BuildNYC
Co-op within a condominium
340 EAST 74TH STREET
MANHATTAN · BIN 1044913
💬 Discuss this project
1957Year Built
13Stories
R9Building Class
R8BZoning
128,381 sfGross Floor Area
122Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMPFDNY Report ↗
Co-op within a condominium · Owner of record: 340 E 74 St Owners · 15,325 sf lot · 8.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof340 E 74th Street Owners Corp.3p · 2 filings · 16 docs
PenthouseUnit PHF14p · 2 filings · 20 docs
Floor 12Unit 12B8p · 2 filings · 9 docs
Floor 11
Floor 10
Floor 9
Floor 8Unit 8B7p · 2 filings · 6 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Unit 3F, Unit 3G1 filing · 11 docs
Floor 2
Floor 1Installation of heavy duty sidewalk shed5p · 1 filing · 2 docs
Site & exterior340 E 74th Street Owners Corp.20p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
340 East 74th St Owners4207/08/2026
340 Realty NY903/21/2026
E-Z Permit NY503/22/2026
340 E 74th203/21/2026
706 Riverside Drive Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants303/21/2026
Aca Associates803/21/2026
Rigid Structural Design203/21/2026
Merritt Engineering Consultant203/21/2026
SNR Expediting Design203/21/2026
Lombardo Building Consultants103/21/2026
E-Z Safety NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Amsterdam RestorationScaffold603/21/2026
Peter G ConstructionGeneral Contractor407/08/2026
V & A ImprovementsGeneral Contractor303/21/2026
Exo IndustriesScaffold303/21/2026
Exo IndustriesGeneral Contractor303/21/2026
A.R.L. Plumbing & HeatingPlumbing207/08/2026
Matros Automated ElectricalElectrical203/21/2026
Moskowitz StuartElectrical203/21/2026
Slade ElectricElectrical103/21/2026
Upgrade 1 Construction CoGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Caseworks Architects, PLL1912204/15/2026
Metric Consulting and Ins1803104/15/2026
AG Engineering8899205/12/2025
Dean Mendez Architect, P8621101/27/2025
Merritt Engineering Consulting460101/27/2025
Gee2000 Architect691107/06/2023
Building Lifecycle
All (143)Filed (20)Permit Issued (11)Signed Off (11)Facade (FISP) (18)Violation (60)Inspection (5)Objection (1)Special Inspection (17)
07/10/2026
Signed off — Alteration
PLANTERS RECONSTRUCTION AT THE FRONT FACADE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01384860-I1
04/27/2026
Permit issued — General Construction
M01384860-I1-GC
04/15/2026
Filed — Alteration
PLANTERS RECONSTRUCTION AT THE FRONT FACADE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01384860-I1
04/09/2026
Special inspection requirement — Final
John Murray
04/09/2026
Special inspection requirement — Masonry
John Murray
04/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/03/2026
Cycle 10 facade report submitted
02/27/2026
Cycle 10 facade report signed — SAFE
02/11/2026
Cycle 10 facade inspection completed
09/02/2025
Signed off — Alteration
M01153131-I1
07/11/2025
Signed off — Alteration
BRICK REPLACEMENT AND INSTALLATION OF HELLICAL ANCHORS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01166857-I1
05/16/2025
Objection raised — Other
05/12/2025
Filed — Alteration
FACADE RESTORATION, INSPECTIONS
M01152825-P1
05/09/2025
Cycle 9 facade report signed — SWARMP
05/05/2025
Cycle 9 facade inspection completed
03/06/2025
Permit issued — General Construction
M01166857-I1-GC
02/27/2025
Cycle 9 facade report submitted
02/06/2025
Permit issued — Suspended Scaffold
M01152825-I1-SC
01/27/2025
Filed — Alteration
BRICK REPLACEMENT AND INSTALLATION OF HELLICAL ANCHORS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01166857-I1
01/19/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ARIEL GOLSHAN
01/15/2025
Filed — Alteration
FACADE RESTORATION, INSPECTIONS
M01152825-I1
01/15/2025
Special inspection requirement — Post-installed Anchors
ARIEL GOLSHAN
01/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
01/14/2025
Special inspection requirement — Post-installed Anchors
Christopher Krepcio
01/14/2025
Special inspection requirement — Final
Christopher Krepcio
01/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Krepcio
01/14/2025
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
12/27/2024
Filed — Alteration
M01153131-I1
12/27/2024
Permit issued — Sidewalk Shed
M01153131-I1-SH
11/14/2024
Violation issued (ECB, closed)
Construction
12/15/2023
Signed off — Alteration
M00765996-I1
07/06/2023
Filed — Alteration
COMBINE UNITS 3F & 3G ON 3RD FLOOR WITH INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY OR EXIT.
M00791021-S1
07/06/2023
Filed — Alteration
COMBINE UNITS 3F & 3G ON 3RD FLOOR WITH INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY OR EXIT.
