34 WEST END AVENUE · BIN 3326901
💬 Discuss this project
1951Year Built
7Stories
M1Building Class
R6Zoning
116,264 sfGross Floor Area
1Units
LL97 Covered16 Open Violations 6 unresolved · 10 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Church, synagogue, chapel · 44,793 sf lot · 2.6 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 2Under Construction6p · 3 filings · 20 docs
Floor 1Under Construction10p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
S J CONSTRUCTION SERVIC307/04/2026
814LLC504/09/2026
EQUEST BUILDERS CORP503/22/2026
T-MOBILE303/22/2026
S & J CONSTRUCTION SERVIC203/22/2026
NAW CONSTRUCTION403/22/2026
NESPO DEVELOPERS103/22/2026
BILLY ENTERPRISES203/21/2026
MANHATTAN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RS DESIGN ASSOCIATES203/21/2026
ADAM BERGMAN CONSTRUCTION AND DEVEL403/21/2026
JACK JAFFA & ASSOCIATES403/21/2026
RPO403/21/2026
BILTMORE GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
T.G. NEW YORK CONSTRUCTORGeneral Contractor603/21/2026
EQUEST BUILDERS CORPGeneral Contractor303/21/2026
NAW CONSTRUCTION CO INCGeneral Contractor303/21/2026
GOTHAM COMMUNICATIONS LLCGeneral Contractor303/21/2026
BENJAMIN DREBINElectrical203/21/2026
PLATINUM TNT LLCGeneral Contractor203/21/2026
A. HTG AND PLBG WORKS INCPlumbing207/08/2026
MEGA PLBG CORPPlumbing207/08/2026
SPADARO, JERRYElectrical103/21/2026
SPEZIALE, JOSEPHElectrical103/21/2026
THOMAS JOCELYN IIIElectrical103/21/2026
VITALE, JOSEPHElectrical103/21/2026
JOSEPH VITALEElectrical103/21/2026
ISAAC STEINBERGElectrical103/21/2026
HEIGHTS CONSTRUCTION SERVGeneral Contractor106/28/2026
LKC GROUPGeneral Contractor104/09/2026
INTERBORO PLBG & HTG CORPElectrical103/21/2026
BROOKLYN MECH WORKS CORPPlumbing107/08/2026
S & J CONSTRUCTION SVCGeneral Contractor107/04/2026
CROCITTO, JR., WILLIAMElectrical103/21/2026
KANE, PAPAElectrical103/21/2026
MAGALLANES, ROBERTOElectrical103/21/2026
MELVYN ZWEBNERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930208/19/2026
SKYLINE ENGINEERING, PLLC267208/08/2023
BIZ DESIGNS LLC6312406/29/2023
STEEL CORE ENGINEERING PL1098306/29/2023
GBN ENGINEERING LLC4670112/02/2022
GONY ARCHITECT & PLNNER P3629109/06/2022
Building Lifecycle
All (194)Filed (17)Permit Issued (15)Signed Off (5)Facade (FISP) (18)Violation (60)Inspection (19)Objection (30)Special Inspection (30)
08/19/2026
Filed — Alteration
FACADE REPAIRS
B01076955-P1
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Jabour
08/19/2026
Special inspection requirement — Final
Joseph Jabour
08/19/2026
Special inspection requirement — Masonry
Joseph Jabour
08/18/2026
Special inspection requirement — Masonry
Joseph Jabour
08/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Jabour
08/18/2026
Special inspection requirement — Final
Joseph Jabour
07/08/2026
Violation issued (ECB, open)
Construction
06/19/2026
Cycle 9 facade inspection completed
05/29/2026
Signed off — Alteration
GAS TO GAS REPLACEMENT . RECONNECT EXISTING GAS LINE TO REPLACEMENT BURNER AND REPLACE GAS TRAIN .
B01239180-I1
05/21/2026
Violation issued (ECB, open)
Construction
04/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Cycle 9 facade report submitted
04/24/2026
Filed — Alteration
GAS TO GAS REPLACEMENT . RECONNECT EXISTING GAS LINE TO REPLACEMENT BURNER AND REPLACE GAS TRAIN .
