| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/01/2026 | Signed-off | CONSIGLI CONSTRUCTION CO | Air Conditioning Systems, Others, Refrigeration Systems, Ventilation Systems | Ventilation Climate ×2 Refrigeration Aermec NYG1800XH-A-J700 128 tons · Heat Pump Outdoor ×3 NYP1800A4-J70000 126 tons · Heat Pump Outdoor ×1 NYG1800XH°°J700B 128 tons · Heat Pump Outdoor ×2 NYG1800XH°°J700° 128 tons · Heat Pump Outdoor ×1 NYP1800X°J70000° 128 tons · Heat Pump Outdoor ×1 Other Guntner MDCHD-090.12X10 6,900,000 BTU ×4 Cooling |
| 02/19/2026 | Permit Issued | CROSS MANAGEMENT CORP | Heating Systems | Heating Energy Machines EMB-2295-1-7-UL_AHRI (R515B) 76 tons · Heat Pump Outdoor ×1 |
| 02/26/2025 | Signed-off | CONSIGLI CONSTRUCTION CO | Refrigeration Systems | Refrigeration Energy Machines EMA0.5 52 tons · Heat Pump Outdoor ×12 |
| 12/13/2022 | — | — | Air Conditioning Systems, Associated Ducts and Piping |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2026 | Signed-off | TRISTATE FIRE SPRINK INC | — |
| 04/16/2026 | Permit Issued | KG SPRINKLER CORP | 1,022 heads |
| 02/19/2026 | Permit Issued | SIRINA FIRE PROT CORP | — |
| 07/15/2025 | Signed-off | FULL CAPACITY FIRE CORP | 230 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/20/2026 | Signed-off | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| 04/16/2026 | Permit Issued | DONATO PLUMBING, INC | Water/Sanitary |
| 02/19/2026 | Signed-off | EVERGREEN MECHANICAL CORP | Water/Sanitary |
| 07/15/2025 | Signed-off | ZEREGA CONTRACTING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/24/2026 | Permit Issued | ECO ELECTRICAL SERVCS LLC | General Wiring |
| 05/19/2026 | Permit Issued | M.C. ELECTRICAL NY INC | General Wiring |
| 12/05/2025 | Complete | DELCO ELECTRICAL CORP. | General Wiring |
| 11/04/2025 | Permit Issued | TITAN ELEC'L & ELEV CONTR | General Wiring |
| 10/29/2025 | Complete | EPIC ELECTRIC INC | General Wiring |
| 10/13/2025 | Complete | M.C. ELECTRICAL NY INC | — |
| 03/20/2025 | Complete | ALLIANCE ELEVATOR COMPANY | — |
| 09/09/2024 | Complete | TEAM ELECTRIC, INC | General Wiring |
| 06/10/2024 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 02/20/2024 | Permit Issued | ROBERT CHIMENTI | 5 meters, 1 new_meters |
| 12/01/2023 | Permit Issued | TEAM ELECTRIC, INC | General Wiring |
| 08/17/2023 | Permit Issued | ALLIANCE ELEVATOR COMPANY | — |
| 02/07/2023 | Permit Issued | GT ELECTRICAL COMPANY INC | — |
| 11/16/2022 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 10/18/2022 | Permit Issued | ALLIANCE ELEVATOR COMPANY | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/11/2025 | Permit Issued | CONSIGLI CONSTRUCTION CO | Steel, Concrete |
| 03/31/2023 | Permit Issued | SOHO CONTRACTING CORP | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/25/2025 | Permit Issued | CARLITOS CONTRACTING CORP | Sidewalk Shed |
| 04/28/2025 | Permit Issued | CARLITOS CONTRACTING CORP | Fence |
| 04/10/2024 | Permit Issued | CARLITOS CONTRACTING CORP | Sidewalk Shed |
| 11/01/2023 | Permit Issued | EUROTECH CONSTRUCTION COR | Scaffold |
| Owner | Filings | Most Recent |
|---|---|---|
| TRINITY HUDSON HOLDINGS | 531 | 09/18/2026 |
| HINES | 128 | 09/13/2026 |
| EUROTECH CONSTRUCTION | 8 | 07/08/2026 |
| PYRAMID RESTORATION NY | 4 | 07/08/2026 |
| YATES RESTORATION GROUP, LTD. | 5 | 03/22/2026 |
| 561 HH LLC | 1 | 03/22/2026 |
