← Back
BuildNYC
Elevator apt, semi-fireproof with stores
341 ST NICHOLAS AVENUE
MANHATTAN · BIN 1059391
💬 Discuss this project
1926Year Built
6Stories
D7Building Class
R8Zoning
39,486 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized21 Active Violations ▸
Elevator apt, semi-fireproof with stores · 8,278 sf lot · 4.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSugaree Realty LLC4p · 2 filings · 20 docs
Floor 1Jm Realty Services14p · 4 filings · 20 docs
CellarJm Realty Services7p · 1 filing · 9 docs
Site & exteriorJm Realty Services1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
341 St Nicholas6003/22/2026
Phoenix603/21/2026
545 Edgecombe Partners403/21/2026
Sugaree203/21/2026
JM Realty Services110/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/05/2021$315K—Private party → Private party$8/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pacifico Engineering209/10/2026
Construction Management & Safety Con405/11/2022
Draft Master Engineering205/13/2021
Benjamin Sasson102/12/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OM ElectricElectrical403/21/2026
Macreddin Plumbing & HeatingPlumbing407/08/2026
Pobla Mex ConstructionGeneral Contractor303/21/2026
Pobla Mex ConstructionScaffold303/21/2026
OM ElectricElectrical303/22/2026
Mega Mechanicalspecialty_contractor107/08/2026
Cape PlumbingPlumbing107/08/2026
Best Energy Power 2015General Contractor107/08/2026
Rem & Sons Lic Electric ContElectrical103/21/2026
Power Surge ElectricElectrical103/21/2026
Power Surge ElectricElectrical103/22/2026
Berger Quality Electrical ConElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pacifico Engineering3157209/10/2026
CMSC6098205/11/2022
Draft Master Engineering701205/13/2021
Building Lifecycle
All (116)Filed (9)Permit Issued (6)Signed Off (6)Violation (60)Inspection (3)Objection (4)Special Inspection (28)
09/16/2026
Signed off — Alteration
Installation of pv solar energy system on roof. No change of use, egress, or occupancy.
M01396940-I1
09/10/2026
Filed — Alteration
Installation of pv solar energy system on roof. No change of use, egress, or occupancy.
M01396940-P1
09/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
09/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
09/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
09/01/2026
Special inspection requirement — Final
Ralph Pacifico
09/01/2026
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
06/29/2026
Violation issued (HPD, closed)
B
06/22/2026
Violation issued (HPD, closed)
C
06/22/2026
Violation issued (HPD, closed)
C
06/22/2026
Violation issued (HPD, closed)
C
06/22/2026
Violation issued (HPD, closed)
C
05/21/2026
Permit issued — Solar
M01396940-I1-SL
05/19/2026
Filed — Alteration
Installation of pv solar energy system on roof. No change of use, egress, or occupancy.
M01396940-I1
05/18/2026
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
05/04/2026
Special inspection requirement — Final
Ralph Pacifico
04/29/2026
Violation issued (HPD, closed)
A
02/17/2026
Violation issued (HPD, closed)
C
02/17/2026
Violation issued (HPD, closed)
C
02/17/2026
Violation issued (HPD, closed)
C
02/17/2026
Violation issued (HPD, closed)
B
01/10/2026
Violation issued (HPD, closed)
B
01/10/2026
Violation issued (HPD, closed)
C
01/10/2026
Violation issued (HPD, closed)
C
01/10/2026
Violation issued (HPD, closed)
C
12/17/2025
Violation issued (HPD, closed)
C
12/17/2025
Violation issued (HPD, closed)
A
12/17/2025
Violation issued (HPD, closed)
C
12/17/2025
Violation issued (HPD, closed)
B
12/17/2025
Violation issued (HPD, closed)
B
12/17/2025
Violation issued (HPD, closed)
B
12/10/2025
Violation issued (HPD, closed)
C
12/10/2025
Violation issued (HPD, closed)
C
12/10/2025
Violation issued (HPD, closed)
B
12/10/2025
Violation issued (HPD, closed)
B
12/10/2025
Violation issued (HPD, closed)
C
11/30/2025
Violation issued (HPD, closed)
C
11/08/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
A
10/22/2025
Violation issued (HPD, closed)
A
10/22/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
B
10/07/2025
Violation issued (HPD, closed)
C
10/07/2025
Violation issued (HPD, closed)
B
06/05/2025
Violation issued (HPD, closed)
C
06/04/2025
Violation issued (HPD, closed)
A
04/23/2025
Violation issued (HPD, closed)
C
03/17/2025
Violation issued (HPD, closed)
C
03/14/2025
Violation issued (HPD, closed)
A
03/14/2025
Violation issued (HPD, closed)
C
03/09/2025
Violation issued (HPD, closed)
A
01/08/2025
Violation issued (HPD, closed)
C
12/30/2024
Violation issued (HPD, closed)
C
12/26/2024
Violation issued (HPD, closed)