B01239180-P1
04/21/2026
Signed off — Alteration
BOILER AND BURNER REPLACEMENT .
B01238984-I1
04/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/26/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/24/2026
Violation issued (FDNY_NOV, closed)
03/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/13/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/24/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/13/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/09/2025
Permit issued — Plumbing
B00450729-I1-PL
09/18/2025
Permit issued — Sidewalk Shed
B01056866-I1-SH
09/11/2025
Violation issued (FDNY_NOV, closed)
08/12/2025
Permit issued — Mechanical Systems
B00447173-I1-MS
08/01/2025
Permit issued — Boiler Equipment
B01238984-I1-BE
08/01/2025
Permit issued — Plumbing
B01239180-I1-PL
07/02/2025
Objection resolved — Addressed
07/02/2025
Objection resolved — Addressed
07/02/2025
Objection resolved — Addressed
06/23/2025
Objection raised — Plumbing
06/23/2025
Objection raised — Cost
06/23/2025
Objection raised — Plumbing
06/11/2025
Filed — Alteration
GAS TO GAS REPLACEMENT . RECONNECT EXISTING GAS LINE TO REPLACEMENT BURNER AND REPLACE GAS TRAIN .
B01239180-I1
06/11/2025
Filed — Alteration
BOILER AND BURNER REPLACEMENT .
B01238984-I1
06/10/2025
Special inspection requirement — Maintenance information
HOWARD KRIGSMAN
06/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
HOWARD KRIGSMAN
06/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
HOWARD KRIGSMAN
06/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
HOWARD KRIGSMAN
03/16/2025
Violation issued (ECB, open)
Construction
03/16/2025
Violation issued (ECB, closed)
Construction
03/16/2025
Violation issued (ECB, closed)
Unknown
03/16/2025
Violation issued (ECB, open)
Site Safety
01/14/2025
Violation issued (FDNY_ORDER, closed)
01/08/2025
Permit issued — General Construction
B01076955-I1-GC
09/24/2024
Cycle 9 facade report submitted
09/22/2024
Cycle 9 facade report signed — UNSAFE
08/01/2024
Violation issued (ECB, open)
Construction
07/29/2024
Cycle 9 facade inspection completed
07/23/2024
Filed — Alteration
FACADE REPAIRS
B01076955-I1
06/05/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/03/2024
Cycle 9 facade report signed — UNSAFE
Latest 60 of 194 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMEGA PLBG CORP12/09/2025
DOB NOWSidewalk ShedPermit IssuedHEIGHTS CONSTRUCTION SERV09/18/2025
DOB NOWMechanical SystemsPermit IssuedLKC GROUP08/12/2025
DOB NOWBoiler EquipmentSigned-offD.H. EAGLE PLUMBING, LLC08/01/2025
DOB NOWPlumbingSigned-offD.H. EAGLE PLUMBING, LLC08/01/2025
DOB NOWGeneral ConstructionPermit IssuedNAW CONSTRUCTION CO INC01/08/2025
DOB NOWSidewalk ShedPermit IssuedS & J CONSTRUCTION SVC05/30/2024
DOB NOWGeneral ConstructionPermit IssuedJ.GOLD CONSTRUCTION CONS12/07/2023
DOB NOWPlumbingSigned-offBROOKLYN MECH WORKS CORP02/27/2023
DOB NOWAntennaSigned-offGOTHAM COMMUNICATIONS LLC02/10/2023
DOB NOWGeneral ConstructionSigned-offPLATINUM TNT LLC01/03/2023
DOB NOWGeneral ConstructionPermit IssuedJ.GOLD CONSTRUCTION CONS12/06/2022
DOB NOWGeneral ConstructionPermit IssuedJ.GOLD CONSTRUCTION CONS09/29/2022
DOB NOWPlumbingPermit IssuedMEGA PLBG CORP08/29/2022
DOB NOWGeneral ConstructionPermit IssuedEQUEST BUILDERS CORP11/27/2021
BISSPISSUEDSAFETY FIRE SPRINKLER CORP05/24/2021
BISPLISSUEDJODOM MECHANICAL, INC07/19/2017
