3403 TIBBETT AVENUE
BRONX · BIN 2083818
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R4Zoning
2,200 sfGross Floor Area
1Units
0 Active Violations
Two stories - detached, small or mid-size · 3,000 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 15p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2022$660K—Private party → Private party$300/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL Engineering402/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J Building Consulting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Splen ConstructionGeneral Contractor107/08/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781402/08/2023
Building Lifecycle
05/25/2023
Signed off — Alteration
INTERIOR RENOVATION AT CELLAR AND 1ST FLOOR OF EXISTING TWO STORIES BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HERE. PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X00786306-I1
05/25/2023
Signed off — Alteration
INTERIOR RENOVATION AT CELLAR AND 1ST FLOOR OF EXISTING TWO STORIES BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HERE. PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
X00786306-S1
02/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
45 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG08/15/2022
DOB NOWGeneral ConstructionSigned-offSplen Construction08/12/2022
2 projects · most recent 06/30/2023
General Wiring
FiledStatusContractorScope
06/30/2023CompleteAstro Electrical Contng—
06/14/2023CompleteAstro Electrical ContngGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
02/09/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/09/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/09/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/09/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
02/09/2023Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
02/09/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
02/09/2023Lighting controlsCHRISTIAN LOZADAenergy_progress
02/09/2023Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
02/09/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
02/09/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
02/09/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
02/09/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
02/09/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
02/08/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/08/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/08/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/08/2023Lighting controlsCHRISTIAN LOZADAenergy_progress
02/08/2023Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
02/08/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
02/08/2023Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
02/08/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
02/08/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
02/08/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
02/08/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
02/08/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
Latest 25 of 40.
26 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account