← Back
Elevator cooperative
3400 FT INDEPENDENCE ST
BRONX · BIN 2015820
💬 Discuss this project
1965Year Built
22Stories
D4Building Class
R6Zoning
232,808 sfGross Floor Area
171Units
LL97 CoveredRent Stabilized64 Open Violations 46 unresolved · 18 paperwork only ▸FISP: UNSAFE
Elevator cooperative · Owner of record: CANNON HEIGHTS INC · 53,000 sf lot · 4.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 5 filings · 20 docs
Floor 15Under Construction24p · 3 filings · 20 docs
Floor 14Under Construction24p · 3 filings · 20 docs
Floor 13Under Construction24p · 3 filings · 20 docs
Floor 12Under Construction24p · 3 filings · 20 docs
Floor 11Under Construction24p · 3 filings · 20 docs
Floor 10Under Construction24p · 3 filings · 20 docs
Floor 9Under Construction24p · 3 filings · 20 docs
Floor 8Under Construction24p · 3 filings · 20 docs
Floor 7Under Construction24p · 3 filings · 20 docs
Floor 6Under Construction24p · 3 filings · 20 docs
Floor 5Under Construction24p · 3 filings · 20 docs
Floor 4Under Construction24p · 3 filings · 20 docs
Floor 3Under Construction24p · 3 filings · 20 docs
Floor 2Under Construction24p · 4 filings · 20 docs
Floor 1Under Construction24p · 4 filings · 20 docs
Sub-CellarUnder Construction17p · 2 filings · 19 docs
Sub-BasementUnder Construction17p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO MANAGEMENT DEVELOPMENT7009/01/2026
METRO MANAGEMENT DEV607/08/2026
CONSTRUCTION SVS CON NY1103/22/2026
CSC403/22/2026
CANON HEIGHTS INC203/22/2026
METRO MANAGEMENT CANNON H203/22/2026
TIMCO RENOVATION CORP103/22/2026
CANNON HEIGHTS INC METRO103/22/2026
CANNON HEIGHT INC/CANN203/22/2026
CSC OF NY INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS102/20/2026
NAVKIRAN CHEEMA102/09/2026
KZ ENGINEERING, P.C204/22/2025
MSM ENGINEERING SERVICES, PLLC209/04/2024
LAWLESS AND MANGIONE401/09/2024
AZIMUTH ENGINEERING205/25/2021
GREEN DESIGN107/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP403/21/2026
BG & ASSOCIATES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION SVS CON NYGeneral Contractor1203/21/2026
AM&G WATERPROOFING LLCGeneral Contractor907/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor707/28/2026
WILL-DO PLUMBING INCPlumbing607/08/2026
THE METRO GROUP, INCGeneral Contractor607/08/2026
VAN VASSELLElectrical203/21/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor203/21/2026
QNCC ELEC'L CONTR CORPElectrical103/22/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
ACCORD POWER INCGeneral Contractor107/08/2026
NEWBRIDGE DATACOM, INCGeneral Contractor107/08/2026
THOMAS KELLYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561102/20/2026
KZ ENGINEERING, P.C.4665404/22/2025
SPECIAL TESTING & CONSULT1688401/09/2024
JEREMY K MCKEON, P.E.7263205/25/2021
Building Lifecycle
All (196)Filed (15)Permit Issued (30)Signed Off (1)Facade (FISP) (13)Violation (60)Inspection (9)Objection (38)Special Inspection (30)
08/31/2026
Permit issued — Suspended Scaffold
X01069261-I1-SC
07/27/2026
Permit issued — Sidewalk Shed
X01080955-I1-SH
07/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2026
Permit issued — Suspended Scaffold
X01069261-I1-SC
05/31/2026
Violation issued (HPD, open)
B
05/31/2026
Violation issued (HPD, closed)
B
05/31/2026
Violation issued (HPD, open)
A
05/31/2026
Violation issued (HPD, closed)
A
05/31/2026
Violation issued (HPD, open)
B
05/31/2026
Violation issued (HPD, closed)
B
05/31/2026
Violation issued (HPD, open)
B
05/31/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (HPD, closed)
A
05/20/2026
Violation issued (HPD, closed)
B
05/20/2026
Violation issued (HPD, closed)
B
05/09/2026
Violation issued (HPD, closed)
A
04/29/2026
Permit issued — Mechanical Systems
X00902513-I1-MS
04/27/2026
Violation issued (HPD, open)
B
04/27/2026