| NYCAN BUILDERS | 1 | 03/22/2026 |
| REMAINDERMAN 1 HUDSON SQU | 6 | 03/22/2026 |
| REMAINDERMAN 345 HUDSON L | 2 | 03/22/2026 |
| CARLITOS CONSTRUCTION COR | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| JAROS BAUM & BOLLES | 68 | 06/01/2026 |
| COOKFOX ARCHITECTS | 28 | 05/13/2026 |
| SEVERUD ASSOCIATES CONSULTING ENGIN | 1 | 05/06/2026 |
| ROBERT DERECTOR ASSOCIATES | 34 | 04/16/2026 |
| DAVID J. CROWE ARCHITECTURE PLLC | 2 | 04/16/2026 |
| VOCON | 24 | 02/18/2026 |
| LEHMAN SMITH MCLEISH | 2 | 11/19/2025 |
| URBAN INTEGRATIONS | 7 | 09/25/2025 |
| PROJEKT COLLECTIV | 1 | 09/11/2025 |
| MONTROY ARCHITECTURE PLLC | 4 | 08/28/2025 |
| UNIVERSAL BUILDERS SUPPLY, LLC | 5 | 08/04/2025 |
| THORNTON TOMASETTI | 14 | 06/11/2025 |
| LEON SKVIRSKY PE | 1 | 03/12/2025 |
| SOCOTEC, INC. | 3 | 12/20/2024 |
| PLAN B ENGINEERING | 8 | 12/18/2024 |
| GOLDMAN COPELAND ASSOCIATES | 2 | 05/07/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 7 | 04/10/2024 |
| TOHFAZ UDDIN PE PC | 2 | 08/14/2023 |
| WSP | 2 | 06/13/2023 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 11/29/2022 |
| HOWARD I SHAPIRO & ASSOCIATES | 1 | 10/04/2022 |
| AMA CONSULTING ENGINEERS, PC | 1 | 08/18/2022 |
| GENSLER | 5 | 06/24/2022 |
| WB ENGINEERS & CONSULTANTS PLLC | 25 | 09/17/2021 |
| SHAABAN ENGINEERING, LLC | 2 | 06/17/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| BUILDING BROTHERS | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 146 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 14 | 03/21/2026 |
| Rigid Structural Design, LLC | 13 | 03/21/2026 |
| CORNERSTONE CONSULTING | 74 | 03/21/2026 |
| ARCHETYPE CONSULTANTS | 40 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 26 | 03/21/2026 |
| PYRAMID RESTORATION NY | 2 | 03/21/2026 |
| METROPOLIS GROUP INC | 60 | 03/21/2026 |
| KAZAM CONSULTANTS | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TISHMAN CONSTRUCTION CORP | General Contractor | 47 | 07/08/2026 |
| NYCAN BUILDERS LLC | General Contractor | 20 | 09/18/2026 |
| CONSIGLI CONSTRUCTION CO | General Contractor | 19 | 07/08/2026 |
| TISHMAN INTERIORS CORP | General Contractor | 17 | 07/08/2026 |
| CARLITOS CONTRACTING CORP | General Contractor | 16 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 14 | 07/08/2026 |
| W5 GROUP LLC | General Contractor | 14 | 03/21/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 11 | 07/08/2026 |
| PLUMBING NYC, INC | Fire Protection | 10 | 07/08/2026 |
| DARBY CONSTRUCTION SVC LL | General Contractor | 10 | 07/08/2026 |
| KG SPRINKLER CORP | Fire Protection | 9 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 9 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 9 | 07/08/2026 |
| EAGLE SCAFFOLDING SVCS INC | General Contractor | 6 | 07/08/2026 |
| STARR INDUSTRIES LLC | General Contractor | 6 | 07/08/2026 |
| DONATO PLUMBING GROUP INC | Plumbing | 5 | 07/08/2026 |
| FRANKIE PLBG & HTG L.L.C | Plumbing | 5 | 07/08/2026 |
| M & S BUILDINGS SERVICES | Fire Protection | 4 | 07/08/2026 |
| UNIVERSAL BUILD SUPP LLC | General Contractor | 4 | 07/08/2026 |
| TRISTATE FIRE SPRINK INC | Fire Protection | 4 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 3 | 09/18/2026 |
| EUROTECH CONSTRUCTION CORP | General Contractor | 3 | 07/08/2026 |
| UNIVERSAL FIRE SPR LLC | Fire Protection | 3 | 07/08/2026 |
| JDP MECHANICAL INC | General Contractor | 3 | 04/09/2026 |
