← Back
Over six families without stores
341 EAST 6 STREET
MANHATTAN · East Village · BIN 1006290
💬 Discuss this project
1852Year Built
5Stories
C1Building Class
R8BZoning
10,860 sfGross Floor Area
20Units
Rent Stabilized20 Open Violations 19 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: 341 EAST 6TH STREET LLC · 2,835 sf lot · 3.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Roof1 filing · 10 docs
Floor 51 filing · 10 docs
Floor 44p · 3 filings · 20 docs
Floor 31 filing · 10 docs
Floor 210p · 4 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar5p · 3 filings · 20 docs
Site & exterior18p · 3 filings · 16 docs
Filed — no permit issued7p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHESTNUT HOLDINGS3607/08/2026
341 EAST 6203/21/2026
341 EAST 6TH STREET LLC103/22/2026
341 E6TH ST REALTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/12/2021$1.6M—— → WATERSIDE 1 LLC$149/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.R. FORDHAM PAINTING CORGeneral Contractor1607/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor707/08/2026
MRC CONSTRUCTION CORPGeneral Contractor203/21/2026
COW BAY SPRINKLER CORPGeneral Contractor207/08/2026
NEW YORK PLBG & HTG CORPPlumbing107/08/2026
ARISTON CHIMNEY LLCGeneral Contractor107/08/2026
EMPIRE & R GENERAL CONSTRGeneral Contractor107/08/2026
EVO ELECTRICAL CONTNG INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803707/19/2023
JIM KUSI, PE3757205/17/2023
NEW YORK ENGINEERING ASSO851306/21/2022
CLARKE ENGINEERING SERVIC3795103/31/2022
BEYOND ARCH LLC3600109/24/2021
Building Lifecycle
All (157)Filed (19)Permit Issued (16)Signed Off (8)Violation (60)Inspection (4)Objection (24)Special Inspection (26)
01/04/2026
Violation issued (HPD, open)
C
01/04/2026
Violation issued (HPD, open)
C
10/17/2025
Permit issued — General Construction
M00598476-I1-GC
08/14/2025
Permit issued — General Construction
M00598476-I1-GC
08/07/2025
Violation issued (HPD, closed)
C
08/07/2025
Violation issued (HPD, closed)
C
07/25/2025
Violation issued (HPD, open)
B
07/18/2025
Violation issued (HPD, closed)
C
06/01/2025
Violation issued (HPD, closed)
C
02/25/2025
Violation issued (HPD, closed)
C
11/07/2024
Signed off — Alteration
PLUMBING RENOVATION OF APT. 1A ON SECOND FLOOR TO INSTALL NEW APPLIANCE CONTROL VALVE AND FLEXIBLE CONNECTOR AND REPLACE STOVE IN THE APARTMENT. UPGRADE GAS METER BAR AND REPLACE PIPING WITH 3/4' BLACK PIPE AT CELLAR. CONTINUED IN COMMENTS.
M00597162-I1
09/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2024
Signed off — Alteration
INTERIOR RENOVATION OF APT 1A ON SECOND FLOOR. REMOVE ECB VIOLATION # 35250319L. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00597125-I1
08/19/2024
Filed — Alteration
PLUMBING RENOVATION OF APT. 1A ON SECOND FLOOR TO INSTALL NEW APPLIANCE CONTROL VALVE AND FLEXIBLE CONNECTOR AND REPLACE STOVE IN THE APARTMENT. UPGRADE GAS METER BAR AND REPLACE PIPING WITH 3/4' BLACK PIPE AT CELLAR. CONTINUED IN COMMENTS.
M00597162-P2
06/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2024
Filed — Alteration
PLUMBING RENOVATION OF APT. 1A ON SECOND FLOOR TO INSTALL NEW APPLIANCE CONTROL VALVE AND FLEXIBLE CONNECTOR AND REPLACE STOVE IN THE APARTMENT. UPGRADE GAS METER BAR AND REPLACE PIPING WITH 3/4' BLACK PIPE AT CELLAR. CONTINUED IN COMMENTS.