C
12/26/2024
Violation issued (HPD, closed)
C
12/26/2024
Violation issued (HPD, closed)
C
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBest Energy Power 201505/21/2026
DOB NOWPlumbingSigned-offCape Plumbing10/14/2022
DOB NOWGeneral ConstructionSigned-offPobla Mex Construction05/13/2022
DOB NOWPlumbingSigned-offMacreddin Plumbing & Heating12/21/2020
DOB NOWMechanical SystemsSigned-offMega Mechanical12/11/2020
DOB NOWConstruction FenceSigned-offPobla Mex Construction03/10/2020
BISPLISSUEDMacreddin Plumbing & Heating11/09/2023
BISOTISSUEDAlfred Construction03/12/2021
BISOTISSUEDAlfred Construction12/26/2020
BISOTISSUEDAlfred Construction11/10/2020
BISOTISSUEDPobla Mex Construction11/06/2020
BISPLISSUEDMacreddin Plumbing & Heating10/08/2020
BISPLISSUEDAAA Total Plumbing06/05/2019
BISOTISSUEDHonor Construction05/31/2019
BISOTISSUEDHonor Construction05/30/2019
BISPLISSUEDInfiniti Esc Plumbing10/15/2018
BISPLISSUEDAAA Total Plumbing09/11/2018
BISOTISSUEDHonor Construction08/10/2018
BISPLISSUEDMacreddin Plumbing & Heating08/08/2018
BISOTISSUEDAlfred Construction08/01/2018
BISPLISSUEDAAA Total Plumbing07/23/2018
BISOTISSUEDHonor Construction07/19/2018
BISMHISSUEDKS Mechanical09/12/2017
BISMHISSUEDKS Mechanical09/12/2017
BISMHISSUEDKS Mechanical09/12/2017
BISMHISSUEDKS Mechanical09/12/2017
BISPLISSUEDZone Plumbing & Heating08/25/2017
BISOTISSUEDHonor Construction08/16/2017
BISPLISSUEDInfiniti Esc Plumbing04/20/2017
BISOTISSUEDA.R.G.G. Construction03/30/2017
BISOTISSUEDA.R.G.G. Construction03/30/2017
BISOTISSUEDA.R.G.G. Construction02/08/2017
BISPLISSUEDAD Plumbing01/12/2017
BISOTISSUEDA.R.G.G. Construction12/08/2016
BISOTISSUEDInter Renovation06/27/2016
BISOTISSUEDInter Renovation04/08/2016
BISOTISSUEDA.R.G.G. Construction04/05/2016
BISEQISSUEDInter Renovation03/04/2016
BISEQISSUEDPhoenix Sutton STR02/26/2016
BISEQISSUEDPhoenix Sutton STR01/26/2016
+ 16 more permits on file
20 projects · most recent 09/04/2026
General Wiring
FiledStatusContractorScope
09/04/2026CompleteOM Electric—
01/06/2026CompleteBerger Quality Electrical Con—
10/30/2024CompleteOM ElectricGeneral Wiring
01/03/2024CompleteOM ElectricGeneral Wiring
01/03/2024CompleteOM ElectricGeneral Wiring
10/24/2023CompleteOM ElectricGeneral Wiring
10/24/2023CompleteOM ElectricGeneral Wiring
10/24/2023CompleteOM ElectricGeneral Wiring
09/12/2023CompleteOM ElectricGeneral Wiring
09/12/2023CompleteOM ElectricGeneral Wiring
09/12/2023CompleteOM ElectricGeneral Wiring
09/12/2023CompleteOM ElectricGeneral Wiring
05/09/2022CompleteOM ElectricGeneral Wiring
02/04/2021CompleteOM ElectricGeneral Wiring
11/19/2020CompleteOM ElectricGeneral Wiring
1 project · most recent 09/10/2026
FiledStatusContractorScope
09/10/2026Signed-offBest Energy Power 201572 panels, 31.32 kw, 6,338 roof_area_sqft
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/14/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
09/01/2026Fire-Resistant Penetrations and JointsRalph Pacificospecial
09/01/2026Structural Stability – Alterations of existing buildingsRalph Pacificospecial
09/01/2026Energy Code Compliance InspectionsRalph Pacificoprogress
09/01/2026FinalRalph Pacificoprogress
09/01/2026Air barrier - visual inspectionRalph Pacificoenergy_progress
05/18/2026Air barrier - visual inspectionRalph Pacificoenergy_progress
05/18/2026Structural Stability – Alterations of existing buildingsRalph Pacificospecial
05/04/2026Fire-Resistant Penetrations and JointsRalph Pacificospecial
05/04/2026Energy Code Compliance InspectionsRalph Pacificoprogress
05/04/2026FinalRalph Pacificoprogress
04/19/2022Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
05/17/2021Mechanical SystemsANTHONY GURBALLspecial
05/17/2021FinalANTHONY GURBALLprogress
05/17/2021Fire-Resistant Penetrations and JointsANTHONY GURBALLspecial
05/17/2021HVAC and service water heating system controls ANTHONY GURBALLenergy_progress
05/17/2021Energy Code Compliance InspectionsANTHONY GURBALLprogress
05/17/2021Maintenance informationANTHONY GURBALLenergy_progress
05/17/2021HVAC insulation and sealing ANTHONY GURBALLenergy_progress
05/17/2021HVAC and service water heating equipment ANTHONY GURBALLenergy_progress
05/12/2021Energy Code Compliance InspectionsANTHONY GURBALLprogress
05/12/2021Fire-Resistant Penetrations and JointsANTHONY GURBALLspecial
05/12/2021Mechanical SystemsANTHONY GURBALLspecial
05/12/2021FinalANTHONY GURBALLprogress
05/12/2021HVAC and service water heating system controls ANTHONY GURBALLenergy_progress
05/12/2021HVAC and service water heating equipment ANTHONY GURBALLenergy_progress
Latest 25 of 28.