| COMPLEX DEVELOPMENT INC | General Contractor | 3 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ATLAS ATC ENGINEERING INC | 8011 | 87 | 06/01/2026 |
| PROJECT TACTICAL SOLUTION | 5859 | 7 | 05/06/2026 |
| SAG ENGINEERING & CONSULT | 608 | 39 | 02/19/2026 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 24 | 10/30/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 2 | 07/16/2025 |
| CONSULTING AND TESTING SE | 6152 | 18 | 05/07/2024 |
| DNA CONTROLLED INSPECTION | 554 | 23 | 09/20/2022 |
| MILROSE CONSULTANTS LLC | 2003 | 1 | 08/18/2022 |
| SOCOTEC ENGINEERING | 4983 | 2 | 09/17/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | NYCAN BUILDERS LLC | 09/17/2026 |
| DOB NOW | General Construction | Permit Issued | NYCAN BUILDERS LLC | 09/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/17/2026 |
| DOB NOW | Structural | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/17/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/16/2026 |
| DOB NOW | Structural | Permit Issued | NYCAN BUILDERS LLC | 09/11/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CARLITOS CONTRACTING CORP | 06/22/2026 |
| DOB NOW | Structural | Permit Issued | NYCAN BUILDERS LLC | 05/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 05/05/2026 |
| DOB NOW | Sprinklers | Signed-off | EVERGREEN MECHANICAL CORP | 04/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | EVERGREEN MECHANICAL CORP | 04/30/2026 |
| DOB NOW | Plumbing | Permit Issued | SIRINA FIRE PROT CORP | 03/30/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CARLITOS CONTRACTING CORP | 03/19/2026 |
| DOB NOW | Construction Fence | Permit Issued | CARLITOS CONTRACTING CORP | 03/19/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NYCAN BUILDERS LLC | 03/16/2026 |
| DOB NOW | Sprinklers | Signed-off | PLUMBING NYC, INC | 03/16/2026 |
| DOB NOW | General Construction | Permit Issued | CROSS MANAGEMENT CORP | 03/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | DONATO PLUMBING, INC | 03/13/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CROSS MANAGEMENT CORP | 03/13/2026 |
| DOB NOW | Plumbing | Permit Issued | H M SPRINKLER INC | 03/13/2026 |
| DOB NOW | General Construction | Permit Issued | NYCAN BUILDERS LLC | 02/17/2026 |
| DOB NOW | General Construction | Permit Issued | JDP MECHANICAL INC | 01/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JDP MECHANICAL INC | 01/29/2026 |
| DOB NOW | Sprinklers | Signed-off | M & S BUILDINGS SERVICES | 01/20/2026 |
| DOB NOW | Supported Scaffold | Signed-off | UNIVERSAL BUILD SUPP LLC | 12/29/2025 |
| DOB NOW | Structural | Permit Issued | CONSIGLI CONSTRUCTION CO | 12/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CONSIGLI CONSTRUCTION CO | 12/19/2025 |
| DOB NOW | General Construction | Signed-off | CONSIGLI CONSTRUCTION CO | 12/19/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | STREAMLINE CONSULTANTS NY | 12/04/2025 |
| DOB NOW | Sprinklers | Signed-off | PLUMBING NYC, INC | 11/17/2025 |
| DOB NOW | Standpipe | Signed-off | PLUMBING NYC, INC | 11/17/2025 |
| DOB NOW | Mechanical Systems | Signed-off | NYCAN BUILDERS LLC | 11/10/2025 |
| DOB NOW | Plumbing | Signed-off | FRANKIE PLBG & HTG L.L.C | 11/07/2025 |
| DOB NOW | General Construction | Signed-off | NYCAN BUILDERS LLC | 11/05/2025 |
| DOB NOW | General Construction | Permit Issued | ON-TRAC CONSTRUCTION ASSO | 10/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | UNIVERSAL BUILD SUPP LLC | 10/21/2025 |