M00597162-P1
05/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/19/2024
Permit issued — Plumbing
M00597162-I1-PL
01/16/2024
Permit issued — General Construction
M00597125-I1-GC
10/05/2023
Signed off — Alteration
M00644577-I1
10/05/2023
Signed off — Alteration
TO REPAIR EXTERIOR FACADES INCLUDING BRICK MASONRY RE-STITCHING & RE-POINTING, NEW STUCCO AND RE-SETTING OF EXISTING PAVERS AT THE REAR. ETC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00633459-I1
10/03/2023
Signed off — Alteration
FILING TO PROVIDE OPEN PROBES AT LIMITED AREA OF CEILING AND FLOOR OF APT. 1A @ 2ND FLR AND 2ND FLR PUBLIC HALL. MINOR WOOD JOIST REPAIR AT 2ND FLR AS NOTED. EXISTING FIRE RATING MAINTAINED DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS, OCCUPANCY.
M00647214-I1
08/30/2023
Violation issued (HPD, closed)
A
08/21/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
08/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
08/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
08/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
08/03/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
08/03/2023
Special inspection requirement — Masonry
SAMI HAJJAR P.E
07/26/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
07/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/24/2023
Objection resolved — Addressed
07/24/2023
Objection resolved — Addressed
07/24/2023
Objection resolved — Addressed
07/19/2023
Filed — Alteration
FILING TO PROVIDE OPEN PROBES AT LIMITED AREA OF CEILING AND FLOOR OF APT. 1A @ 2ND FLR AND 2ND FLR PUBLIC HALL. MINOR WOOD JOIST REPAIR AT 2ND FLR AS NOTED. EXISTING FIRE RATING MAINTAINED DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS, OCCUPANCY.
M00647214-P4
07/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/18/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
07/17/2023
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARTY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00709541-I1
07/17/2023
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00609465-I1
06/29/2023
Permit issued — Supported Scaffold
M00709541-I1-SF
06/26/2023
Permit issued — General Construction
M00647214-I1-GC
06/23/2023
Filed — Alteration
TO REPAIR EXTERIOR FACADES INCLUDING BRICK MASONRY RE-STITCHING & RE-POINTING, NEW STUCCO AND RE-SETTING OF EXISTING PAVERS AT THE REAR. ETC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00633459-P1
06/21/2023
Permit issued — Structural
M00644577-I1-ST
06/01/2023
Permit issued — General Construction
M00597125-I1-GC
06/01/2023
Permit issued — General Construction
M00598476-I1-GC
05/17/2023
Filed — Alteration
FILING TO PROVIDE OPEN PROBES AT LIMITED AREA OF CEILING AND FLOOR OF APT. 1A @ 2ND FLR AND 2ND FLR PUBLIC HALL. MINOR WOOD JOIST REPAIR AT 2ND FLR AS NOTED. EXISTING FIRE RATING MAINTAINED DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS, OCCUPANCY.
