💬 Discuss this project
1941Year Built
9Stories
D7Building Class
R8BZoning
51,338 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized2 Active Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: Crefma1 340 East 52nd Owner · 8,034 sf lot · 6.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects3 filings
PenthouseUnit PH5, Unit PH63p · 4 filings
Floor 8Unit 8F, Unit 8AB7p · 5 filings · 20 docs
Floor 7Unit 7C, Unit 7D8p · 6 filings · 20 docs
Floor 6Unit 6H11p · 6 filings · 20 docs
Floor 5Unit 5B, Unit 5C, Unit 5F8p · 4 filings
Floor 4Unit 4B, Unit 4D8p · 6 filings
Floor 3Unit 3B, Unit 3C, Unit 3D +27p · 5 filings
Floor 2Unit 2A, Unit 2C, Unit 2F +110p · 5 filings · 20 docs
Floor 1Unit 1D, Unit 1F, Unit 1G +17p · 3 filings · 20 docs
CellarCellar restroom plumbing3p · 3 filings
Site & exteriorSidewalk shed installation2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Slate PG8807/08/2026
340 E52ND St C/O Rose Associate6703/21/2026
340 East 52nd Street4703/21/2026
56 7th Avenue303/21/2026
Avj Realty303/21/2026
340 E 52 St203/21/2026
Crefma1 340 East 52nd Owner103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/26/2022$28.9M—— → —$562/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Grasso-Menziuso Architects3603/18/2025
New Age611/19/2024
Paul Golden Architect205/14/2024
Severud Associates204/01/2024
Nicholas J. Defelice, P.E210/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CH Building Consultants403/21/2026
JM Zoning9003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri ContractingGeneral Contractor1507/08/2026
Zapas ConstructionPlumbing1107/08/2026
Eca DevelopersGeneral Contractor1007/08/2026
Danube Electric CoElectrical703/22/2026
Central Construction ManagementScaffold207/08/2026
CBB PlumbingPlumbing107/08/2026
CBB PlumbingFire Protection107/08/2026
Norway ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK Engineering6784003/18/2025
New Age Engineering7746711/19/2024
Building Lifecycle
All (252)Filed (47)Permit Issued (36)Signed Off (22)Facade (FISP) (14)Violation (59)Inspection (20)Objection (24)Special Inspection (30)
07/15/2026
Violation issued (HPD, open)
A
07/29/2025
Signed off — Alteration
M00843115-I1
07/29/2025
Signed off — Alteration
Create core penetrations through existing cinder concrete slab for electrical conduits, on all floors (1 through 8+ PH). No additional framing or reinforcing is required if spacing requirements shown on S-101 are followed.
M00857626-I1
07/03/2025
Signed off — Alteration
Proposed to renovate units on 1st, 2nd, 6th, 7th, 8th floor including units 1H, 2A, 2F, 6, 7D, 8F, 8G. No change in use, egress or occupancy.
M00834284-S1
04/24/2025
Signed off — Alteration
Replace, relocate and add new plumbing fixtures in 2nd through penthouse. No change in use, egress or occupancy.
M08047978-I1
03/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
03/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
03/20/2025
Signed off — Alteration
Interior renovation of units on the 1st, 3rd, 5th, 6th, 7th, 8th and Penthouse. Work to includes units 1D, 3H, 5F, 7C, 6H, 8AB, 8D, PHA, 5F. No change in use, occupancy or egress.
M00861002-S1
03/18/2025
Filed — Alteration
Proposed to renovate units on 1st, 2nd, 6th, 7th, 8th floor including units 1H, 2A, 2F, 6, 7D, 8F, 8G. No change in use, egress or occupancy.
M00834284-P3
03/18/2025
Violation issued (FDNY_NOV, closed)
03/07/2025
Signed off — Alteration
Replace and add new plumbing fixtures for apartments located at the 1st floor. No change in use, egress or occupancy.
