← Back
BuildNYC
Over six families without stores
3410 KINGSBRIDGE AVENUE
BRONX · BIN 2083685
💬 Discuss this project
1927Year Built
5Stories
C1Building Class
R6Zoning
142,500 sfGross Floor Area
117Units
LL97 CoveredRent Stabilized217 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Over six families without stores · Owner of record: 3410 Kingsbridge · 14,550 sf lot · 9.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMasonry parapet repair1p · 1 filing · 5 docs
Site & exteriorHeavy duty sidewalk shed installation3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Comprehensive Designs303/22/2026
3410 Kingsbridge303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2026$8.4M—3410 KINGSBRIDGE LLC → FLGSP 3410 KINGSBRIDGE AVE LLC$59/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMB Design Group104/01/2022
Lighthouse106/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ramapo CommunicationGeneral Contractor303/21/2026
Tri-State ContractingGeneral Contractor103/21/2026
Topline NYC ContractingScaffold107/08/2026
Ariston ChimneyGeneral Contractor105/23/2016
G. BauerGeneral Contractor106/25/2015
Mohammed HalimGeneral Contractor207/01/2014
Ricky & Brothers ConstructionGeneral Contractor210/12/1999
Triple G ConstructionGeneral Contractor106/05/2001
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KMB Design Group513104/01/2022
Building Lifecycle
10/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/05/2026
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 25C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD violation · open
06/05/2026
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED…
HPD violation · open
06/05/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT…
HPD violation · open
06/05/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st DOOR FROM WEST AT NORTH WALL IN THE 4th…
HPD violation · open
209 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRamapo Communication04/28/2022
DOB NOWSidewalk ShedPermit IssuedTopline NYC Contracting06/28/2019
BISOTISSUEDAriston Chimney05/23/2016
BISOTISSUEDG. Bauer06/25/2015
BISEQISSUEDTri-State Contracting12/30/2014
BISOTISSUEDMohammed Halim07/01/2014
BISOTISSUEDMohammed Halim04/30/2014
BISEQISSUEDTri-State Contracting03/20/2014
BISOTISSUEDTriple G Construction06/05/2001
BISEQISSUEDRicky & Brothers Construction10/12/1999
BISOTISSUEDRicky & Brothers Construction10/12/1999
2 projects · most recent 03/18/2026
FiledStatusContractorScope
03/18/2026Permit IssuedAll Ways Electric Corp.w—
06/26/2019Permit IssuedRichard Neu—
1 project · most recent 06/26/2019
Sidewalk Shed
FiledStatusContractorScope
06/26/2019Permit IssuedTopline NYC ContractingSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/01/2022MasonryEkata Shahspecial
03/23/2022FinalEkata Shahprogress
75 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account