENTERPRISE CORP04/29/2025
DOB NOWConstruction FencePermit IssuedCOLGATE ENTERPRISE CORP04/28/2025
DOB NOWSidewalk ShedPermit IssuedCOLGATE ENTERPRISE CORP04/25/2025
DOB NOWStandpipePermit IssuedARMON MECHANICAL INC04/18/2025
DOB NOWSprinklersPermit IssuedARMON MECHANICAL INC04/18/2025
DOB NOWStandpipePermit IssuedARMON MECHANICAL INC04/18/2025
DOB NOWPlumbingPermit IssuedARMON MECHANICAL INC04/18/2025
DOB NOWGeneral ConstructionPermit IssuedFIRST STANDARD CONSTR INC04/01/2025
DOB NOWFoundationPermit IssuedFIRST STANDARD CONSTR INC03/31/2025
DOB NOWMechanical SystemsPermit IssuedFIRST STANDARD CONSTR INC03/31/2025
DOB NOWFoundationSigned-offFIRST STANDARD CONSTR INC03/28/2025
DOB NOWStructuralPermit IssuedFIRST STANDARD CONSTR INC03/28/2025
DOB NOWSupport of ExcavationSigned-offFIRST STANDARD CONSTR INC03/28/2025
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING10/05/2023
+ 14 more permits on file
1 project · most recent 08/24/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Permit IssuedFIRST STANDARD CONSTR INCHeating and Air Conditioning Systems
Heat / Cool
Daikin FXSQ36TBVJU 36,000 BTU · Vrf Indoor ×20
REYQ96AATJA 96,000 BTU · Vrf Outdoor ×22
REYQ120AATJA 120,000 BTU · Vrf Outdoor ×2
REYQ72AATJA 72,000 BTU · Vrf Outdoor ×2
RXTQ60TBVJUB 60,000 BTU · Vrf Outdoor ×2
RZR24TBVJUB 24,000 BTU · Condensing Unit ×2
RXTQ60TAVJUA 57,500 BTU · Vrf Outdoor ×2
1 project · most recent 08/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/24/2026Permit IssuedARMON MECHANICAL INCStorm, Water/Sanitary
6 projects · most recent 11/18/2025
General Wiring
FiledStatusContractorScope
11/18/2025Permit IssuedNASH ELECTRIC SERVICES IN—
07/02/2025Permit IssuedTF ELECTRICAL CORPGeneral Wiring
06/16/2025Permit IssuedFSM ELECTRICAL CORPORATIOGeneral Wiring
05/07/2025Permit IssuedFSM ELECTRICAL CORPORATIO—
10/10/2023CompleteSOLAS ELECTRICAL CORP—
01/20/2019CompleteRICHARD NEU—
1 project · most recent 08/24/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/24/2026Permit IssuedARMON MECHANICAL INCSteel, Concrete, Masonry
5 projects · most recent 12/04/2025
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
12/04/2025Permit IssuedCOLGATE ENTERPRISE CORPSidewalk Shed
10/07/2025Permit IssuedCOLGATE ENTERPRISE CORPScaffold
08/25/2025Permit IssuedCOLGATE ENTERPRISE CORPFence
01/22/2019Permit IssuedTOPLINE NYC CONTRACTINGScaffold
01/21/2019Permit IssuedTOPLINE NYC CONTRACTINGSidewalk Shed
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
09/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/02/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/29/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/03/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/17/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/04/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/04/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 132
DateRequirementInspectorRole
08/24/2026MeteringRICHARD GREENWALDenergy_progress
08/24/2026Maintenance informationRICHARD GREENWALDenergy_progress
08/24/2026Duct leakage testing, insulation and designRICHARD GREENWALDenergy_progress
08/24/2026Electrical motors and elevatorsRICHARD GREENWALDenergy_progress
08/24/2026Shutoff dampersRICHARD GREENWALDenergy_progress
08/24/2026HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
08/24/2026HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
08/24/2026Exhaust and Vent Systems in Plenums and DuctsRICHARD GREENWALDspecial
08/24/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
08/24/2026Mechanical SystemsRICHARD GREENWALDspecial
08/24/2026Post-installed AnchorsRICHARD GREENWALDspecial
08/24/2026Energy Code Compliance InspectionsRICHARD GREENWALDprogress
08/24/2026FinalRICHARD GREENWALDprogress
08/24/2026HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
08/24/2026Lighting controlsRICHARD GREENWALDenergy_progress
08/24/2026Exterior lighting powerRICHARD GREENWALDenergy_progress
08/24/2026Lighting in dwelling unitsRICHARD GREENWALDenergy_progress
08/24/2026Interior lighting powerRICHARD GREENWALDenergy_progress
08/18/2026FinalRICHARD GREENWALDprogress
08/18/2026Energy Code Compliance InspectionsRICHARD GREENWALDprogress
08/18/2026Lighting controlsRICHARD GREENWALDenergy_progress
08/18/2026HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
08/18/2026MeteringRICHARD GREENWALDenergy_progress
08/18/2026Lighting in dwelling unitsRICHARD GREENWALDenergy_progress
08/18/2026Interior lighting powerRICHARD GREENWALDenergy_progress
Latest 25 of 132.