▾Documents — 672 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch3
09/02/2026M00724367-I1Request digital key ↗
08/17/2026M01396940-I1Request digital key ↗
08/14/2026M00721972-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00436610-P1Request digital key ↗
09/04/2026M00436610-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00425570-I1Request digital key ↗
08/15/2026M00425570-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00311399-I1Request digital key ↗
▸Applications & Permits133
▸BISPLAN / WORK APPROVAL APPLICATION79
05/15/2024121158013Open ↗
04/26/2024100813434Open ↗
03/19/2024101492831Open ↗
Showing 3 of 79 on file for this type
▸BISWORK PERMIT APPLICATION53
11/09/2023121158013Open ↗
11/10/2020123867627Open ↗
11/09/2020121158013Open ↗
Showing 3 of 53 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications147
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION70
02/07/2020123867627Open ↗
12/18/2019120243913Open ↗
12/18/2019120243913Open ↗
Showing 3 of 70 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
05/31/2019123158091Open ↗
Showing 1 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
10/14/2026M01396940-P1Open ↗
10/14/2026M01396940-P1Open ↗
08/31/2026M01396940-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
05/31/2019123158091Open ↗
Showing 1 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
10/14/2026M01396940-P1Open ↗
09/04/2026M00436610-P1Open ↗
09/04/2026M00436610-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/14/2026M01396940-P1Open ↗
08/31/2026M01396940-I1Open ↗
08/27/2026M00436610-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment51
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE23
01/30/2020121158013Open ↗
10/03/2019123158091Open ↗
07/09/2019123158091Open ↗
Showing 3 of 23 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/28/2023121022348Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/28/2023121022348Open ↗
▸BISEQUIPMENT USE PERMITS1
11/28/2023121022348Open ↗
▸Safety & Tenant Protection21
▸BISTenant Protection Plan and Notes16
05/31/2019123158091Open ↗
12/26/2023102189542Open ↗
08/17/2020123867627Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWTenant Protection Plan5
09/04/2026M00436610-I1Open ↗
09/04/2026M00436610-P1Open ↗
08/13/2026M00311399-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos35
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
02/07/2020123867627Open ↗
05/31/2019123158091Open ↗
Showing 2 of 19 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
10/14/2026M01396940-P1Open ↗
09/04/2026M00436610-P1Open ↗
09/04/2026M00436610-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance56
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS30
02/07/2020123867627Open ↗
05/31/2019123158091Open ↗
04/19/2019123346771Open ↗
Showing 3 of 30 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
12/01/2021123867627Open ↗
06/05/2020123158091Open ↗
04/19/2019123346771Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/28/2023121022348Open ↗
11/15/2023121022348Open ↗
12/01/2021123867627Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/28/2023121022348Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/28/2023121022348Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY15
11/28/2023121022348Open ↗
11/16/2023121022348Open ↗
11/16/2023102189542Open ↗
Showing 3 of 15 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
12/29/2023102189542Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
11/28/2023121022348Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/28/2023121022348Open ↗
▸Approvals, Objections & Sign-offs57
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
01/04/2024102189542Open ↗
11/29/2023121022348Open ↗
12/07/2021123867627Open ↗
Showing 3 of 31 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
11/09/2020123867627Open ↗
11/09/2020123867627Open ↗
11/09/2020123867627Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
11/28/2023121022348Open ↗
▸BISFINAL1
12/03/2021123867627Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership63
▸BISCOST AFFIDAVIT49
01/03/2024102189542Open ↗
12/01/2021123867627Open ↗
06/05/2020123158091Open ↗
Showing 3 of 49 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/28/2023121022348Open ↗
▸Filing & Intake Forms78
▸BISBOROUGH INTAKE FORM37
11/09/2023121158013Open ↗
10/19/2020121158013Open ↗
05/15/2020123158091Open ↗
Showing 3 of 37 on file for this type
▸BISEFILING COVER SHEET21
02/07/2020123867627Open ↗
05/31/2019123158091Open ↗
Showing 2 of 21 on file for this type
▸BISADDITIONAL INFORMATION17
11/29/2021123867627Open ↗
11/16/2021123867627Open ↗
06/02/2021123867627Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/03/2018122610273Open ↗
Showing 1 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type