Violation issued (HPD, open)
B
04/27/2026
Violation issued (HPD, open)
B
04/27/2026
Violation issued (HPD, open)
B
04/27/2026
Violation issued (HPD, open)
C
04/27/2026
Violation issued (HPD, open)
A
04/27/2026
Violation issued (HPD, open)
C
04/27/2026
Violation issued (HPD, closed)
B
04/20/2026
Permit issued — Solar
X01317877-I1-SL
04/17/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Addressed
04/16/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/02/2026
Permit issued — Plumbing
X00902535-I1-PL
03/27/2026
Objection resolved — Addressed
03/10/2026
Objection raised — Other
03/10/2026
Objection raised — Other
03/10/2026
Objection raised — Other
03/02/2026
Signed off — Alteration
Installation of suspended scaffold for facade inspection/ Repair
X01188370-I1
03/02/2026
Permit issued — Structural
X00902567-I1-GC-CX
03/02/2026
Permit issued — General Construction
X00902483-I1-GC
02/20/2026
Filed — Alteration
Installation of 95.58 kw solar energy system on roof. No change of occupancy, use or egress.
X01317877-I1
02/10/2026
Permit issued — Supported Scaffold
X01356234-I1-SF
02/09/2026
Filed — Alteration
X01356234-I1
01/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/12/2025
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
11/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
11/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
11/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
11/12/2025
Special inspection requirement — Final
Malathi Ananthakrishnan
11/06/2025
Violation issued (HPD, closed)
C
09/16/2025
Permit issued — Plumbing
X00902535-I1-PL
08/08/2025
Permit issued — Sidewalk Shed
X01080955-I1-SH
08/08/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/08/2025
Permit issued — Mechanical Systems
X00902513-I1-MS
06/26/2025
Permit issued — Suspended Scaffold
X01069261-I1-SC
06/10/2025
Permit issued — Mechanical Systems
X00902513-I1-MS
04/30/2025
Permit issued — Plumbing
X00902535-I1-PL
04/22/2025
Filed — Alteration
Installation of suspended scaffold for facade inspection/ Repair
X01188370-P1
04/21/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC08/31/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC07/27/2026
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC06/26/2026
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC04/29/2026
DOB NOWSolarPermit IssuedACCORD POWER INC04/20/2026
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP04/02/2026
DOB NOWStructuralPermit IssuedAM&G WATERPROOFING LLC03/02/2026
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC03/02/2026
DOB NOWSupported ScaffoldPermit IssuedDYNAMIX SCAFFOLD GROUP LL02/10/2026
DOB NOWPlumbingPermit IssuedWILL-DO PLUMBING INC09/16/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC08/08/2025
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC07/08/2025
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC06/26/2025
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC06/10/2025
DOB NOWPlumbingPermit IssuedWILL-DO PLUMBING INC04/30/2025
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC03/06/2025
DOB NOWSuspended ScaffoldSigned-offAM&G WATERPROOFING LLC03/05/2025
DOB NOWStructuralPermit IssuedAM&G WATERPROOFING LLC03/05/2025
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC11/13/2024
DOB NOWPlumbingPermit IssuedWILL-DO PLUMBING INC09/24/2024
DOB NOWStructuralPermit IssuedAM&G WATERPROOFING LLC09/19/2024
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC09/19/2024
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC08/23/2024
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC08/22/2024
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC07/01/2024
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTION SVS CON NY05/17/2023
