← Back
Elevator cooperative
340 WEST 72 STREET
MANHATTAN · BIN 1030971
💬 Discuss this project
1906Year Built
9Stories
D4Building Class
R10AZoning
33,893 sfGross Floor Area
24Units
LL97 CoveredRent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸FISP: UNSAFE
Elevator cooperative · Owner of record: CHATSWORTH REALTY CORPORATION · 7,151 sf lot · 4.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 19 docs
Bulkhead3p · 1 filing · 15 docs
Floor 97p · 2 filings · 12 docs
Floor 8Under Construction21p · 8 filings · 20 docs
Floor 7Under Construction32p · 4 filings · 20 docs
Floor 6Under Construction27p · 6 filings · 20 docs
Floor 5Under Construction20p · 3 filings · 20 docs
Floor 4Under Construction20p · 3 filings · 20 docs
Floor 3Under Construction32p · 4 filings · 20 docs
Floor 2Under Construction20p · 3 filings · 20 docs
Floor 1Under Construction28p · 7 filings · 20 docs
CellarUnder Construction39p · 18 filings · 20 docs
2 jobs · most recent 05/06/2025
FiledStatusContractorScope
05/06/2025Permit IssuedFIVE BOROUGH NYC LLC21 heads, 1 outlets
04/16/2025Signed-offFIVE BOROUGH NYC LLC49 heads
3 jobs · most recent 04/22/2026
Gas
FiledStatusContractorScope
04/22/2026Signed-offPETER MICELI PLUMBINGGas
03/06/2025Signed-offPETER MICELI PLUMBINGGas
03/06/2025Signed-offPETER MICELI PLUMBINGGas
2 jobs · most recent 01/22/2024
FiledStatusContractorScope
01/22/2024Permit IssuedSOLAS ELECTRICAL CORP—
04/23/2018Permit IssuedLIPPOLIS ELECTRIC, INC.—
1 job · most recent 02/03/2025
Scaffold
FiledStatusContractorScope
02/03/2025Permit IssuedCONSOLIDATED SCAFFOLDINGScaffold
Building Lifecycle
All (300)Filed (50)Permit Issued (52)Signed Off (33)Facade (FISP) (8)Violation (4)Inspection (51)Objection (72)Special Inspection (30)
08/11/2026
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. FILED IN CONJUNCTION WITH ALT 1 APPLICATION #121237018. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01103401-I1
08/11/2026
Signed off — Alteration
hereby filing to renovate interior courtyard as shown on plans filed herewith. No change to use, occupancy or egress.
M00964740-S2
07/16/2026
Signed off — Alteration
hereby filing to renovate interior courtyard as shown on plans filed herewith. No change to use, occupancy or egress.
M00964740-I1
06/24/2026
Signed off — Alteration
Propose new gas piping branch on 8th floor with gas shut-off valve connecting to existing riser which was filed separately(approved permitted & installed), providing gas to 1 ex. Gas stove in apt# 8A. No Change to use bulk, or egress.
M01094686-I1
06/24/2026
Signed off — Alteration
Hereby filing to remove, relocate, and install plumbing fixtures with related piping for renovation of APT # 5A as shown on plans filed herewith. No change to use, occupancy or egress.
M01094668-I1
06/24/2026
Signed off — Alteration
Propose new gas piping branch on 7th floor with gas shut-off valve connecting to existing riser which was filed separately(approved permitted & installed), providing gas to 1 ex. Gas stove in apt# 7B. No Change to use bulk, or egress.
M01094684-I1
06/24/2026
Signed off — Alteration
Hereby filing to remove, relocate, and install plumbing fixtures with related piping for renovation of APT # 5C as shown on plans filed herewith. No change to use, occupancy or egress.
M01094672-I1
06/23/2026
Signed off — Alteration
hereby filing to renovate interior courtyard as shown on plans filed herewith. No change to use, occupancy or egress.
M00964740-S1
06/23/2026
Cycle 9 facade inspection completed
05/15/2026
Permit issued — Plumbing
M01094684-I1-PL
05/15/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/13/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/22/2026
Filed — Alteration
Propose new gas piping branch on 7th floor with gas shut-off valve connecting to existing riser which was filed separately(approved permitted & installed), providing gas to 1 ex. Gas stove in apt# 7B. No Change to use bulk, or egress.
