HPD11/05/2025§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD11/05/2025§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD11/04/2022§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 16 SQ. FT. AT NORTH WALL, 16 SQ. FT. AT EAST WALL, 16 SQ. FT. AT SOUTH WALL, 16 SQ. FT. AT WEST WALL AND 25 SQ. FT. AT CEILING. APPROX 89 SQ.FT IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
ECB06/16/2026OBSERVED AT EXPOSURE#2 NUMEROUS WINDOW A/C UNITS INSTALLED WITHOUT PROPER BRACKETS., REPAIR AND/OR REPLACE; INSTALL AS PER MANUFACTURE SPECS.Hearing held — result not yet published$1K proposed