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTION SVS CON NY12/09/2022
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTION SVS CON NY09/22/2021
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTION SVS CON NY07/23/2020
DOB NOWAntennaPermit IssuedNEWBRIDGE DATACOM, INC06/03/2020
BISPLISSUEDDUAL FUEL PLUBING & HTING07/11/2022
BISPLISSUEDDUAL FUEL PLUBING & HTING02/16/2021
BISBLISSUEDDUAL FUEL PLUBING & HTING12/16/2020
BISFSISSUEDAMERICAN BOILER & WELDING06/24/2020
BISPLISSUEDDUAL FUEL PLUBING & HTING02/21/2020
BISFBISSUEDAMERICAN BOILER & WELDING10/16/2019
BISBLISSUEDDUAL FUEL PLUBING & HTING10/07/2019
BISFSISSUEDAMERICAN BOILER & WELDING05/29/2019
BISFSISSUEDAMERICAN BOILER & WELDING02/11/2019
BISPLISSUEDDUAL FUEL PLUBING & HTING02/06/2019
+ 23 more permits on file
1 project · most recent 01/08/2024
Ventilation Systems
FiledStatusContractorScope
01/08/2024Permit IssuedTHE METRO GROUP, INCVentilation Systems
1 project · most recent 01/09/2024
Storm Water/Sanitary
FiledStatusContractorScope
01/09/2024Permit IssuedDEPENDABLE MECH CORPStorm, Water/Sanitary
11 projects · most recent 02/18/2026
General Wiring Boiler Controls Lighting
FiledStatusContractorScope
02/18/2026Permit IssuedACCORD POWER ELECTRIC LLC—
12/04/2025CompleteTHE METRO GROUP ELECTRICGeneral Wiring
02/25/2025CompleteTHE METRO GROUP ELECTRIC—
01/13/2025Permit IssuedTHE METRO GROUP ELECTRICGeneral Wiring
08/23/2024Permit IssuedBOROWIDE ELECT'L CONTR'S—
06/28/2023CompleteJOHN STASSIGeneral Wiring
10/30/2019CompleteQNCC ELEC'L CONTR CORP—
06/24/2019CompleteP.S. MARCATO ELEV. CO INC—
05/29/2019Permit IssuedBOROWIDE ELECT'L CONTR'S—
09/09/2018CompleteITKIN ELECTRIC CORP.Boiler Controls
01/23/2018CompleteSCIENTIFIC ELEC. CO. INCGeneral Wiring, Lighting
1 project · most recent 01/04/2024
Concrete
FiledStatusContractorScope
01/04/2024Permit IssuedAM&G WATERPROOFING LLCConcrete
2 projects · most recent 09/04/2024
Sidewalk Shed
FiledStatusContractorScope
09/04/2024Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
07/23/2020Permit IssuedCONSTRUCTION SVS CON NYSidewalk Shed
1 project · most recent 08/08/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/08/2024Permit IssuedAM&G WATERPROOFING LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
11/12/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
11/12/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
11/12/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
11/12/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
11/12/2025FinalMalathi Ananthakrishnanprogress
04/21/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
04/21/2025Post-installed AnchorsKarol Zdancewiczspecial
08/23/2024Post-installed AnchorsKarol Zdancewiczspecial
08/23/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/08/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/08/2024Post-installed AnchorsKarol Zdancewiczspecial
01/31/2024Maintenance informationjamal tahaenergy_progress
12/26/2023Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
07/11/2023Finaljamal tahaprogress
07/11/2023Energy Code Compliance Inspectionsjamal tahaprogress
07/11/2023HVAC-R and service water heating system controlsjamal tahaenergy_progress
07/11/2023HVAC-R and service water heating equipmentjamal tahaenergy_progress
07/11/2023Concrete - Cast-In-PlaceSEBASTIAN SETTEDUCATE JR., P.Especial
07/11/2023Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
07/11/2023Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
07/11/2023Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
07/11/2023FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/11/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/11/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/11/2023MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 34.