M00647214-P3
05/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jim Kusi
05/16/2023
Special inspection requirement — Final
Jim Kusi
05/03/2023
Permit issued — General Construction
M00633459-I1-GC
04/23/2023
Violation issued (HPD, closed)
C
04/05/2023
Violation issued (HPD, closed)
C
04/05/2023
Violation issued (HPD, closed)
C
04/05/2023
Violation issued (HPD, closed)
B
01/19/2023
Violation issued (HPD, closed)
C
01/19/2023
Violation issued (HPD, closed)
B
01/04/2023
Permit issued — Sidewalk Shed
M00609465-I1-SH
12/20/2022
Violation issued (HPD, closed)
A
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ.R. FORDHAM PAINTING10/17/2025
DOB NOWGeneral ConstructionPermit IssuedJ.R. FORDHAM PAINTING08/14/2025
DOB NOWPlumbingSigned-offNEW YORK PLBG & HTG CORP03/19/2024
DOB NOWGeneral ConstructionSigned-offMRC CONSTRUCTION CORP01/16/2024
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC06/29/2023
DOB NOWGeneral ConstructionSigned-offCOW BAY SPRINKLER CORP06/26/2023
DOB NOWStructuralSigned-offCOW BAY SPRINKLER CORP06/21/2023
DOB NOWGeneral ConstructionSigned-offJ.R. FORDHAM PAINTING06/01/2023
DOB NOWGeneral ConstructionPermit IssuedJ.R. FORDHAM PAINTING06/01/2023
DOB NOWGeneral ConstructionSigned-offEMPIRE & R GENERAL CONSTR05/03/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC01/04/2023
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC06/03/2022
DOB NOWGeneral ConstructionPermit IssuedJ.R. FORDHAM PAINTING02/10/2022
DOB NOWGeneral ConstructionSigned-offARISTON CHIMNEY LLC02/01/2022
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC12/29/2021
DOB NOWGeneral ConstructionSigned-offJ.R. FORDHAM PAINTING10/27/2021
BISFBISSUEDJACK PICCINI, INC06/19/2007
BISBLISSUEDJACK PICCINI, INC11/30/2006
BISOTISSUED224 BUILDERS INC04/13/2000
1 project · most recent 10/29/2021
Others
FiledStatusContractorScopeMake / Model / Capacity
10/29/2021——Others
Other
Lifetime Chimney Supply XI1 Chimney ×1
1 project · most recent 09/24/2021
Gas Water/Sanitary
FiledStatusContractorScope
09/24/2021——Gas, Water/Sanitary
5 projects · most recent 08/10/2023
General Wiring
FiledStatusContractorScope
08/10/2023Permit IssuedOM ELECTRIC, INCGeneral Wiring
10/06/2021CompleteNASH ELECTRIC SERVICES IN—
09/17/2021Permit IssuedOM ELECTRIC, INCGeneral Wiring
08/23/2021CompleteOM ELECTRIC, INCGeneral Wiring
04/23/2018Permit IssuedEVO ELECTRICAL CONTNG INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/21/2023FinalSAMI HAJJAR P.Eprogress
08/21/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/21/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
08/03/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/03/2023FinalSAMI HAJJAR P.Eprogress
08/03/2023MasonrySAMI HAJJAR P.Especial
07/26/2023FinalSAMI HAJJAR P.Eprogress
07/26/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/26/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/18/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/18/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/18/2023FinalSAMI HAJJAR P.Eprogress
05/16/2023Fire-Resistant Penetrations and JointsJim Kusispecial
05/16/2023FinalJim Kusiprogress
08/05/2022Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/05/2022Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
08/05/2022FinalJim Kusiprogress
06/28/2022FinalLOUIS ARENAprogress
06/28/2022Chimneys and ventsLOUIS ARENAspecial
04/07/2022Post-installed AnchorsBrian Clarkespecial
10/29/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
09/22/2021FinalHackjong Choiprogress
09/22/2021Fire-Resistant Penetrations and JointsHackjong Choispecial
08/13/2021Chimneys and ventsLOUIS ARENAspecial
08/12/2021Mechanical SystemsLOUIS ARENAspecial
Latest 25 of 26.
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/03/2026M00597162-P1Request digital key ↗
09/03/2026M00597162-P2Request digital key ↗
09/03/2026M00597162-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits17
▸DOB NOWLPC Approval/Permit17
09/03/2026M00597162-P1Open ↗
09/03/2026M00597162-I1Open ↗
09/03/2026M00597162-P2Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/03/2026M00597162-I1Open ↗
09/03/2026M00597162-P1Open ↗
09/03/2026M00597162-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/28/2026M00633459-I1Open ↗
09/28/2026M00633459-I1Open ↗
09/02/2026M00644577-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/28/2026M00633459-I1Open ↗
09/02/2026M00644577-P1Open ↗
08/28/2026M00647214-P4Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/03/2026M00597162-I1Open ↗
09/03/2026M00597162-P1Open ↗
09/03/2026M00597162-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026M00633459-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00633459-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00646558-P1Open ↗
▸Other Documents4
▸DOB NOWHPD4: CONH Pilot Program4
09/03/2026M00597162-I1Open ↗
08/13/2026M00644577-I1Open ↗
08/13/2026M00647214-I1Open ↗
Showing 3 of 4 on file for this type