Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTishmanspeyer8 filings
Project M00346386Signed-off · 02/18/2023
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
2 documents
Project M00659809Signed-off · 01/10/2023
INSTALLATION OF PLATFORM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
1 document
Project M00335950Signed-off · 06/27/2022
FILING HEREWITH FOR INSTALLATION AND MODIFICATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING WORK AS PER PLANS.
On file for this project
8 documents
Latest 3 of 8 filings on this floor.
RoofFuel oil tank and piping installation8p · 4 filings
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M00586183Signed-off · 03/22/2022
Installation of fuel oil storage tank in sub-cellar, install fuel oil piping system from storage tank to diesel generator sub base tank on the roof. No change of occupancy, egress or occupancy.
On file for this project
8 documents
Project M00349669Signed-off · 12/28/2021
Filing herewith for creation of raised or slab on grade at 1st floor. Creation of new shaft opening, bulkheads, new overbuild construction on top of the 7th floor, new skylight openings and new mechanical rooms. Provide support for mechanical equipment.
On file for this project
10 documents
Project M00600018Signed-off · 12/08/2021
INSTALLATION AND USE OF TEMPORARY MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
1 document
Latest 3 of 4 filings on this floor.
BulkheadPipe scaffold installation2p · 2 filings
ArchitectureGeneralMechanicalStructural
Project M00497527Signed-off · 03/16/2022
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCy.
On file for this project
7 documents
Project M00349669Signed-off · 12/28/2021
Filing herewith for creation of raised or slab on grade at 1st floor. Creation of new shaft opening, bulkheads, new overbuild construction on top of the 7th floor, new skylight openings and new mechanical rooms. Provide support for mechanical equipment.
On file for this project
10 documents
Floor 10Tishmanspeyer3p · 4 filings
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M00331521Signed-off · 06/29/2022
Filing herewith for removal and installation of sprinklers heads for temporary core protection as per plans.
On file for this project
27 documents
Project M00286452Signed-off · 03/09/2022
Filing herewith for Plumbing work as per plans. Removal and relocations of existing fixtures and associated piping. Cap piping back to stack. No change to use, egress or occupancy.
On file for this project
5 documents
Project M00349669Signed-off · 12/28/2021
Filing herewith for creation of raised or slab on grade at 1st floor. Creation of new shaft opening, bulkheads, new overbuild construction on top of the 7th floor, new skylight openings and new mechanical rooms. Provide support for mechanical equipment.
On file for this project
10 documents
Latest 3 of 4 filings on this floor.
Floor 9Tishmanspeyer2p · 4 filings
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M00331521Signed-off · 06/29/2022
Filing herewith for removal and installation of sprinklers heads for temporary core protection as per plans.
On file for this project
27 documents
Project M00286452Signed-off · 03/09/2022
Filing herewith for Plumbing work as per plans. Removal and relocations of existing fixtures and associated piping. Cap piping back to stack. No change to use, egress or occupancy.
On file for this project
5 documents
Project M00349669Signed-off · 12/28/2021
Filing herewith for creation of raised or slab on grade at 1st floor. Creation of new shaft opening, bulkheads, new overbuild construction on top of the 7th floor, new skylight openings and new mechanical rooms. Provide support for mechanical equipment.
On file for this project
10 documents
Latest 3 of 4 filings on this floor.
Floor 8Tishmanspeyer2p · 3 filings
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M00331521Signed-off · 06/29/2022
Filing herewith for removal and installation of sprinklers heads for temporary core protection as per plans.
On file for this project
27 documents
Project M00286452Signed-off · 03/09/2022
Filing herewith for Plumbing work as per plans. Removal and relocations of existing fixtures and associated piping. Cap piping back to stack. No change to use, egress or occupancy.
On file for this project
5 documents
Project M00286404Signed-off · 12/28/2021
Filing herewith for Mechanical work as per plans. Removal of existing Units and associated supply. Return & Transfer air ductwork, duct heaters, piping back to valve, drainage, power and controls. No change to use, egress or occupancy. (Package 1B.1)
On file for this project
4 documents
Floor 7Tishmanspeyer3p · 6 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M00331521Signed-off · 06/29/2022
Filing herewith for removal and installation of sprinklers heads for temporary core protection as per plans.
On file for this project
27 documents
Project M00286452Signed-off · 03/09/2022
Filing herewith for Plumbing work as per plans. Removal and relocations of existing fixtures and associated piping. Cap piping back to stack. No change to use, egress or occupancy.
