← Back
BuildNYC
Over six families without stores
3408 FARRAGUT ROAD
BROOKLYN · BIN 3428731
💬 Discuss this project
0Year Built
—Stories
C1Building Class
R6Zoning
5,610 sfGross Floor Area
9Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 3408-3410 Farragut RD · 2,000 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew sprinkler system for building31p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 3 docs
PenthouseNew sprinkler system for building31p · 2 filings · 20 docs
Floor 4New sprinkler system for building32p · 3 filings · 20 docs
Floor 3New sprinkler system for building27p · 2 filings · 20 docs
Floor 2New sprinkler system for building29p · 2 filings · 20 docs
Floor 1New sprinkler system for building30p · 4 filings · 20 docs
CellarNew sprinkler system for building40p · 5 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed15p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2288 Atlantic2007/08/2026
Cavu Property Group1107/08/2026
Five-O Associates103/21/2026
3408-3410 Farragut RD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ellipses Design503/21/2026
Advanced Builders Services303/21/2026
AE Design Solution203/21/2026
Geiger E A Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & Y DevelopersGeneral Contractor1707/08/2026
Manhattan D EnterprisesScaffold603/21/2026
M & Y DevelopersScaffold407/08/2026
Central Scaffold & HoistScaffold303/21/2026
M & Y Developersspecialty_contractor303/21/2026
Rightway Plumbing and HeatingFire Protection207/08/2026
Master InsideGeneral Contractor103/22/2026
Best Mechanical ServicesPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616406/13/2022
Building Lifecycle
06/12/2026
§ 27-2033 ADM code provide ready access to buildings heating system locked door at cellar at boiler room
HPD violation · open
06/12/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD violation · open
03/19/2026
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
HPD violation · closed
03/19/2026
§ 27-2033 ADM code provide ready access to buildings heating system door to boiler room locked at basement
HPD violation · open
10/09/2023
BF35:
FDNY_NOV violation · closed
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offM & Y Developers05/08/2023
DOB NOWMechanical SystemsSigned-offM & Y Developers04/24/2023
DOB NOWSprinklersSigned-offRightway Plumbing and Heating11/03/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises09/14/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises09/14/2022
DOB NOWPlumbingSigned-offBest Mechanical Services07/15/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating07/13/2022
DOB NOWFoundationSigned-offM & Y Developers06/21/2022
DOB NOWEarth WorkSigned-offM & Y Developers05/13/2022
DOB NOWConstruction FenceSigned-offM & Y Developers05/11/2022
DOB NOWSupport of ExcavationSigned-offM & Y Developers05/11/2022
DOB NOWSidewalk ShedSigned-offCentral Scaffold & Hoist04/15/2022
DOB NOWConstruction FenceSigned-offM & Y Developers04/06/2022
BIS—ISSUEDM & Y Developers05/18/2022
3 projects · most recent 11/21/2022
General Wiring
FiledStatusContractorScope
11/21/2022CompletePower Direct ElectricGeneral Wiring
06/01/2022CompletePower Direct Electric—
04/13/2022CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/03/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/27/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/05/2022Seismic Isolation SystemsFAHAD FATEHspecial
07/05/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/05/2022Sprinkler SystemsFAHAD FATEHspecial
07/05/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/05/2022Post-installed AnchorsFAHAD FATEHspecial
07/05/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
07/01/2022Seismic Isolation Systems—special
06/28/2022Fire-Resistance Rated Construction—progress
06/28/2022Fire-Resistant Penetrations and Joints—special
06/28/2022Post-installed Anchors—special
06/28/2022Sprinkler Systems—special
06/28/2022Energy Code Compliance Inspections—progress
06/13/2022Structural Steel - DetailsFAHAD FATEHspecial
06/08/2022FinalFAHAD FATEHprogress
06/08/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
06/08/2022MasonryFAHAD FATEHspecial
06/08/2022Structural Cold-Formed SteelFAHAD FATEHspecial
06/08/2022Subgrade InspectionsFAHAD FATEHspecial
04/26/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
04/26/2022FinalFAHAD FATEHprogress
04/26/2022Subgrade InspectionsFAHAD FATEHspecial
03/21/2022FinalFAHAD FATEHprogress
03/21/2022Footing and FoundationFAHAD FATEHprogress
130 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account