M01094684-P1
04/17/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
04/17/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
04/16/2026
Signed off — Alteration
M08014810-I1
04/10/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/20/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/20/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
03/20/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/18/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/16/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/16/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/13/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/11/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/11/2026
Special inspection requirement — Final
Richard DeMarco
03/04/2026
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
02/27/2026
Objection resolved — Addressed
02/24/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/24/2026
Objection raised — Scope
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
02/19/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/11/2026
Filed — Alteration
Propose new gas piping branch on 8th floor with gas shut-off valve connecting to existing riser which was filed separately(approved permitted & installed), providing gas to 1 ex. Gas stove in apt# 8A. No Change to use bulk, or egress.
M01094686-P1
02/09/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/09/2026
Inspection — No Access-Final PL - Up to 9 Requested Floors
No Access
View inspection ↗
02/06/2026
Filed — Alteration
hereby filing to renovate interior courtyard as shown on plans filed herewith. No change to use, occupancy or egress.
M00964740-P1
02/02/2026
Permit issued — Protection and Mechanical Methods
M01132346-S2-PMM
01/27/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/27/2026
Special inspection requirement — Final
Richard DeMarco
01/26/2026
Signed off — Alteration
Hereby filing to remove and install plumbing fixtures for renovation of suite A6A as shown on plans filed herewith. No change of use, egress, or occupancy.
M08014815-I1
01/26/2026
Signed off — Alteration
M08014806-I1
01/26/2026
Signed off — Alteration
Hereby filing to remove, replace and install plumbing fixtures with related piping for renovation unit G2 as shown on plans filed herewith. No change to use, occupancy or egress.
M08023387-I1
01/26/2026
Signed off — Alteration
hereby fling to remove, replace, and install plumbing fixtures for the renovation unit G1 as shown on plans filed herewith. NO change to use, occupancy or egress.
M08023326-I1
01/14/2026
Signed off — Alteration
Hereby filing to install new plumbing fixtures and related piping for renovation of unit G3 as shown on plans filed herewith. No change to use, occupancy or egress.
M08023999-I1
01/14/2026
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
01/06/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
01/06/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/23/2025
Filed — Alteration
M01172380-P3
12/23/2025
Filed — Alteration
M01172380-P1
12/23/2025
Filed — Alteration
M01172380-P2
12/08/2025
Permit issued — Plumbing
M00964740-S2-PL
12/03/2025
Permit issued — Sidewalk Shed
M01132346-S1-SH
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/02/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLIDATED SCAFFOLDING INC.1606/28/2026
CHATWORTH RLTY CORP2303/22/2026
CAVAN BUILDERS CORPORATIO403/22/2026
NELSON MANAGEMENT GROUP203/22/2026
KINGLAND MANAGEMENT CORP503/22/2026
CHATSWORTH 72ND ST303/22/2026
CHADSWORTH REALTY CORP203/22/2026
HFZ 344 W 72 ST OWNER LLC103/21/2026
HFZ 344 WEST 72ND STREET OWNER5003/21/2026
CHATSWORTH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GILLMAN CONSULTING11803/21/2026
KMS DRAFTING1003/21/2026
SATO CONSTRUCTION403/21/2026
JACK JAFFA & ASSOCIATES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVAN BUILDERS CORPGeneral Contractor2507/08/2026
PETER MICELI PLUMBINGPlumbing1407/08/2026
COD PLUMBING CORPPlumbing1307/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor806/28/2026
SATO CONSTRUCTION CO.INCGeneral Contractor407/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/08/2026
BRUCHE MECHANICAL NY LLCFire Protection307/08/2026
FIVE BOROUGH NYC LLCFire Protection307/08/2026
CARMINE LIPPOLISElectrical103/21/2026
NOEL NASHElectrical103/21/2026
JOSEPH BRAMANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8436104/22/2026
AMERITESTING LLC7927302/07/2025
FRAMEWORK ENGINEERING PC8217106/14/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING05/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCONSOLIDATED SCAFFOLDING02/02/2026
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN12/08/2025
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING12/03/2025
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING10/31/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING10/28/2025
