340 MILLER AVENUE · BIN 3327011
💬 Discuss this project
1970Year Built
4Stories
C1Building Class
R7AZoning
69,912 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized9 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: Boulevard Together Owner · 37,500 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBoulevard Together Building Exterior52p · 6 filings · 20 docs
Floor 4Plumbing fixture replacement, floors 1-4 and roof56p · 3 filings · 20 docs
Floor 3Plumbing fixture replacement, floors 1-4 and roof56p · 3 filings · 20 docs
Floor 2Plumbing fixture replacement, floors 1-4 and roof56p · 3 filings · 20 docs
Floor 1Plumbing fixture replacement, floors 1-4 and roof61p · 4 filings · 20 docs
CellarBoulevard Together Building Exterior34p · 4 filings · 20 docs
Site & exteriorBoulevard Together Building Exterior45p · 5 filings · 20 docs
Filed — no permit issuedBoulevard Together Building #22 Certificate of Occupancy8p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4707/08/2026
Boulevard Together Developer2707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Peter Clements Architect1107/21/2025
EP Engineering906/12/2025
M. Hamdi Gunal, PE, P602/04/2025
Ashraf304/14/2023
Joel Phagoo P.E503/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Betro Design Group2603/21/2026
Rennon Construction503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.M.K. ContractingGeneral Contractor2007/08/2026
Skyline RestorationScaffold507/08/2026
Rennon ConstructionScaffold407/08/2026
M & M Piping and HeatingPlumbing407/08/2026
MNK EnterprisesScaffold303/21/2026
Neelam ConstructionScaffold203/21/2026
Thanasi ElectricalGeneral Contractor103/22/2026
Top Shelf ElectricElectrical103/21/2026
Thanasi ElectricalElectrical103/22/2026
Selectric Electrical Cont Co IElectrical103/21/2026
Royalton DevelopmentGeneral Contractor104/10/2026
Thanasi ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec58421305/30/2025
EP Inspections and Commis70791705/30/2025
M. Hamdi Gunal, PE3000110/15/2021
Building Lifecycle
All (193)Filed (34)Permit Issued (23)Signed Off (11)Violation (60)Inspection (3)Objection (32)Special Inspection (30)
08/12/2026
Objection resolved — Resolved
08/04/2026
Objection resolved — Addressed
07/02/2026
Objection raised — Other
07/02/2026
Objection raised — Admin
07/02/2026
Objection resolved — Addressed
04/13/2026
Signed off — Alteration
SITE IMPROVEMENTS TO ENTIRE SITE WITH NEW BENCHES AND TABLES AS WELL AS PLANTERS AND TRASH ENCLOSURE AS PER PLANS FILED.
B00570147-I1
03/31/2026
Signed off — Alteration
B00539306-I1
12/02/2025
Violation issued (FDNY_ORDER, closed)
10/21/2025
Signed off — Alteration
Installation of supported scaffold
B00820219-S1
10/14/2025
Objection resolved — Addressed
10/14/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
07/30/2025
Signed off — Alteration
REPLACEMENT OF ALL FIXTURES THROUGHOUT WITHIN EXISTING ROUGHING AT FLOORS 1 THRU 4 AND ROOF AS PER PLANS FILED.
B00534838-I1
07/30/2025
Objection raised — Other
07/30/2025
Objection raised — Scope
07/30/2025
Objection raised — Scope
07/30/2025
Objection raised — Zoning
07/23/2025
Signed off — Alteration
ROOF AND PARAPET RECONSTRUCTRION, WINDOW REPLACEMENT, WINDOW LINTEL WHERE DAMAGED OR DETERIORATED, BRICK POINTING AND REPLACEMENT WHERE CRACKED OR DAMAGED AND FIRE ESCAPE REPAIR / RECONSTRUCTION WHERE DAMAGED OR DETERIORATED AS PER PLANS FILED.