M00791021-I1
06/26/2023
Signed off — Alteration
REMOVAL OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES FOR APT. 12B AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00766202-I1
04/25/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
04/03/2023
Signed off — Alteration
M00800516-I1
04/03/2023
Signed off — Alteration
M00800527-I1
03/28/2023
Filed — Alteration
REMOVAL OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES FOR APT. 12B AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00766202-P1
03/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/15/2023
Violation issued (HPD, closed)
A
02/22/2023
Signed off — Alteration
M08043041-I1
02/21/2023
Signed off — Alteration
M08043040-I1
02/17/2023
Cycle 9 facade report submitted
02/17/2023
Cycle 9 facade report signed — SWARMP
02/13/2023
Cycle 9 facade inspection completed
02/13/2023
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
01/13/2023
Permit issued — Plumbing
M00766202-I1-PL
12/21/2022
Permit issued — General Construction
M00800516-I1-GC
12/16/2022
Filed — Alteration
M00800516-I1
12/16/2022
Filed — Alteration
M00800527-I1
12/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/22/2022
Filed — Alteration
M08043041-I1
11/22/2022
Filed — Alteration
M08043040-I1
11/22/2022
Permit issued — Sidewalk Shed
M08043040-I1-SH
11/22/2022
Permit issued — Supported Scaffold
M08043041-I1-SF
11/08/2022
Permit issued — Plumbing
M00766202-I1-PL
11/02/2022
Violation issued (HPD, closed)
I
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/04/2022
Special inspection requirement — Energy Code Compliance Inspections
PETER GEE
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPeter G Construction04/27/2026
DOB NOWGeneral ConstructionSigned-offExo Industries03/06/2025
DOB NOWSuspended ScaffoldPermit IssuedExo Industries02/06/2025
DOB NOWSidewalk ShedSigned-offExo Industries12/27/2024
DOB NOWPlumbingSigned-offA.R.L. Plumbing & Heating01/13/2023
DOB NOWGeneral ConstructionSigned-offV & A Improvements12/21/2022
DOB NOWSidewalk ShedSigned-offNew Amsterdam Restoration11/22/2022
DOB NOWSupported ScaffoldSigned-offNew Amsterdam Restoration11/22/2022
DOB NOWPlumbingSigned-offA.R.L. Plumbing & Heating11/08/2022
DOB NOWGeneral ConstructionSigned-offPeter G Construction07/21/2022
DOB NOWGeneral ConstructionSigned-offUpgrade 1 Construction Co03/14/2022
BISPLISSUEDBT's Plumbing and Heating03/15/2018
BISOTISSUEDCDP General Contractors12/21/2017
BISPLISSUEDPremier Pipe Solutions02/22/2016
BISOTISSUEDB & B Consr. of Greene12/28/2015
BISPLISSUEDPremier Pipe Solutions05/26/2015
BISOTISSUEDB & B Consr. of Greene05/19/2015
BISPLISSUEDAccurate Mechanical08/15/2014
BISOTISSUEDQuinnco of NY07/10/2014
BISPLISSUEDWynne Plumbing & Heating04/22/2014
BISPLISSUEDCrown Plumbing02/20/2014
BISPLISSUEDAranda Plumbing & Heating02/19/2014
BISOTISSUEDB & B Consr. of Greene01/24/2014
BISOTISSUEDDaniel Restrepo Construction01/07/2014
BISOTISSUEDCDP General Contractors12/20/2013
BISPLISSUEDAlklem Plumbing12/17/2013
BISFBISSUEDMarlande Heating12/16/2013
BISPLISSUEDMCM Plumbing & Heating04/17/2009
BISOTISSUEDDaniel Restrepo Construction02/12/2009
BISOTISSUEDSignature Audio Design02/04/2009
BISPLISSUEDBlatt Plumbing07/14/2008
BISOTISSUEDReyvin P/H01/09/2008
BISOTISSUEDDaniel Construction06/13/2007
BISOTISSUEDYork Restoration04/10/2007
BISEQISSUEDPerimeter Bridge & Scaffold04/02/2007
BISPLISSUEDAranda Plumbing & Heating03/02/2007
BISOTISSUEDPinnacle Group12/06/2006
BISPLISSUEDAranda Plumbing & Heating05/09/2005
BISOTISSUEDDaniel Construction03/16/2005
BISFSISSUEDAL Eastmond & Sons10/03/2000
+ 12 more permits on file
1 project · most recent 07/06/2023
Water/Sanitary
FiledStatusContractorScope
07/06/2023——Water/Sanitary
9 projects · most recent 10/11/2026
General Wiring
FiledStatusContractorScope
10/11/2026CompleteEvs ElectricGeneral Wiring
12/27/2024CompleteRichard Neu—
04/23/2024CompleteAll City Electrical—
03/28/2023CompleteRobert Chimenti3 meters, 1 new_meters
01/04/2023CompleteEvs ElectricGeneral Wiring
11/22/2022CompleteGlendale Electl Contng—
11/10/2022CompleteEnterprise Electrical SystemsGeneral Wiring
04/27/2022CompleteEnterprise Electrical SystemsGeneral Wiring
03/11/2018CompleteAccurate ElectricalGeneral Wiring
1 project · most recent 05/12/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
05/12/2025Permit IssuedExo IndustriesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/25/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
04/09/2026FinalJohn Murrayprogress
04/09/2026MasonryJohn Murrayspecial
04/09/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
01/19/2025Alternative Materials - OTCR Buildings Bulletin NumberARIEL GOLSHANspecial
01/15/2025Post-installed AnchorsARIEL GOLSHANspecial
01/14/2025Tenant Protection Plan ComplianceDean Mendezspecial
01/14/2025Post-installed AnchorsChristopher Krepciospecial