On file for this project
5 documents
Project M00349669Signed-off · 12/28/2021
Filing herewith for creation of raised or slab on grade at 1st floor. Creation of new shaft opening, bulkheads, new overbuild construction on top of the 7th floor, new skylight openings and new mechanical rooms. Provide support for mechanical equipment.
On file for this project
10 documents
Latest 3 of 6 filings on this floor.
Floor 6Plumbing fixture and piping relocation2p · 4 filings
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M88890963Signed-off · 06/29/2022
Filing herewith for post approval amendment to submit revised plans.
Project M00286452Signed-off · 03/09/2022
Filing herewith for Plumbing work as per plans. Removal and relocations of existing fixtures and associated piping. Cap piping back to stack. No change to use, egress or occupancy.
On file for this project
5 documents
Project M00286404Signed-off · 12/28/2021
Filing herewith for Mechanical work as per plans. Removal of existing Units and associated supply. Return & Transfer air ductwork, duct heaters, piping back to valve, drainage, power and controls. No change to use, egress or occupancy. (Package 1B.1)
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 5Plumbing fixture and piping relocation2p · 4 filings · 2 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M88890963Signed-off · 06/29/2022
Filing herewith for post approval amendment to submit revised plans.
Project M00286452Signed-off · 03/09/2022
Filing herewith for Plumbing work as per plans. Removal and relocations of existing fixtures and associated piping. Cap piping back to stack. No change to use, egress or occupancy.
On file for this project
5 documents
Project M00286404Signed-off · 12/28/2021
Filing herewith for Mechanical work as per plans. Removal of existing Units and associated supply. Return & Transfer air ductwork, duct heaters, piping back to valve, drainage, power and controls. No change to use, egress or occupancy. (Package 1B.1)
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 4Plumbing fixture and piping relocation1 filing
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M00286452Signed-off · 03/09/2022
Filing herewith for Plumbing work as per plans. Removal and relocations of existing fixtures and associated piping. Cap piping back to stack. No change to use, egress or occupancy.
On file for this project
5 documents
Floor 3
Floor 2Work platform installation1p · 2 filings · 2 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M00495853Signed-off · 03/23/2022
WORK PLATFORM PROPOSED INSTALLATION OF WORK PLATFORM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
10 documents
Project M01342909Approved
Filing herewith for Interior work. Provide drywall enclosure for fire alarm conduit at locations indicated. Fire Alarm filed under separate application. No change to use, egress or occupancy.
On file for this project
2 documents
Floor 1Morgan North4p · 8 filings · 2 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sprinklers · Standpipe · Structural · Supported Scaffold · Support of Excavation
Project M00586183Signed-off · 03/22/2022
Installation of fuel oil storage tank in sub-cellar, install fuel oil piping system from storage tank to diesel generator sub base tank on the roof. No change of occupancy, egress or occupancy.
On file for this project
8 documents
Project M00346383Signed-off · 02/18/2022
SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Project M00349669Signed-off · 12/28/2021
Filing herewith for creation of raised or slab on grade at 1st floor. Creation of new shaft opening, bulkheads, new overbuild construction on top of the 7th floor, new skylight openings and new mechanical rooms. Provide support for mechanical equipment.
On file for this project
10 documents
Latest 3 of 8 filings on this floor.
CellarMorgan North3 filings
EquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural · Supported Scaffold · Support of Excavation
Project M00497527Signed-off · 03/16/2022
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCy.
On file for this project
7 documents
Project M00517320Signed-off · 03/16/2022
WORK PLATFORM PROPOSED INSTALLATION OF WORK PLATFORM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
1 document
Project M00456327Signed-off · 04/07/2021
Filing herewith for Support of excavation to facilitate installation of elevator pit and pile cap. No change to use, egress or occupancy.
On file for this project
7 documents
Sub-CellarFuel oil tank and piping installation1p · 1 filing
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Project M00586183Signed-off · 03/22/2022
Installation of fuel oil storage tank in sub-cellar, install fuel oil piping system from storage tank to diesel generator sub base tank on the roof. No change of occupancy, egress or occupancy.
On file for this project
8 documents
Site & exteriorProposed installation of plywood fence6 filings · 10 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
Project M00351565Signed-off · 02/18/2023
PLYWOOD FENCE PROPOSED INSTALLATION OF PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
7 documents
Project M00638836Signed-off · 02/17/2023
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
3 documents
Project M00643275Signed-off · 12/07/2022
INSTALLATION OF TEMPORARY BARRICADE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
1 document
Latest 3 of 6 filings on this floor.