B00527268-I1
07/21/2025
Filed — Alteration CO
FILING TO AMEND EXPIRED TCO FOR WHICH THE FINAL C of O WAS NEVER OBTAINED. ALL REHAB WORK WAS PERFORMED UNDER RELATED JOB #'s B00527268 & B00534838. EXISTING USE, EGRESS AND OCCUPANCY OF RESIDENTIAL BUILDING TO REMAIN.
B01258188-I1
07/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/25/2025
Signed off — Alteration
REMOVE AND RECONSTRUCT BUILDING PARAPET WALL ALONG PERIMETER INCLUDING STAIR BULKHEAD WITH NEW PRECAST COPING AND SISTER EXISTING JOISTS AT AREAS OF DETERIORATION AND PROVIDE NEW OR SISTER MEMBERS AS NEEDED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00596465-I1
06/14/2025
Signed off — Alteration
B00355459-I1
06/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
06/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
06/13/2025
Special inspection requirement — Final
Christopher Burgess
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
06/13/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
06/13/2025
Special inspection requirement — Masonry
CONNIE PISANI
06/13/2025
Special inspection requirement — Insulation placement and R values
Christopher Burgess
06/12/2025
Filed — Alteration
REPLACEMENT OF ALL FIXTURES THROUGHOUT WITHIN EXISTING ROUGHING AT FLOORS 1 THRU 4 AND ROOF AS PER PLANS FILED.
B00534838-P5
06/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00845192-I1
05/30/2025
Filed — Alteration
ROOF AND PARAPET RECONSTRUCTRION, WINDOW REPLACEMENT, WINDOW LINTEL WHERE DAMAGED OR DETERIORATED, BRICK POINTING AND REPLACEMENT WHERE CRACKED OR DAMAGED AND FIRE ESCAPE REPAIR / RECONSTRUCTION WHERE DAMAGED OR DETERIORATED AS PER PLANS FILED.
B00527268-P4
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
05/19/2025
Special inspection requirement — Final
Christopher Burgess
05/19/2025
Special inspection requirement — Insulation placement and R values
Christopher Burgess
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
05/19/2025
Special inspection requirement — Masonry
CONNIE PISANI
05/19/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
05/05/2025
Permit issued — Structural
B00527268-I1-ST
05/05/2025
Permit issued — Structural
B00527268-I1-GC
04/28/2025
Signed off — Alteration
REMOVAL & INSTALL ALL WALL, FLOOR & CEILING FINISHES, KITCHEN APPLIANCES & CABINETS, DOORS & FRAMES TO BE DEMOLISHED & REPLACED AS PER PLANS FILED.
B00741136-I1
02/07/2025
Permit issued — Structural
B00596465-I1-ST
02/04/2025
Filed — Alteration
REMOVE AND RECONSTRUCT BUILDING PARAPET WALL ALONG PERIMETER INCLUDING STAIR BULKHEAD WITH NEW PRECAST COPING AND SISTER EXISTING JOISTS AT AREAS OF DETERIORATION AND PROVIDE NEW OR SISTER MEMBERS AS NEEDED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00596465-P3
01/30/2025
Permit issued — General Construction
B00570147-I1-GC
11/12/2024
Permit issued — General Construction
B00570147-I1-GC
10/14/2024
Signed off — Alteration
Installation of supported scaffold
B00820219-I1
10/09/2024
Special inspection requirement — Lighting in dwelling units
Christopher Burgess
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Burgess
10/09/2024
Special inspection requirement — Final
Christopher Burgess
10/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Burgess
10/09/2024
Special inspection requirement — Insulation placement and R values
Christopher Burgess
10/02/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/01/2024
Filed — Alteration
REMOVAL & INSTALL ALL WALL, FLOOR & CEILING FINISHES, KITCHEN APPLIANCES & CABINETS, DOORS & FRAMES TO BE DEMOLISHED & REPLACED AS PER PLANS FILED.