DOB NOWPlumbingPermit IssuedPETER MICELI PLUMBING10/08/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING09/10/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING09/09/2025
DOB NOWPlumbingPermit IssuedPETER MICELI PLUMBING09/09/2025
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN09/05/2025
DOB NOWGeneral ConstructionSigned-offCAVAN BUILDERS CORP08/26/2025
DOB NOWStructuralSigned-offCAVAN BUILDERS CORP08/26/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING08/21/2025
DOB NOWPlumbingPermit IssuedPETER MICELI PLUMBING08/21/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING08/19/2025
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC08/08/2025
DOB NOWStandpipePermit IssuedFIVE BOROUGH NYC LLC08/07/2025
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC07/15/2025
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN07/11/2025
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN07/11/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING04/10/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING04/10/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING04/10/2025
DOB NOWPlumbingSigned-offPETER MICELI PLUMBING04/10/2025
DOB NOWSuspended ScaffoldSigned-offSATO CONSTRUCTION CO. INC03/06/2025
DOB NOWSuspended ScaffoldSigned-offSATO CONSTRUCTION CO. INC03/05/2025
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN02/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCONSOLIDATED SCAFFOLDING02/21/2025
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING12/10/2024
DOB NOWGeneral ConstructionSigned-offSATO CONSTRUCTION CO.INC11/29/2024
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING11/08/2024
DOB NOWPlumbingPermit IssuedPETER MICELI PLUMBING09/04/2024
DOB NOWMechanical SystemsSigned-offCAVAN BUILDERS CORP08/27/2024
DOB NOWGeneral ConstructionSigned-offCAVAN BUILDERS CORP08/22/2024
DOB NOWGeneral ConstructionSigned-offCAVAN BUILDERS CORP08/21/2024
DOB NOWStructuralSigned-offCAVAN BUILDERS CORP08/12/2024
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN07/09/2024
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN04/09/2024
DOB NOWPlumbingSigned-offVIN-RAY PLUMBING & HEATIN04/09/2024
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 59
DateTypeResultReport
05/15/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/13/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/17/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/17/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/10/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/20/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/20/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/20/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/18/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/16/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/13/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/11/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/04/2026Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/24/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/19/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/09/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/09/2026No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
01/27/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/14/2026Fail-Final PL - Up to 9 Requested FloorsFailView ↗
11/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
Latest 25 of 59.
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
03/11/2026FinalRichard DeMarcoprogress
02/20/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
01/27/2026FinalRichard DeMarcoprogress
01/06/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
01/06/2026Post-installed AnchorsJOHN MCMONAGLEspecial
01/06/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
01/06/2026Post-installed AnchorsJOHN MCMONAGLEspecial
01/05/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/02/2025Post-installed AnchorsJOHN MCMONAGLEspecial
12/02/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/02/2025Post-installed AnchorsJOHN MCMONAGLEspecial
12/02/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/02/2025Post-installed AnchorsJOHN MCMONAGLEspecial
12/02/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/20/2025Post-installed AnchorsJOHN MCMONAGLEspecial
08/20/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/10/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/10/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/10/2025Post-installed AnchorsJOHN MCMONAGLEspecial
07/10/2025Post-installed AnchorsJOHN MCMONAGLEspecial
06/23/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/05/2025Post-installed AnchorsJOHN MCMONAGLEspecial
05/05/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/01/2025Post-installed AnchorsJOHN MCMONAGLEspecial
04/01/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
Latest 25 of 93.