M00997389-S1
03/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
03/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
03/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
03/06/2025
Special inspection requirement — Lighting controls
Ari Kamo
03/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
03/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
03/03/2025
Filed — Alteration CO
Mechanical work filed in conjunction with ALT CO to install new HVAC system as per plans.
M00992452-P6
03/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
02/27/2025
Filed — Alteration
Replace, relocate and add new plumbing fixtures in 2nd through penthouse. No change in use, egress or occupancy.
M08047978-P2
02/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
02/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
02/25/2025
Special inspection requirement — Lighting controls
Ari Kamo
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
02/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
02/12/2025
Filed — Alteration
Interior renovation of units on the 1st, 3rd, 5th, 6th, 7th, 8th and Penthouse. Work to includes units 1D, 3H, 5F, 7C, 6H, 8AB, 8D, PHA, 5F. No change in use, occupancy or egress.
M00861002-P3
02/11/2025
Signed off — Alteration
Plumbing job filed in conjunction with GC application to replace, relocate and add new plumbing fixture in units 2C,3B,3C,4B,5B,5C,6B,6C,7AB,8C.
M00793978-S1
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
02/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
02/05/2025
Signed off — Alteration
M00964208-I1
02/04/2025
Filed — Alteration
Replace and add new plumbing fixtures for apartments located at the 1st floor. No change in use, egress or occupancy.
M00997389-P3
01/23/2025
Signed off — Alteration CO
Mechanical work filed in conjunction with ALT CO to install new HVAC system as per plans.
M00992452-S2
01/17/2025
Permit issued — Plumbing
M00861002-S1-PL
01/16/2025
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES FOR APARTMENT RENOVATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00897458-I1
01/14/2025
Signed off — Alteration
Proposed to renovate units on 2nd, 3rd, 4th, 6th, 7th and Penthouse floors. Work to include removal and installation of interior non-load bearing partitions and finish work as per plan. No change in use, occupancy or egress.
M00949998-S1
12/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2024
Signed off — Alteration CO
Mechanical work filed in conjunction with ALT CO to install new HVAC system as per plans.
M00992452-S4
11/20/2024
Filed — Alteration CO
Mechanical work filed in conjunction with ALT CO to install new HVAC system as per plans.
M00992452-P3
11/19/2024
Filed — Alteration CO
Mechanical work filed in conjunction with ALT CO to install new HVAC system as per plans.
M00992452-P4
11/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
11/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
11/19/2024
Special inspection requirement — Maintenance information
Stephen Shishko
11/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
11/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
11/19/2024
Special inspection requirement — Mechanical Systems
Stephen Shishko
11/19/2024
Special inspection requirement — Final
Stephen Shishko
11/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/22/2024
Special inspection requirement — Final
Stephen Shishko
10/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2024
Filed — Alteration
Proposed to renovate units on 2nd, 3rd, 4th, 6th, 7th and Penthouse floors. Work to include removal and installation of interior non-load bearing partitions and finish work as per plan. No change in use, occupancy or egress.
M00949998-P3
09/05/2024
Signed off — Alteration
Plumbing job filed in conjunction with GC application to replace, relocate and add new plumbing fixture in units 2C,3B,3C,4B,5B,5C,6B,6C,7AB,8C.
M00793978-I1
09/03/2024
Signed off — Alteration
Replace and add new plumbing fixtures for apartments located at the 1st floor. No change in use, egress or occupancy.
M00997389-I1
08/30/2024
Signed off — Alteration
Interior renovation of units on the 1st, 3rd, 5th, 6th, 7th, 8th and Penthouse. Work to includes units 1D, 3H, 5F, 7C, 6H, 8AB, 8D, PHA, 5F. No change in use, occupancy or egress.
