HPD06/10/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH, THE BATHROOM LOCATED AT APT 23, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD06/08/2026§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CONNECTION BETWEEN INTERCOM PANEL AT ENTRANCE OF BUILDING AND INTERCOM PANEL AT SOUTH WALL IN THE FOYER LOCATED AT APT 5, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
HPD06/03/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 21, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/03/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 21, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/03/2026§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 21, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/03/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 21, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/03/2026§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 21, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/03/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 21, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/03/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL IN THE BATHROOM LOCATED AT APT 21, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/03/2026§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 21, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD05/15/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 7, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD03/03/2026§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANES AT UPPER AND LOWER SASH AT WINDOW AT SOUTH AT PUBLIC HALL STAIRS, 2nd STORY
DOB02/28/2026STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE AT GROUND LEVEL COMMERCIAL SPACE. AT THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE,WATER AND SMOKE DAMAGE AT GROUND FLOOR COMMERCIAL SPACE AND ALSO TO 6 RESIDENTIAL UNITS. WINDOWS REMOVED AND SOME CHARRING TO NON STRUCTURAL MEMBERS OF THE STRUCTURE.
HPD02/08/2025§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM CONNECTION FROM BUILDING ENTRANCE DOOR TO INTERCOM PANEL AT EAST WALL IN THE FOYER LOCATED AT APT 21, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
HPD06/18/2023§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 23, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD06/18/2023§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM FROM NORTH, THE PRIVATE HALLWAY LOCATED AT APT 23, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD11/05/2022§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 14, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD10/03/2022HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 14, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD10/03/2022HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 14, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD09/30/2022§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
HPD09/30/2022§ 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
HPD12/28/2012§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEYED LOCKSET AT THE DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE ENTIRE APARTMENT LOCATED AT APT 4, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
HPD12/31/2006§ 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER
ECB05/28/2026W/O A PERMIT. NOTED: AT 2ND FLR APT 6 - WINDOW FRAMES & STOOLS WERE OBSERVED REPLACED THROUGHOUT THE APT AT MULTIPLE WINDOWS., OBTAIN ALL PERMITSHearing held — result not yet published$1K proposed
ECB05/28/2026W/O A PERMIT. NOTED: WATER & WASTE LINES REMOVED FOR BTHRM SINK IN APT 19., OBTAIN ALL PERMITSHearing held — result not yet published$1K proposed
ECB05/28/2026FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER PER 28-207.4. NOTED: AT TIME OF INSPECTION - APTS 13, 19, 20 WERE OBSERVED RE-OCCUPIED BY MALE & FEMALE OCCUPANTS CONTRARY TO VACATE ORDER X58/2026., COMPLYHearing held — result not yet published$10K proposed
ECB02/15/2018OCCUPANCY IN CONTRARY TO THAT ALLOWED BY C/O OR DEPT OF BLDG RECODS. ILLEGALLY CREATED B-ROOM AT CELLAR WITH FULL KITCHEN INCREASIENG BLDG OCCUPANCY. PARTITIONS MAD EUP OF WOOD/METAL STUD AND SHEETROCK PLASTERNothing owed — awaiting certificate of correction