← Back
Five to six families
340 DEVOE STREET
BROOKLYN · BIN 3327862
💬 Discuss this project
1920Year Built
2Stories
C2Building Class
M1-1Zoning
5,750 sfGross Floor Area
5Units
Rent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: 340 DEVOE LLC · 3,283 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
Floor 11p · 1 filing · 6 docs
Basement1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BIG DREAM DEVELOPERS503/22/2026
340 DEVOE LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2020$1.8M—— → —$317/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRAMODRAY SHAH, P.E.106/05/2023
R AND O ENGINEERING. P.C.102/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OWNERS GC NY LLCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524106/05/2023
HRF SERVICES CORP5616102/10/2021
Building Lifecycle
All (73)Filed (2)Permit Issued (2)Signed Off (2)Violation (58)Special Inspection (9)
03/07/2024
Signed off — Alteration
minor structural work at 2nd floor, no change in use ,egress, or occupancy.
B00465795-I1
10/12/2023
Violation issued (HPD, closed)
B
10/12/2023
Violation issued (HPD, closed)
B
10/12/2023
Violation issued (HPD, closed)
B
10/12/2023
Violation issued (HPD, closed)
B
07/06/2023
Signed off — Alteration
Proposed interior renovation to an existing two (2) story + basement residential use building. No change to use, occupancy or egress with this application.
B00877551-I1
06/21/2023
Permit issued — General Construction
B00877551-I1-GC
06/05/2023
Filed — Alteration
Proposed interior renovation to an existing two (2) story + basement residential use building. No change to use, occupancy or egress with this application.
B00877551-I1
05/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
05/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/18/2023
Special inspection requirement — Interior lighting power
Shahrish Shuvo
05/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
05/18/2023
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
05/18/2023
Special inspection requirement — Final
Shahrish Shuvo
05/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
01/12/2023
Violation issued (HPD, closed)
C
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
C
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
C
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
C
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
A
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
B
01/12/2023
Violation issued (HPD, closed)
A
11/07/2022
Violation issued (HPD, closed)
I
05/08/2022
Violation issued (HPD, closed)
A
05/08/2022
Violation issued (HPD, closed)
A
05/08/2022
Violation issued (HPD, closed)
A
05/08/2022
Violation issued (HPD, closed)
B
05/08/2022
Violation issued (HPD, closed)
A
05/08/2022
Violation issued (HPD, closed)
C
05/08/2022
Violation issued (HPD, closed)
A
05/08/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (HPD, closed)
A
04/08/2021
Violation issued (HPD, closed)
I
02/12/2021
Permit issued — General Construction
B00465795-I1-GC
02/10/2021
Filed — Alteration
minor structural work at 2nd floor, no change in use ,egress, or occupancy.
B00465795-I1
02/04/2021
Special inspection requirement — Final
FAHAD FATEH
02/04/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOWNERS GC NY LLC06/21/2023
DOB NOWGeneral ConstructionSigned-offOWNERS GC NY LLC02/12/2021
2 projects · most recent 10/20/2020
General Wiring
FiledStatusContractorScope
10/20/2020Permit IssuedBLZ ELECTRIC INC.General Wiring
03/27/2020CancelledROME ELECTRICAL CONTS INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
05/19/2023Tenant Protection Plan ComplianceShahrish Shuvospecial
05/18/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/18/2023Interior lighting powerShahrish Shuvoenergy_progress
05/18/2023Fire-Resistance Rated ConstructionShahrish Shuvoprogress
05/18/2023Lighting in dwelling unitsShahrish Shuvoenergy_progress
05/18/2023FinalShahrish Shuvoprogress
05/18/2023Energy Code Compliance InspectionsShahrish Shuvoprogress
02/04/2021FinalFAHAD FATEHprogress
02/04/2021Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch1
08/27/2026B00877551-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00465795-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00465795-I1Open ↗
08/22/2026B00877551-I1Open ↗
08/22/2026B00877551-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00465795-I1Open ↗
08/13/2026B00877551-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00465795-I1Open ↗
08/22/2026B00877551-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00465795-I1Open ↗
08/13/2026B00877551-I1Open ↗