| DOB NOW | Structural | Permit Issued | CONSIGLI CONSTRUCTION CO | 09/30/2025 |
| DOB NOW | Sprinklers | Signed-off | BLUEWATER PLBG& HTG INC | 09/24/2025 |
| DOB NOW | General Construction | Signed-off | SOVA CONSTRUCTION INC | 09/17/2025 |
| DOB NOW | Sprinklers | Signed-off | ZEREGA CONTRACTING CORP | 09/04/2025 |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/20/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 08/05/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/26/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/03/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/29/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/03/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/25/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/20/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/12/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/10/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/29/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 01/29/2026 | Pass-Final SD - Up to 3 Requested Floors | Pass | View ↗ |
| 01/29/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 01/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/28/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/28/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/28/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/06/2026 | Mastic and Intumescent Fire-resistant Coatings | RONALD GRAPIN | special |
| 07/06/2026 | Air barrier - visual inspection | RONALD GRAPIN | energy_progress |
| 07/06/2026 | Fenestration air leakage | RONALD GRAPIN | energy_progress |
| 07/06/2026 | Energy Code Compliance Inspections | RONALD GRAPIN | progress |
| 07/06/2026 | Fenestration areas | RONALD GRAPIN | energy_progress |
| 07/06/2026 | Sprayed fire-resistant materials | RONALD GRAPIN | special |
| 07/06/2026 | Fenestration and door U-factor and product ratings | RONALD GRAPIN | energy_progress |
| 07/06/2026 | Fire-Resistance Rated Construction | RONALD GRAPIN | progress |
| 07/06/2026 | Wall Panels, Curtain Walls, and Veneers | RONALD GRAPIN | special |
| 07/06/2026 | Preliminary | RONALD GRAPIN | progress |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | RONALD GRAPIN | special |
| 07/06/2026 | Insulation placement and R values | RONALD GRAPIN | energy_progress |
| 07/06/2026 | Post-installed Anchors | RONALD GRAPIN | special |
| 07/06/2026 | Masonry | RONALD GRAPIN | special |
| 05/27/2026 | Fenestration areas | RONALD GRAPIN | energy_progress |
| 05/27/2026 | Interior lighting power | RONALD GRAPIN | energy_progress |
| 05/27/2026 | Insulation placement and R values | RONALD GRAPIN | energy_progress |
| 05/27/2026 | Wall Panels, Curtain Walls, and Veneers | RONALD GRAPIN | special |
| 05/27/2026 | Fenestration air leakage | RONALD GRAPIN | energy_progress |
| 05/27/2026 | Sprayed fire-resistant materials | RONALD GRAPIN | special |
| 05/27/2026 | Fire-Resistant Penetrations and Joints | RONALD GRAPIN | special |
| 05/27/2026 | Lighting controls | RONALD GRAPIN | energy_progress |
| 05/27/2026 | Air barrier - visual inspection | RONALD GRAPIN | energy_progress |
| 05/27/2026 | Mastic and Intumescent Fire-resistant Coatings | RONALD GRAPIN | special |
| 05/27/2026 | Exterior lighting power | RONALD GRAPIN | energy_progress |