← Back
Two stories - detached, small or mid-size
340 STANLEY AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5003000
💬 Discuss this project
1899Year Built
2.75Stories
A1Building Class
R3AZoning
1,736 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,416 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 9 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC102/06/2025
ARQUITECTURA VARELA112/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
CM3 DESIGN STUDIO103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3 DESIGN HOME IMPROV INCGeneral Contractor303/21/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272102/06/2025
Building Lifecycle
All (12)Filed (2)Permit Issued (2)Signed Off (2)Violation (1)Special Inspection (5)
08/14/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01174929-I1
02/11/2025
Permit issued — Solar
S01174929-I1-SL
02/06/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01174929-I1
01/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/31/2025
Special inspection requirement — Final
Walid Abdulla
01/31/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/31/2024
Signed off — Alteration
S01156135-I1
12/30/2024
Permit issued — General Construction
S01156135-I1-GC
12/17/2024
Filed — Alteration
S01156135-I1
08/17/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/11/2025
DOB NOWGeneral ConstructionSigned-off3 DESIGN HOME IMPROV INC12/30/2024
1 project · most recent 02/06/2025
FiledStatusContractorScope
02/06/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/31/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/31/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/31/2025Energy Code Compliance InspectionsWalid Abdullaprogress
01/31/2025FinalWalid Abdullaprogress
01/31/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026S01156135-I1Request digital key ↗
08/20/2026S01174929-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026S01174929-I1Open ↗
08/22/2026S01174929-I1Open ↗
08/22/2026S01174929-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026S01156135-I1Open ↗
08/20/2026S01174929-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026S01174929-I1Open ↗
08/22/2026S01174929-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026S01174929-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01174929-I1Open ↗