M00861002-I1
Latest 60 of 252 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZapas Construction01/17/2025
DOB NOWPlumbingSigned-offCBB Plumbing05/24/2024
DOB NOWMechanical SystemsSigned-offTri Contracting05/17/2024
DOB NOWGeneral ConstructionPermit IssuedTri Contracting05/17/2024
DOB NOWSprinklersSigned-offCBB Plumbing05/14/2024
DOB NOWPlumbingSigned-offZapas Construction05/10/2024
DOB NOWPlumbingSigned-offZapas Construction03/14/2024
DOB NOWGeneral ConstructionSigned-offTri Contracting03/14/2024
DOB NOWPlumbingSigned-offZapas Construction03/11/2024
DOB NOWPlumbingSigned-offZapas Construction03/08/2024
DOB NOWPlumbingSigned-offZapas Construction01/30/2024
DOB NOWGeneral ConstructionSigned-offTri Contracting01/10/2024
DOB NOWGeneral ConstructionSigned-offTri Contracting01/10/2024
DOB NOWGeneral ConstructionSigned-offTri Contracting01/10/2024
DOB NOWStructuralSigned-offTri Contracting01/10/2024
DOB NOWGeneral ConstructionSigned-offTri Contracting01/10/2024
DOB NOWGeneral ConstructionSigned-offTri Contracting01/10/2024
DOB NOWGeneral ConstructionSigned-offTri Contracting01/10/2024
DOB NOWGeneral ConstructionSigned-offTri Contracting01/10/2024
DOB NOWGeneral ConstructionSigned-offTri Contracting01/10/2024
DOB NOWGeneral ConstructionSigned-offEca Developers11/15/2023
DOB NOWGeneral ConstructionSigned-offTri Contracting11/13/2023
DOB NOWPlumbingSigned-offZapas Construction08/22/2023
DOB NOWPlumbingSigned-offZapas Construction07/25/2023
DOB NOWGeneral ConstructionSigned-offEca Developers05/22/2023
DOB NOWStructuralSigned-offEca Developers05/22/2023
DOB NOWPlumbingSigned-offZapas Construction05/03/2023
DOB NOWGeneral ConstructionSigned-offEca Developers04/13/2023
DOB NOWGeneral ConstructionSigned-offEca Developers04/12/2023
DOB NOWGeneral ConstructionSigned-offEca Developers04/11/2023
DOB NOWPlumbingSigned-offZapas Construction04/05/2023
DOB NOWPlumbingSigned-offZapas Construction04/03/2023
DOB NOWGeneral ConstructionSigned-offEca Developers03/03/2023
DOB NOWGeneral ConstructionSigned-offEca Developers01/09/2023
DOB NOWSidewalk ShedSigned-offCentral Construction Management10/12/2021
DOB NOWSupported ScaffoldSigned-offCentral Construction Management10/12/2021
BISEQISSUEDRock Group NY07/19/2021
BISOTISSUEDCentral Construction Management09/09/2020
BISEQISSUEDRock Group NY07/24/2020
BISOTISSUEDProven Renovation11/04/2019
+ 46 more permits on file
1 project · most recent 03/03/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2025Signed-offTri ContractingHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-GS09NA 10,900 BTU · Ahu ×9
MXZ-3C24NAHZ4 25,000 BTU · Condensing Unit ×3
Ventilation
Fantech SHR 260RD 267 CFM · Erv ×3
1 project · most recent 03/03/2025
Sprinkler System
FiledStatusContractorScope
03/03/2025Signed-offCBB PlumbingSprinkler System
1 project · most recent 06/10/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/10/2024——Gas, Water/Sanitary
24 projects · most recent 04/04/2025
General Wiring
FiledStatusContractorScope
04/04/2025Permit IssuedDanube Electric CoGeneral Wiring
12/11/2024CompleteDanube Electric CoGeneral Wiring
12/11/2024CompleteDanube Electric CoGeneral Wiring
12/11/2024CompleteDanube Electric CoGeneral Wiring
12/11/2024CompleteDanube Electric CoGeneral Wiring
12/11/2024CompleteDanube Electric CoGeneral Wiring
12/11/2024CompleteDanube Electric CoGeneral Wiring
12/11/2024CompleteDanube Electric CoGeneral Wiring
11/06/2024CompleteDanube Electric CoGeneral Wiring
11/06/2024CompleteDanube Electric CoGeneral Wiring
11/06/2024CompleteDanube Electric CoGeneral Wiring
11/06/2024CompleteDanube Electric CoGeneral Wiring
11/06/2024CompleteDanube Electric CoGeneral Wiring
11/06/2024CompleteDanube Electric CoGeneral Wiring