▾Documents — 222 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch13
08/21/2026X00902483-I1Request digital key ↗
08/21/2026X00902483-P1Request digital key ↗
08/21/2026X00902567-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Antenna2
08/25/2026X00325362-P1Request digital key ↗
08/25/2026X00325362-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00374809-I1Request digital key ↗
▸Applications & Permits34
▸BISWORK PERMIT APPLICATION19
02/13/2019220480352Open ↗
01/10/2018220534465Open ↗
01/10/2018220534465Open ↗
Showing 3 of 19 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
08/24/2021220534465Open ↗
04/08/2021220534465Open ↗
11/02/2020220534465Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/25/2026X00325362-I1Open ↗
08/21/2026X00902483-P1Open ↗
08/21/2026X00902483-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026X01317877-I1Open ↗
09/02/2026X01317877-I1Open ↗
09/02/2026X00902483-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/16/2018220480352Open ↗
01/10/2018220534465Open ↗
01/10/2018220534465Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026X01317877-I1Open ↗
09/02/2026X01317877-I1Open ↗
09/02/2026X01317877-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
01/16/2018220480352Open ↗
10/03/2016240149521Open ↗
09/12/2012220228439Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
01/16/2018220480352Open ↗
04/25/2017240180512Open ↗
12/28/2016240166235Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
04/25/2017240180512Open ↗
12/28/2016240166235Open ↗
07/24/2016240149521Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/25/2017240180512Open ↗
12/28/2016240166235Open ↗
07/24/2016240149521Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/05/2012220228439Open ↗
02/07/2008210033275Open ↗
07/12/2007210003878Open ↗
▸BISPC FULL REPORT2
02/07/2008210033275Open ↗
07/12/2007210003878Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
02/12/2020220534465Open ↗
11/08/2017220534465Open ↗
09/22/2017220534465Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes4
01/16/2018220480352Open ↗
09/22/2017220534465Open ↗
12/28/2016240166235Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan3
08/25/2026X00325362-I1Open ↗
08/13/2026X00374809-I1Open ↗
08/13/2026X00325362-P1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026X00325362-I1Open ↗
08/21/2026X00902483-P1Open ↗
08/21/2026X00902483-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/28/2016240166235Open ↗
07/24/2016240149521Open ↗
09/05/2012220228439Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
01/16/2018220480352Open ↗
01/10/2018220534465Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
02/07/2008210033275Open ↗
07/12/2007210003878Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026X01317877-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/19/2017220534465Open ↗
09/22/2017220534465Open ↗
09/05/2012220228439Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/08/2023220534465Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/28/2016240166235Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/08/2023220534465Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
08/08/2023220534465Open ↗
06/21/2021220480352Open ↗
06/21/2021220480352Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs28
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/21/2026X00902483-P1Open ↗
08/21/2026X01069261-I1Open ↗
08/17/2026X01317877-I1Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
08/14/2023220534465Open ↗
06/21/2021220480352Open ↗
05/11/2017210033275Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/05/2012220228439Open ↗
09/05/2012220228439Open ↗
02/07/2008210033275Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER3
09/08/2015210003878Open ↗
07/03/2014210003878Open ↗
06/01/2011210003878Open ↗
▸BISCCD1-Construction Code Determination1
01/10/2013220228439Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/28/2007210003878Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
08/08/2023220534465Open ↗
06/21/2021220480352Open ↗
06/21/2021220480352Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION8
08/25/2021220534465Open ↗
04/30/2021220534465Open ↗
12/16/2020220534465Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/25/2017240180512Open ↗
12/28/2016240166235Open ↗
07/24/2016240149521Open ↗
▸BISEFILING COVER SHEET3
01/16/2018220480352Open ↗
09/22/2017220534465Open ↗
09/05/2012220228439Open ↗
▸BISBOROUGH INTAKE FORM2
02/12/2020220534465Open ↗
11/08/2017220534465Open ↗
▸Other Documents9
▸DOB NOWManufacturer's Specifications4
08/21/2026X01069261-I1Open ↗
08/13/2026X01188370-I1Open ↗
08/13/2026X01188370-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/21/2026X01069261-I1Open ↗
08/13/2026X01188370-I1Open ↗
08/13/2026X01069261-P1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/12/2009210003878Open ↗