← Back
BuildNYC
One story retail building
3403 JEROME AVENUE
BRONX · BIN 2017697
💬 Discuss this project
1930Year Built
1Stories
K1Building Class
R7-1Zoning
8,250 sfGross Floor Area
9Units
0 Active Violations
One story retail building · Owner of record: Moshcorn Realty · 8,300 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Restaurant plumbing and gas fixture replacement6p · 2 filings · 19 docs
CellarRestaurant plumbing and gas fixture replacement2p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Moshcom Realty1503/21/2026
Faceblue103/22/2026
Eddes103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Grace412/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Architectual Concept803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
John Fitzgerald Plumbing & HeatingPlumbing307/08/2026
Green Construction GroupGeneral Contractor203/21/2026
Approved ElectricElectrical103/21/2026
Willdan Electrical of NYElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Grace Engineering2176412/27/2023
Building Lifecycle
All (18)Filed (4)Permit Issued (2)Violation (1)Inspection (2)Special Inspection (9)
12/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
12/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
TARIQ SIDDIQUI
12/27/2023
Filed — Alteration
REPLACE EXISTING RESTURANT PLUMBING AND GAS FIXTURES AS PER DRAWAINGS. ANSUL SYSTEM WILL BE FILED UNDER SEPARATE APPLICATION NUMBER.
X00932393-P1
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
12/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
TARIQ SIDDIQUI
12/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2023
Permit issued — Plumbing
X00932393-I1-PL
11/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
11/03/2023
Special inspection requirement — Mechanical Systems
TARIQ SIDDIQUI
11/03/2023
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
11/03/2023
Special inspection requirement — Final
TARIQ SIDDIQUI
11/03/2023
Special inspection requirement — Air barrier - visual inspection
TARIQ SIDDIQUI
11/02/2023
Filed — Alteration
Interior renovation of existing restaurant to replace walls, ceiling sheetrock, floor tiles, and kitchen exhaust hood, as per drawings herewith filed. No change in egress, use, or occupancy.
X00930340-P1
11/02/2023
Filed — Alteration
REPLACE EXISTING RESTURANT PLUMBING AND GAS FIXTURES AS PER DRAWAINGS. ANSUL SYSTEM WILL BE FILED UNDER SEPARATE APPLICATION NUMBER.
X00932393-I1
09/20/2023
Permit issued — General Construction
X00930340-I1-GC-CX
09/12/2023
Filed — Alteration
Interior renovation of existing restaurant to replace walls, ceiling sheetrock, floor tiles, and kitchen exhaust hood, as per drawings herewith filed. No change in egress, use, or occupancy.
X00930340-I1
01/09/2006
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating12/06/2023
DOB NOWGeneral ConstructionPermit IssuedGreen Construction Group09/20/2023
BISPLISSUEDAvon Plumbing & Heating08/20/2015
BISOTISSUEDTrend 21 Management11/13/2013
BISPLISSUEDAvon Plumbing & Heating11/13/2013
BISFPISSUEDNY Fire10/10/2012
BISOTISSUEDYung Way Construction08/01/2012
BISPLISSUEDCochrane Plumbing & Heating07/31/2012
BISMHISSUEDJem Fire Prevention03/09/2006
BISOTISSUEDNara Construction10/26/2005
BISPLISSUEDA P Plumbing & Heating10/28/2004
BISMHISSUEDAlhu Construction10/14/2004
BISOTISSUEDAll Technical Art06/29/2004
BISEQISSUEDAll Technical Art06/29/2004
BISOTISSUEDUnitech Design09/03/2003
BISFPISSUEDFire Foe Systems05/19/2003
BISPLISSUEDCatman Plumbing03/31/2003
BISOTISSUEDUniversal Groups of NY03/17/2003
BISEQISSUEDUniversal Groups of NY03/17/2003
BISFPISSUEDMaster Fire Systems05/28/2002
BISPLISSUEDVitello P & Mechanical03/08/1999
BISMHISSUEDHeatmaster Mechanical03/08/1999
BISPLISSUEDVitello P & Mechanical10/02/1998
BISMHISSUEDHeatmaster Mechanical10/02/1998
1 project · most recent 11/02/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/02/2023Permit IssuedGreen Construction GroupVentilation Systems
Ventilation
Dayton Dayton Model number 56JN93 4,313 CFM · Kitchen Exhaust ×1
1 project · most recent 12/27/2023
Gas Water/Sanitary
FiledStatusContractorScope
12/27/2023Signed-offJohn Fitzgerald Plumbing & HeatingGas, Water/Sanitary
2 projects · most recent 11/14/2023
General Wiring
FiledStatusContractorScope
11/14/2023Permit IssuedAscuatech ElectricalGeneral Wiring
02/07/2018CompleteWilldan Electrical of NY—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/28/2023Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
12/28/2023HVAC-R and service water piping design and insulationTARIQ SIDDIQUIenergy_progress
12/27/2023Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
12/27/2023HVAC-R and service water piping design and insulationTARIQ SIDDIQUIenergy_progress
11/03/2023Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
11/03/2023Mechanical SystemsTARIQ SIDDIQUIspecial
11/03/2023Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
11/03/2023FinalTARIQ SIDDIQUIprogress
11/03/2023Air barrier - visual inspectionTARIQ SIDDIQUIenergy_progress
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026X00930340-I1Request digital key ↗
08/22/2026X00930340-P1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
11/14/2013220344223Open ↗
11/14/2013220344223Open ↗
11/14/2013220344223Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
08/28/2015220344223Open ↗
11/04/2013220344223Open ↗
10/10/2012220196776Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature5
09/22/2026X00932393-P1Open ↗
09/01/2026X00932393-I1Open ↗
08/24/2026X00930340-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026X00930340-P1Open ↗
08/22/2026X00930340-I1Open ↗
08/13/2026X00932393-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/22/2026X00932393-P1Open ↗
09/01/2026X00932393-I1Open ↗
08/24/2026X00930340-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
11/04/2013220344223Open ↗
09/10/2012220196785Open ↗
07/17/2012220196776Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/28/2015220344223Open ↗
11/04/2013220344223Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/04/2013220344223Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING3
11/04/2013220344223Open ↗
10/10/2012220196776Open ↗
07/17/2012220196776Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
11/06/2015220344223Open ↗
11/04/2015220344223Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/06/2012220196776Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/28/2015220344223Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026X00930340-P1Open ↗
08/22/2026X00930340-I1Open ↗
08/13/2026X00932393-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/04/2013220344223Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/04/2013220344223Open ↗
07/17/2012220196776Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
09/10/2012220196785Open ↗
07/17/2012220196776Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/10/2012220196785Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/04/2013220344223Open ↗
09/10/2012220196785Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
11/04/2013220344223Open ↗
09/10/2012220196785Open ↗
07/17/2012220196776Open ↗
▸BISADDITIONAL INFORMATION1
08/28/2015220344223Open ↗