01/14/2025FinalChristopher Krepcioprogress
01/14/2025Energy Code Compliance InspectionsChristopher Krepcioprogress
01/14/2025Air barrier - visual inspectionChristopher Krepcioenergy_progress
08/04/2022Energy Code Compliance InspectionsPETER GEEprogress
08/04/2022FinalPETER GEEprogress
08/04/2022Fire-Resistant Penetrations and JointsPETER GEEspecial
08/04/2022Lighting in dwelling unitsPETER GEEenergy_progress
08/04/2022Fire-Resistance Rated ConstructionPETER GEEprogress
05/23/2022FinalHumayun Ahmedprogress
05/23/2022FinalHumayun Ahmedprogress
▾Documents — 280 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
09/02/2026M00695546-I1Request digital key ↗
09/02/2026M00695546-P1Request digital key ↗
09/02/2026M00695546-P2Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION25
03/29/2018140722350Open ↗
03/28/2018140722350Open ↗
12/14/2017140722350Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION23
03/15/2018140722350Open ↗
12/21/2017140722350Open ↗
02/24/2016122642079Open ↗
Showing 3 of 23 on file for this type
▸Seals & Professional Certifications73
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
09/19/2018140722350Open ↗
10/10/2017122642079Open ↗
07/18/2017121799866Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/02/2026M00695546-P1Open ↗
09/02/2026M00695546-I1Open ↗
09/02/2026M00695546-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/30/2026M00695050-P2Open ↗
08/28/2026M00791021-I1Open ↗
08/28/2026M00791021-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
01/08/2016122642079Open ↗
05/13/2015122376552Open ↗
12/30/2013121659384Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026M01152825-I1Open ↗
09/02/2026M01152825-I1Open ↗
08/28/2026M00791021-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/14/2017140722350Open ↗
01/08/2016122642079Open ↗
05/13/2015122376552Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/09/2009110448490Open ↗
Showing 1 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/14/2017140722350Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/14/2017140722350Open ↗
▸Trade Schedules & Equipment33
▸BISSCHEDULE B - PLUMBING13
12/14/2017140722350Open ↗
09/05/2014121966710Open ↗
12/30/2013121659384Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
12/02/2015122376552Open ↗
10/16/2014121966710Open ↗
08/22/2014121659384Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
03/28/2018140722350Open ↗
04/20/2016122642079Open ↗
04/20/2016122642079Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/24/2013121799866Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
12/14/2017140722350Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/02/2026M00695546-I1Open ↗
09/02/2026M00695546-P2Open ↗
09/02/2026M00695546-P1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
12/14/2017140722350Open ↗
01/08/2016122642079Open ↗
05/13/2015122376552Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
02/09/2009110448490Open ↗
01/27/2009110441978Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
09/19/2018140722350Open ↗
10/10/2017122642079Open ↗
01/08/2016122642079Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
09/19/2018140722350Open ↗
10/10/2017122642079Open ↗
01/07/2016122376552Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
04/22/2014121966710Open ↗
12/30/2013121659384Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/14/2017140722350Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/14/2017140722350Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/14/2017140722350Open ↗
▸Approvals, Objections & Sign-offs14
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
09/19/2018140722350Open ↗
10/10/2017122642079Open ↗
07/18/2017121799866Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/28/2010110441978Open ↗
10/17/2008110070654Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
01/27/2009110441978Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT21
09/19/2018140722350Open ↗
12/14/2017140722350Open ↗
10/10/2017122642079Open ↗
Showing 3 of 21 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
07/17/2014121966710Open ↗
10/16/2013121349512Open ↗
03/18/2009110448490Open ↗
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET9
01/08/2016122642079Open ↗
05/13/2015122376552Open ↗
04/22/2014121966710Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION5
03/29/2018140722350Open ↗
07/06/2017121799866Open ↗
04/20/2016122642079Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
09/19/2018140722350Open ↗
03/28/2018140722350Open ↗
10/10/2017122642079Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/14/2017140722350Open ↗
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/13/2026M01152825-I1Open ↗
08/13/2026M01152825-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M01152825-I1Open ↗
08/13/2026M01152825-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/18/2017121799866Open ↗