HPD01/30/2026§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM
HPD01/30/2026§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 8A, 8th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD05/20/2024§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH, SOUTH, EAST WALLS AND CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 9A, 9th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD05/20/2024§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH, WEST & EAST WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 9A, 9th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD09/28/2018§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE BATHROOM LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD09/28/2018§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD09/28/2018§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT SOUTH AND WEST WALL IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
DOB07/31/2018FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
DOB08/30/2013FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012
ECB02/04/2020FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER I OBSERVED IN THE CELLAR HAVING FUTURE ON GAS LINES AND HAVING A UNION ON GAS LINE . ALSO IN CELLAR USING A JIM CAP ON WASTE LINE, REPAIR AND/REPLACENothing owed — awaiting certificate of correction
ECB02/04/2020FAILURE TO HAVE NEW ALTERED PLUMBING SYSTEM TESTED I OBSERVED IN THE CELLAR GAS LINES ROUGHED IN WITH GAS VALVES IN LAUNDRY ROOM WITHOUT HAVING PERMITS THEREFORE NO TEST, PERFORM TESTNothing owed — awaiting certificate of correction