▾Documents — 326 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch31
08/29/2026M00941115-I1Request digital key ↗
08/26/2026M01049846-S4Request digital key ↗
08/26/2026M01049846-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00122378-P1Request digital key ↗
09/04/2026M00451739-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits21
▸DOB NOWLPC Approval/Permit16
08/26/2026M01049846-P7Open ↗
08/26/2026M01049846-P6Open ↗
Showing 2 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
03/14/2025141026486Open ↗
08/27/2019122923774Open ↗
06/07/2012120474619Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
09/18/2019122923774Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram4
08/26/2026M01049846-I1Open ↗
08/26/2026M01049846-P1Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/26/2026M01049846-I1Open ↗
08/26/2026M01049846-P1Open ↗
Showing 2 of 3 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
02/05/2026121254258Open ↗
03/14/2025141026486Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/05/2026121254258Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/05/2026121254258Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/05/2026121254258Open ↗
▸Seals & Professional Certifications173
▸DOB NOWProgress Inspector Seal & Signature89
09/30/2026M01049846-S4Open ↗
09/30/2026M01049846-S4Open ↗
09/30/2026M01049846-S4Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/30/2026M01049846-S4Open ↗
09/30/2026M01049846-S4Open ↗
09/30/2026M01049846-S4Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/05/2026M00121483-I1Open ↗
09/05/2026M00122378-I1Open ↗
08/29/2026M00941115-I1Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/27/2019122923774Open ↗
09/22/2010120474619Open ↗
09/22/2010120474619Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/27/2019122923774Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/14/2025141026486Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/27/2019122923774Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/14/2025141026486Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFDNY: Letter of No Objection1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
03/14/2025141026486Open ↗
▸BISSTREET TREE CHECKLIST1
03/14/2025141026486Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos38
▸DOB NOWOER: Notice to Proceed15
08/26/2026M01049846-S4Open ↗
08/26/2026M01049846-I1Open ↗
08/26/2026M01049846-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
08/26/2026M01049846-S4Open ↗
08/26/2026M01049846-S5Open ↗
08/26/2026M01049846-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/26/2026M01049846-S4Open ↗
08/26/2026M01049846-S1Open ↗
08/26/2026M01049846-S8Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/22/2010120474619Open ↗
09/22/2010120474619Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
03/14/2025141026486Open ↗
09/16/2019122923774Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
03/04/2022122923774Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/27/2019122923774Open ↗
▸Energy Compliance6
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/19/2022122923774Open ↗
▸BISFENESTRATION AREAS1
04/19/2022122923774Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/19/2022122923774Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/19/2022122923774Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/27/2019122923774Open ↗
▸BISFENESTRATION AIR LEAKAGE1
04/19/2022122923774Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISLANDMARKS APPROVAL2
03/14/2025141026486Open ↗
09/18/2019122923774Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/20/2022122923774Open ↗
▸BISLANDMARKS SIGNOFF1
03/31/2022122923774Open ↗
▸BISFINAL1
04/19/2022122923774Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/22/2010120474619Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/17/2026121254258Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
08/27/2019122923774Open ↗
09/22/2010120474619Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/19/2022122923774Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
08/27/2019122923774Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/14/2025141026486Open ↗
▸Other Documents15
▸DOB NOWPlot Diagram6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWProperty Ownership Certification2
08/26/2026M01049846-I1Open ↗
08/26/2026M01049846-P1Open ↗
▸DOB NOWSite Survey: Initial2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
02/05/2026121254258Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
03/14/2025141026486Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type