RoofUnder Construction1p · 2 filings · 20 docs
Mechanical
Issued Permit Scope
Protection and Mechanical Methods
Installation of a suspended scaffold for Facade and repair as per plan submitted. No change to egress or occupancy.
On file for this project
21 documents · 1 drawing sheet
INSTALLATION AND USE OF MONORAIL AS PER PLANS
On file for this project
2 documents
BulkheadUnder Construction2p · 2 filings · 4 docs
ArchitectureElectricalStructural
INSTALLATION OF A TEMPORARY EAST HOIST COMPLEX (CARS 3 & 4) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY WEST HOIST COMPLEX (CARS 5 & 6) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST COMPLEX INSTALLED IN ACCORDANCE WITH 2022 NYCBC, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
Floor 39Under Construction33p · 1 filing · 20 docs
Fire ProtectionPlumbing
Issued Permit Scope
Sprinklers · Standpipe
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Floor 38Under Construction33p · 3 filings · 20 docs
Fire ProtectionPlumbing
Issued Permit Scope
Protection and Mechanical Methods · Sprinklers · Standpipe
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 37Under Construction13p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 36Under Construction13p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
Underground work for New Building
On file for this project
467 documents · 2 drawing sheets
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 35Under Construction13p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 34Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 33Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 32Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 31Under Construction12p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 30Under Construction13p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 2 drawing sheets
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 29Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 28Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 27Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 26Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 25Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 24Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 23Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 22Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 21Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 20Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 19Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 18Under Construction12p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 17Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 16Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 15Under Construction12p · 3 filings · 20 docs
ElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 2 drawing sheets
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents · 1 drawing sheet
Floor 14Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 13Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 12Under Construction12p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY WEST SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYCBC, CHAPTER 33.
On file for this project
8 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 11Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 10Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 9Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 8Under Construction12p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents · 1 drawing sheet
Floor 7Under Construction12p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Use of temporary scissor lift construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Floor 6Under Construction12p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 5Under Construction12p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 1 drawing sheet
Use of temporary mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Use of temporary glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 4Under Construction13p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 2 drawing sheets
INSTALLATION OF A TEMPORARY WEST SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYCBC, CHAPTER 33.
On file for this project
8 documents · 1 drawing sheet
Use of temporary mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB M08015986-l1.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 3Under Construction524p · 8 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INSTALLATION AND MAINTENANCE OF TEMPORARY STRUCTURES IN CONJUNCTION WITH NEW BUILDING JOB #M08015986-I1, NO CHANGE TO USE OCCUPANCY OR EGRESS, THIS TEMP OFFICE WILL USED ONLY BY CONSTRUCTION PERSONNEL WITH OSHA CERTIFICATE.
On file for this project
3 documents · 3 drawing sheets
Underground work for New Building
On file for this project
467 documents · 4 drawing sheets
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2Under Construction504p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 3 drawing sheets
Floor 1Under Construction509p · 5 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 6 drawing sheets
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
6 documents
Use of telehandler for facade panel installation. This application is filed in conjunction with NB M08015986-I1
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
CellarUnder Construction514p · 3 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 10 drawing sheets
INSTALLATION OF A TEMPORARY WEST SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYCBC, CHAPTER 33.
On file for this project
8 documents · 2 drawing sheets
INSTALLATION OF A TEMPORARY CELLAR HOIST COMPLEX (CAR 7) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH 2022 NYCBC, CHAPTER 33.
On file for this project
6 documents · 1 drawing sheet
Sub-CellarUnder Construction515p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Underground work for New Building
On file for this project
467 documents · 13 drawing sheets
INSTALLATION OF A TEMPORARY CELLAR HOIST COMPLEX (CAR 7) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH 2022 NYCBC, CHAPTER 33.
On file for this project
6 documents · 1 drawing sheet