07/20/2024CompleteDanube Electric CoGeneral Wiring
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
12/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/09/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/24/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/26/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/04/2024Pass-Final PL - UndergroundPassView ↗
05/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
03/21/2025Fire-Resistant Penetrations and JointsAri Kamospecial
03/21/2025Tenant Protection Plan ComplianceAri Kamospecial
03/07/2025Tenant Protection Plan ComplianceAri Kamospecial
03/07/2025Fire-Resistant Penetrations and JointsAri Kamospecial
03/06/2025Fire-Resistance Rated ConstructionAri Kamoprogress
03/06/2025Tenant Protection Plan ComplianceAri Kamospecial
03/06/2025Lighting controlsAri Kamoenergy_progress
03/06/2025Energy Code Compliance InspectionsAri Kamoprogress
03/06/2025Fire-Resistant Penetrations and JointsAri Kamospecial
03/03/2025Fire-Resistant Penetrations and JointsAri Kamospecial
02/25/2025Energy Code Compliance InspectionsAri Kamoprogress
02/25/2025Tenant Protection Plan ComplianceAri Kamospecial
02/25/2025Fire-Resistance Rated ConstructionAri Kamoprogress
02/25/2025Fire-Resistant Penetrations and JointsAri Kamospecial
02/25/2025Lighting controlsAri Kamoenergy_progress
02/10/2025Fire-Resistant Penetrations and JointsAri Kamospecial
02/10/2025Fire-Resistant Penetrations and JointsAri Kamospecial
02/10/2025Tenant Protection Plan ComplianceAri Kamospecial
11/19/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
11/19/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
11/19/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
11/19/2024Maintenance informationStephen Shishkoenergy_progress
11/19/2024Tenant Protection Plan ComplianceAri Kamospecial
11/19/2024Mechanical SystemsStephen Shishkospecial
11/19/2024FinalStephen Shishkoprogress
Latest 25 of 97.
▾Documents — 1,163 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch47
09/03/2026M00607999-I1Request digital key ↗
09/03/2026M00608041-I1Request digital key ↗
09/01/2026M08047978-P1Request digital key ↗
Showing 3 of 47 on file for this type
▸Applications & Permits181
▸BISWORK PERMIT APPLICATION103
11/01/2019140875649Open ↗
08/29/2019140688833Open ↗
05/29/2019123890272Open ↗
Showing 3 of 103 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION76
07/23/2020123012532Open ↗
03/12/2020123012532Open ↗
02/06/2020123012532Open ↗
Showing 3 of 76 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
03/25/2019122954419Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications309
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION112
03/12/2020123012532Open ↗
02/06/2020123012532Open ↗
02/03/2020123216741Open ↗
Showing 3 of 112 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
09/03/2026M00607999-I1Open ↗
09/01/2026M08047978-P2Open ↗
09/01/2026M08047978-I1Open ↗
Showing 3 of 47 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST40
03/26/2018123216741Open ↗
04/25/2017123012532Open ↗
02/11/2016122426357Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
10/03/2026M00997389-P3Open ↗
10/01/2026M00834284-P1Open ↗
09/30/2026M00949998-P2Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
10/01/2026M00834284-P1Open ↗
09/26/2026M00845391-P1Open ↗
09/02/2026M00997389-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
11/01/2019140875649Open ↗
03/26/2018123216741Open ↗
09/12/2017140691516Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
11/01/2019140875649Open ↗
09/12/2017140691516Open ↗
09/07/2017140688833Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/01/2019140875649Open ↗
09/12/2017140691516Open ↗