BISOTISSUEDSHAARE ZION DECOR LLC10/28/2016
BISPLISSUEDJODOM MECHANICAL, INC08/10/2016
BISOTISSUEDNESPO DEVELOPERS LLC03/28/2016
BISOTISSUEDNESPO DEVELOPERS LLC02/23/2016
BISEQISSUEDBILLY ENTERPRISES INC08/05/2015
BISMHISSUEDPERFECTAIRE CO INC06/11/2015
BISBLISSUEDSERVICE TECH MECH&PLBG IN04/14/2015
BISPLISSUEDSERVICE TECH MECH&PLBG IN02/27/2015
BISMHISSUEDPERFECTAIRE CO INC02/10/2015
BISOTISSUEDODYSSIA GLOBAL COMM. CORP07/17/2012
BISOTISSUEDCOSTROTTA CONSTRUCT MG IN05/03/2012
BISBLISSUEDSERVICE TECH MECH&PLBG IN10/21/2011
BISMHISSUEDPERFECTAIRE CO INC10/03/2011
BISPLISSUEDSERVICE TECH MECH&PLBG IN10/03/2011
BISMHISSUEDPERFECTAIRE CO INC06/10/2011
BISOTISSUEDV & G CUSTOM BUILDERS09/20/2010
BISOTISSUEDTRINITY TECHNOLOGIES LLC03/12/2010
BISOTISSUEDBCI COMMUNICATIONS INC01/02/2007
BISOTISSUEDBCI COMMUNICATIONS INC10/24/2006
BISSPISSUEDCAPITOL FIRE SPKL CO,INC11/25/2003
BISMHISSUEDPERFORMANCE MECHANCIAL05/20/2003
BISPLISSUEDARIEL SERVICES INC05/07/2003
BISPLISSUEDARIEL SERVICES INC04/14/2003
+ 15 more permits on file
2 projects · most recent 04/24/2026
Gas
FiledStatusContractorScope
04/24/2026Signed-offA. HTG AND PLBG WORKS INCGas
08/08/2023Permit IssuedMEGA PLBG CORPGas
5 projects · most recent 06/24/2025
Boiler Controls General Wiring
FiledStatusContractorScope
06/24/2025CompleteHI-LIGHTS ELECTRICALBoiler Controls
05/31/2024Permit IssuedRICHARD NEU—
08/31/2022CompleteGREEN STAR ELECTL CONT IN—
02/16/2021CompleteNET POWER ELECTRIC CORP2 meters, 2 new_meters
11/19/2020CompleteNET POWER ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
04/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/13/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/24/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/13/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/24/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
08/19/2026Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
08/19/2026FinalJoseph Jabourprogress
08/19/2026MasonryJoseph Jabourspecial
08/18/2026MasonryJoseph Jabourspecial
08/18/2026Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
08/18/2026FinalJoseph Jabourprogress
06/10/2025Maintenance informationHOWARD KRIGSMANenergy_progress
06/10/2025HVAC-R and service water heating system controlsHOWARD KRIGSMANenergy_progress
06/10/2025HVAC-R and service water piping design and insulationHOWARD KRIGSMANenergy_progress
06/10/2025HVAC-R and service water heating equipmentHOWARD KRIGSMANenergy_progress
07/06/2023Fire-Resistant Penetrations and JointsJeff Akermanspecial
07/06/2023Post-installed AnchorsAlexander Sheymanspecial
06/23/2023Fire-Resistant Penetrations and JointsJeff Akermanspecial
06/23/2023Post-installed AnchorsAlexander Sheymanspecial
02/20/2023Post-installed Anchors—special
02/08/2023Fire-Resistant Penetrations and JointsJeff Akermanspecial
08/23/2022Mechanical Systems—special
08/23/2022Fire-Resistant Penetrations and Joints—special
08/23/2022Final—progress
08/23/2022Energy Code Compliance Inspections—progress
08/23/2022HVAC-R and service water heating equipment—energy_progress
08/23/2022HVAC-R and service water piping design and insulation—energy_progress
08/23/2022Maintenance information—energy_progress
08/23/2022HVAC-R and service water heating system controls—energy_progress
08/22/2022Interior lighting powerVitaly Ganopolskyenergy_progress
Latest 25 of 30.