B00741136-P2
09/26/2024
Filed — Alteration
GARAGE STRUCTURAL REPAIRS AND PROPOSE DETENTION TANK ENCLOSURE AS PER PLANS FILED.
B00598653-P2
09/18/2024
Permit issued — Mechanical Systems
B00539306-I1-MS
09/09/2024
Filed — Alteration
REMOVE AND RECONSTRUCT BUILDING PARAPET WALL ALONG PERIMETER INCLUDING STAIR BULKHEAD WITH NEW PRECAST COPING AND SISTER EXISTING JOISTS AT AREAS OF DETERIORATION AND PROVIDE NEW OR SISTER MEMBERS AS NEEDED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00596465-P2
08/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 193 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offA.M.K. Contracting05/05/2025
DOB NOWStructuralSigned-offA.M.K. Contracting05/05/2025
DOB NOWStructuralSigned-offA.M.K. Contracting02/07/2025
DOB NOWGeneral ConstructionSigned-offRoyalton Development01/30/2025
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting11/12/2024
DOB NOWMechanical SystemsSigned-offA.M.K. Contracting09/18/2024
DOB NOWPlumbingSigned-offM & M Piping and Heating08/08/2024
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting06/05/2024
DOB NOWSupported ScaffoldSigned-offRennon Construction03/15/2024
DOB NOWConstruction FenceSigned-offSkyline Restoration02/23/2024
DOB NOWStructuralSigned-offA.M.K. Contracting02/02/2024
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting02/02/2024
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting12/13/2023
DOB NOWStructuralSigned-offA.M.K. Contracting05/18/2023
DOB NOWStructuralSigned-offA.M.K. Contracting05/18/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises03/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offRennon Construction03/13/2023
DOB NOWSupported ScaffoldSigned-offRennon Construction03/08/2023
DOB NOWConstruction FenceSigned-offSkyline Restoration02/17/2023
DOB NOWConstruction FenceSigned-offSkyline Restoration02/01/2023
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting12/14/2022
DOB NOWGeneral ConstructionSigned-offA.M.K. Contracting12/02/2021
DOB NOWConstruction FenceSigned-offNeelam Construction06/12/2020
BISEQISSUEDSkyworx Contracting05/03/2022
BISEQISSUEDSkyworx Contracting03/19/2021
BISEQISSUEDSkyworx Contracting02/26/2020
BISPLISSUEDRocon12/04/2019
BISEQISSUEDSkyworx Contracting03/04/2019
BISEQISSUEDSkyworx Contracting03/08/2018
BISEQISSUEDSkyworx Contracting03/09/2017
7 projects · most recent 10/01/2026
General Wiring
FiledStatusContractorScope
10/01/2026Permit IssuedEcny Electrical ContractorsGeneral Wiring
10/01/2026Permit IssuedEcny Electrical ContractorsGeneral Wiring
03/14/2024Permit IssuedTop Shelf Electric—
02/08/2023CompleteThanasi ElectricalGeneral Wiring
05/13/2021Permit IssuedAmin Electrical—
12/18/2019CompleteTru-Val ElectricGeneral Wiring
01/10/2019CompleteGilston Electrical ContractingGeneral Wiring
1 project · most recent 09/26/2024
Concrete Masonry
FiledStatusContractorScope
09/26/2024——Concrete, Masonry
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/21/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 108
DateRequirementInspectorRole
07/18/2025Tenant Protection Plan Compliance—special
06/13/2025MasonryCONNIE PISANIspecial
06/13/2025Energy Code Compliance InspectionsChristopher Burgessprogress
06/13/2025FinalChristopher Burgessprogress
06/13/2025Insulation placement and R valuesChristopher Burgessenergy_progress
06/13/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
06/13/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
06/13/2025Structural Steel - DetailsCONNIE PISANIspecial
05/19/2025MasonryCONNIE PISANIspecial
05/19/2025Insulation placement and R valuesChristopher Burgessenergy_progress
05/19/2025FinalChristopher Burgessprogress
05/19/2025Energy Code Compliance InspectionsChristopher Burgessprogress
05/19/2025Structural Steel - DetailsCONNIE PISANIspecial
05/19/2025Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
05/19/2025Fire-Resistant Penetrations and JointsChristopher Burgessspecial
10/09/2024Energy Code Compliance InspectionsChristopher Burgessprogress
10/09/2024FinalChristopher Burgessprogress
10/09/2024Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
10/09/2024Fire-Resistant Penetrations and JointsChristopher Burgessspecial
10/09/2024Lighting in dwelling unitsChristopher Burgessenergy_progress
10/09/2024Insulation placement and R valuesChristopher Burgessenergy_progress
08/05/2024HVAC-R and service water piping design and insulationChristopher Burgessenergy_progress
08/05/2024Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
08/05/2024Energy Code Compliance InspectionsChristopher Burgessprogress
08/05/2024FinalChristopher Burgessprogress
Latest 25 of 108.