09/07/2017140688833Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment95
▸BISSELF-CERT PLUMBING NOTICE46
08/13/2015140248809Open ↗
Showing 1 of 46 on file for this type
▸BISSCHEDULE B - PLUMBING38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
03/26/2018123216741Open ↗
04/25/2017123012532Open ↗
02/11/2016122426357Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
08/13/2015140248809Open ↗
▸Safety & Tenant Protection9
▸BISTENANT PROTECTION PLAN AND NOTES6
11/01/2019140875649Open ↗
09/12/2017140691516Open ↗
09/07/2017140688833Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Tree Checklist3
08/13/2026M00992452-P6Open ↗
08/13/2026M00992452-P3Open ↗
08/13/2026M00992452-I1Open ↗
▸Environmental & Asbestos112
▸DOB NOWDEP ACP-5: Asbestos Assessment Report46
09/01/2026M08047978-I1Open ↗
09/01/2026M08047978-P2Open ↗
09/01/2026M08047978-P1Open ↗
Showing 3 of 46 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'45
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 45 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
02/03/2020123216741Open ↗
11/01/2019140875649Open ↗
05/15/2019123890272Open ↗
Showing 3 of 18 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance60
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
03/12/2020123012532Open ↗
02/06/2020123012532Open ↗
02/03/2020123216741Open ↗
Showing 3 of 32 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
03/05/2021123890272Open ↗
05/13/2020123216741Open ↗
02/03/2020123216741Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/05/2021123890272Open ↗
07/23/2020123012532Open ↗
05/13/2020123216741Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/01/2019140875649Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/07/2017140688833Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY12
03/05/2021123890272Open ↗
03/05/2021123890272Open ↗
03/05/2021123890272Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs101
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST51
04/14/2021123890272Open ↗
05/13/2020123216741Open ↗
02/03/2020123216741Open ↗
Showing 3 of 51 on file for this type
▸BISADMINISTRATIVE OBJECTIONS40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/29/2019140688833Open ↗
01/26/2016140248809Open ↗
Showing 2 of 7 on file for this type
▸BISSHED LETTER2
08/29/2019140688833Open ↗
08/30/2018140688833Open ↗
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership149
▸BISCOST AFFIDAVIT99
05/13/2020123216741Open ↗
02/03/2020123216741Open ↗
12/19/2019140875649Open ↗
Showing 3 of 99 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT47
03/26/2018123216741Open ↗
04/25/2017123012532Open ↗
02/24/2016122426357Open ↗
Showing 3 of 47 on file for this type
▸BISWELDERS AFFIDAVIT1
04/28/2015140248809Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
04/14/2021123890272Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/14/2021123890272Open ↗
▸Filing & Intake Forms79
▸BISEFILING COVER SHEET47
04/30/2019123890272Open ↗
03/26/2018123216741Open ↗
04/25/2017123012532Open ↗
Showing 3 of 47 on file for this type
▸BISBOROUGH INTAKE FORM14
03/12/2020123012532Open ↗
02/06/2020123012532Open ↗
02/03/2020123216741Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION11
09/03/2019140691516Open ↗
08/20/2019140691516Open ↗
05/28/2019123890272Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
11/01/2019140875649Open ↗
09/12/2017140691516Open ↗
09/07/2017140688833Open ↗
Showing 3 of 7 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/28/2015140248809Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/27/2026M00992452-P3Open ↗
08/27/2026M00992452-I1Open ↗
08/27/2026M00992452-P6Open ↗
▸BISDHCR DOCUMENT1
04/30/2019123890272Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type