▾Documents — 220 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch14
08/31/2026B00629423-I1Request digital key ↗
08/28/2026B00797855-I1Request digital key ↗
08/28/2026B08040815-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026B00450729-I1Request digital key ↗
08/27/2026B00450729-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00447173-I1Request digital key ↗
▸Applications & Permits38
▸BISWORK PERMIT APPLICATION20
01/20/2022340466034Open ↗
05/24/2021340466034Open ↗
07/19/2017340449465Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
12/20/2018322065956Open ↗
03/10/2017321537100Open ↗
01/25/2017340466034Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
09/07/2016321316367Open ↗
02/24/2016321316367Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
01/25/2017340466034Open ↗
▸Seals & Professional Certifications66
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00447173-I1Open ↗
08/31/2026B00629423-I1Open ↗
08/28/2026B00797855-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
12/20/2018322065956Open ↗
03/10/2017321537100Open ↗
02/25/2016320467277Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/18/2026B01238984-I1Open ↗
09/18/2026B01238984-I1Open ↗
09/18/2026B01238984-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B08040815-P1Open ↗
08/26/2026B08040815-P2Open ↗
08/26/2026B08040815-P2Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/20/2018322065956Open ↗
01/25/2017340466034Open ↗
12/02/2016340449465Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/20/2018322065956Open ↗
02/25/2016321316367Open ↗
08/21/2015340213619Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
01/25/2017340466034Open ↗
12/02/2016340449465Open ↗
08/04/2015340287772Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
01/25/2017340466034Open ↗
12/02/2016340449465Open ↗
08/04/2015340287772Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/13/2011320318937Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING5
01/25/2017340466034Open ↗
12/02/2016340449465Open ↗
02/05/2015340213619Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS2
12/28/2011320318937Open ↗
12/28/2011320318937Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
02/05/2015340213619Open ↗
09/22/2011320401141Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/28/2011320318937Open ↗
12/28/2011320318937Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/25/2016321316367Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/27/2015340213619Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/20/2018322065956Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/28/2026B00797855-I1Open ↗
08/28/2026B08040815-I1Open ↗
08/28/2026B08040815-P2Open ↗
Showing 3 of 12 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
02/27/2015340213619Open ↗
02/05/2015340213619Open ↗
09/22/2011320401141Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/10/2017321537100Open ↗
01/25/2017340466034Open ↗
12/02/2016340449465Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
04/25/2012320467277Open ↗
01/29/2010320123638Open ↗
11/06/2009320091397Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
09/22/2011320401141Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY4
12/28/2011320318937Open ↗
10/06/2011320401141Open ↗
09/22/2011320401141Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/20/2018322065956Open ↗
02/25/2016320467277Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
02/25/2016320467277Open ↗
12/28/2011320318937Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/05/2015340213619Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/05/2015340213619Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
02/18/2021340466034Open ↗
02/12/2021340466034Open ↗
01/25/2017340466034Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/01/2026B00447173-I1Open ↗
08/27/2026B00450729-I1Open ↗
08/27/2026B00450729-P1Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
04/25/2012320467277Open ↗
09/22/2011320401141Open ↗
06/13/2011320318937Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/25/2016320467277Open ↗
01/06/2012320318937Open ↗
11/28/2011320318937Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
10/28/2016321316367Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
12/20/2018322065956Open ↗
03/10/2017321537100Open ↗
01/25/2017340466034Open ↗
Showing 3 of 15 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
07/19/2017340449465Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET5
12/19/2018322065956Open ↗
03/10/2017321537100Open ↗
02/25/2016321316367Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
01/25/2017340466034Open ↗
12/02/2016340449465Open ↗
08/04/2015340287772Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
08/04/2015340287772Open ↗
08/04/2015340287772Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
01/25/2017340466034Open ↗