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch34
09/01/2026B00570147-I1Request digital key ↗
09/01/2026B00527268-P1Request digital key ↗
09/01/2026B00527268-P3Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00355459-I1Request digital key ↗
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION7
05/07/2022340480474Open ↗
03/22/2021340480474Open ↗
02/28/2020340480474Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
10/30/2018321070498Open ↗
03/08/2017340480474Open ↗
▸DOB NOWHPD - Permit Notice1
08/15/2026B00564130-I1Open ↗
▸Seals & Professional Certifications96
▸DOB NOWProgress Inspector Seal & Signature36
09/01/2026B00527268-P3Open ↗
09/01/2026B00527268-P3Open ↗
09/01/2026B00527268-P3Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/01/2026B00564130-I1Open ↗
09/01/2026B00570147-I1Open ↗
09/01/2026B00527268-P4Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026B00527268-P3Open ↗
09/01/2026B00527268-P3Open ↗
09/01/2026B00527268-P4Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/05/2019321070498Open ↗
10/30/2018321070498Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/08/2017340480474Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/08/2017340480474Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/08/2017340480474Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/30/2018321070498Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES2
03/08/2017340480474Open ↗
10/30/2018321070498Open ↗
▸DOB NOWStreet Tree Checklist2
08/15/2026B00564130-I1Open ↗
08/13/2026B01258188-I1Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00355459-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00534838-I1Open ↗
09/01/2026B00539306-I1Open ↗
08/15/2026B00596465-I1Open ↗
Showing 3 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/05/2019321070498Open ↗
▸Energy Compliance9
▸DOB NOWEN2: As Built Energy Analysis.3
08/14/2026B00527268-I1Open ↗
08/13/2026B00539306-I1Open ↗
08/13/2026B00741136-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/05/2019321070498Open ↗
10/30/2018321070498Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/04/2021321070498Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/04/2021321070498Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/04/2021321070498Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/08/2017340480474Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/04/2021321070498Open ↗
03/08/2017340480474Open ↗
▸Approvals, Objections & Sign-offs41
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
09/01/2026B00527268-P4Open ↗
09/01/2026B00527268-P1Open ↗
09/01/2026B00527268-P3Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/15/2026B00564130-I1Open ↗
08/14/2026B00527268-I1Open ↗
08/13/2026B00741136-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
09/01/2026B00527268-P4Open ↗
09/01/2026B00527268-P1Open ↗
09/01/2026B00527268-P3Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/18/2021321070498Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/14/2026B00527268-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
12/17/2018321070498Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/18/2021321070498Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM1
03/22/2021340480474Open ↗
▸BISEFILING COVER SHEET1
10/30/2018321070498Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/08/2017340480474Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
09/01/2026B00527268-P4Open ↗
09/01/2026B00527268-P1Open ↗
09/01/2026B00527268-P3Open ↗
Showing 3 of 5 on file for this type