▾Documents — 888 on file (BIS + DOB NOW)
▸Plans & Drawings76
▸DOB NOWPlans/Sketch76
09/01/2026M08036673-I1Request digital key ↗
09/01/2026M08036658-I1Request digital key ↗
09/01/2026M08023378-I1Request digital key ↗
Showing 3 of 76 on file for this type
▸Applications & Permits230
▸BISWORK PERMIT APPLICATION102
07/11/2025121237018Open ↗
07/03/2025121237018Open ↗
03/13/2025122212131Open ↗
Showing 3 of 102 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION76
07/10/2025121237018Open ↗
05/02/2025121237018Open ↗
02/27/2025121237018Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWLPC Approval/Permit50
09/01/2026M08014815-P1Open ↗
09/01/2026M08014815-I1Open ↗
08/27/2026M08023999-P2Open ↗
Showing 3 of 50 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLL114/19 PERMIT RESTRICTION1
09/19/2024141026262Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM3
10/30/2024121237018Open ↗
08/22/2024121237018Open ↗
Showing 2 of 3 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications205
▸DOB NOWDPL-1: Design Professional Seal & Signature75
09/01/2026M08036673-I1Open ↗
09/01/2026M08036658-I1Open ↗
09/01/2026M08023378-I1Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature56
09/21/2026M08023999-P2Open ↗
09/07/2026M08023999-P1Open ↗
09/02/2026M08023999-P3Open ↗
Showing 3 of 56 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
04/08/2019140271818Open ↗
04/08/2019140271836Open ↗
08/04/2017122184046Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026M00964740-P1Open ↗
09/01/2026M08023989-I1Open ↗
08/31/2026M00964740-S1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
04/25/2017122977975Open ↗
Showing 1 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
04/25/2017122977975Open ↗
Showing 1 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/09/2024141026262Open ↗
Showing 1 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/09/2024141026262Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
08/21/2017122204729Open ↗
08/16/2017122204729Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING7
02/27/2025121237018Open ↗
02/25/2025121237018Open ↗
02/06/2025121237018Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
03/29/2018123305075Open ↗
10/27/2017122184046Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
03/29/2018123305075Open ↗
01/09/2018123305075Open ↗
▸DOB NOWFDNY: Letter of No Objection1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes6
10/08/2019122212131Open ↗
10/31/2017122184046Open ↗
05/22/2017122977975Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
09/19/2024141026262Open ↗
▸Environmental & Asbestos70
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
09/01/2026M08022941-I1Open ↗
09/01/2026M08023014-I1Open ↗
08/27/2026M08022982-P2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form18
09/01/2026M08023378-I1Open ↗
09/01/2026M08014810-I1Open ↗
09/01/2026M08023951-I1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
08/04/2017122184046Open ↗
05/22/2017122977975Open ↗
Showing 2 of 15 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
04/25/2017122977975Open ↗
Showing 1 of 8 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY14
09/19/2024141026262Open ↗
Showing 1 of 14 on file for this type
▸BISHYDRO FLOW TEST LETTER3
08/04/2017122184046Open ↗
Showing 1 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/09/2024141026262Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs52
▸BISLANDMARKS APPROVAL23
07/30/2025121237018Open ↗
05/22/2017122977975Open ↗
Showing 2 of 23 on file for this type
▸BISSUPERSEDING LETTER6
07/11/2025121237018Open ↗
07/03/2025121237018Open ↗
11/15/2024121237018Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
04/08/2019140271818Open ↗
04/08/2019140271836Open ↗
03/12/2019140271818Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/13/2025122212131Open ↗
05/10/2024122212131Open ↗
08/04/2017122184046Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER5
03/13/2025122212131Open ↗
05/10/2024122212131Open ↗
01/10/2023122212131Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
03/23/2023121237018Open ↗
Showing 1 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership47
▸BISCOST AFFIDAVIT25
06/11/2025121237018Open ↗
04/28/2025121237018Open ↗
04/25/2017122977975Open ↗
Showing 3 of 25 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT11
05/22/2017122977975Open ↗
12/05/2016122739670Open ↗
Showing 2 of 11 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE10
11/15/2024121237018Open ↗
11/01/2019121237018Open ↗
05/08/2019121237018Open ↗
Showing 3 of 10 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
09/26/2024121237018Open ↗
▸Filing & Intake Forms76
▸BISADDITIONAL INFORMATION31
07/30/2025121237018Open ↗
03/19/2025121237018Open ↗
09/18/2024141026262Open ↗
Showing 3 of 31 on file for this type
▸BISBOROUGH INTAKE FORM21
03/13/2025122212131Open ↗
09/23/2024121237018Open ↗
09/06/2024121237018Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET19
01/05/2018123305075Open ↗
04/25/2017122977975Open ↗
Showing 2 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
09/09/2024141026262Open ↗
Showing 1 of 5 on file for this type
▸Other Documents59
▸DOB NOWProof of Historic Building45
09/01/2026M08014815-P1Open ↗
09/01/2026M08014815-I1Open ↗
08/27/2026M08023999-P3Open ↗
Showing 3 of 45 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
01/10/2023122212131Open ↗
01/10/2023122212131Open ↗
11/18/2020122212131Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type